{"id":"55b97f66-e1eb-4082-b5f2-67c8c3f4f0c7","editionMonth":"2026-08-01","editionVersion":"trust-2026-08","title":"Solar Analytica Trust Register, August 2026","summary":"Monthly fixed edition of product status, declarations, release verification, corrections and review state.","releaseStatus":"published","publishedAt":"2026-08-01T02:00:32.719+00:00","productCount":25,"declarationsCount":25,"receiptsPassed":11,"receiptsWarning":1,"receiptsFailed":0,"openCorrections":0,"snapshot":{"links":{"register":"https://solaranalytica.com/data-trust","catalogue":"https://solaranalytica.com/data-trust/catalog.jsonld","corrections":"https://solaranalytica.com/data-trust/corrections.json","methodology":"https://solaranalytica.com/methodology"},"records":[{"product":{"route":"/markets","title":"Market Profile Editions","pillar":"Market intelligence","cadence":"Monthly and on material source change","coverage":"WA / SWIS at launch; reusable international market contract","sourceUrl":"https://solaranalytica.com/markets","knownLimit":"A fixed edition is a citable snapshot, not a substitute for the live market ledgers.","productKey":"market-profile-editions","description":"Fixed, comparable market-profile snapshots with material changes and release checks.","sourceLabel":"Solar Analytica market profile ledger","currentVersion":"au-wa-swis-2026-07","dataConfidence":"High","expectedNextAt":"2026-08-31T00:00:00+00:00","freshnessBasis":"source_check","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-31T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-31","latestRetrievedAt":"2026-07-31T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-31","observationPeriodEnd":"2026-05-31","lastMaterialReleaseAt":null,"latestObservationDate":"2026-05-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Solar Analytica market profile ledger is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"WA / SWIS at launch; reusable international market contract","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"A fixed edition is a citable snapshot, not a substitute for the live market ledgers.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Monthly and on material source change. Next expected check: 2026-08-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /markets; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: au-wa-swis-2026-07.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/data/grid-sources","title":"Grid Source Registry","pillar":"Market structure","cadence":"Monthly terms review; source-specific operational refresh","coverage":"NEM, SWIS, Great Britain, selected US balancing authorities and European bidding zones","sourceUrl":"https://solaranalytica.com/data/grid-sources","knownLimit":"The registry documents primary production-side feeds. It does not reproduce Electricity Maps flow-traced consumption accounting or forecasts.","productKey":"grid-source-registry","description":"Provider, access, reuse and integration contracts for the primary grid feeds beneath Solar Analytica operations data.","sourceLabel":"AEMO, EIA, ENTSO-E and Elexon","currentVersion":"grid-source-registry-v1","dataConfidence":"High","expectedNextAt":null,"freshnessBasis":"source_check","lifecycleClass":"periodic","sourceCheckedAt":null,"parentProductKey":null,"latestReleaseDate":null,"latestRetrievedAt":null,"operationalStatus":"current","sourceReleaseDate":null,"observationPeriodEnd":null,"lastMaterialReleaseAt":null,"latestObservationDate":null},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO, EIA, ENTSO-E and Elexon is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"NEM, SWIS, Great Britain, selected US balancing authorities and European bidding zones","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The registry documents primary production-side feeds. It does not reproduce Electricity Maps flow-traced consumption accounting or forecasts.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Monthly terms review; source-specific operational refresh. No fixed publisher date is recorded; review is event-driven.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /data/grid-sources; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: grid-source-registry-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"Monthly terms review; source-specific operational refresh; no fixed publisher date.","status":"event_driven"},"verification":{"status":"warning","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"One or more publication-contract fields require remediation.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/transition-delivery","title":"Transition Delivery Ledger","pillar":"Transition accountability","cadence":"Monthly citable edition with event-driven material changes","coverage":"Initial Australian market, product-permission and global solar-pipeline baseline","sourceUrl":"https://solaranalytica.com/transition-delivery","knownLimit":"The first edition is a bounded baseline, not a complete inventory of every transition project or jurisdiction.","productKey":"transition-delivery","description":"Forecasts joined to permission, delivery, observed operation and later revision.","sourceLabel":"AEMO, Clean Energy Regulator, California Energy Commission and Global Energy Monitor","currentVersion":"transition-delivery-2026-07","dataConfidence":"High","expectedNextAt":"2026-08-31T23:59:59+00:00","freshnessBasis":"source_check","lifecycleClass":"periodic","sourceCheckedAt":null,"parentProductKey":null,"latestReleaseDate":"2026-07-27","latestRetrievedAt":"2026-07-27T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":null,"observationPeriodEnd":null,"lastMaterialReleaseAt":null,"latestObservationDate":"2026-07-27"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO, Clean Energy Regulator, California Energy Commission and Global Energy Monitor is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Initial Australian market, product-permission and global solar-pipeline baseline","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The first edition is a bounded baseline, not a complete inventory of every transition project or jurisdiction.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Monthly citable edition with event-driven material changes. Next expected check: 2026-08-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /transition-delivery; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: transition-delivery-2026-07.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-31T23:59:59+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/product-evidence","title":"Product-Market Evidence","pillar":"Global","cadence":"Weekly source checks; monthly review","coverage":"Australia modules, inverters and batteries; California modules","sourceUrl":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme","knownLimit":"Release metadata will become current after the next certification pipeline run.","productKey":"product-market-evidence","description":"Exact-model traces from product and manufacturer to monitored source lists and market rules.","sourceLabel":"Clean Energy Regulator and California Energy Commission","currentVersion":"certifications-2026-07-27","dataConfidence":"High","expectedNextAt":"2026-08-03T08:16:50.192+00:00","freshnessBasis":"source_check","lifecycleClass":"reference","sourceCheckedAt":"2026-07-27T08:16:50.192+00:00","parentProductKey":"approved-products","latestReleaseDate":"2026-07-27","latestRetrievedAt":"2026-07-27T08:16:50.192+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-27","observationPeriodEnd":"2026-07-27","lastMaterialReleaseAt":"2026-07-27T08:16:50.192+00:00","latestObservationDate":"2026-07-27"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Clean Energy Regulator and California Energy Commission is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Australia modules, inverters and batteries; California modules","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Release metadata will become current after the next certification pipeline run.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Weekly source checks; monthly review. Next expected check: 2026-08-03.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /product-evidence; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: certifications-2026-07-27.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-03T08:16:50.192+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/forecast-accountability","title":"Forecast Accountability","pillar":"Forecasts","cadence":"On source edition and observed release","coverage":"SWIS planning forecasts; expandable by source edition","sourceUrl":"https://www.aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem/wem-forecasting-and-planning/wem-electricity-statement-of-opportunities-wem-esoo","knownLimit":"Most forecast periods are not yet due; no observed value is inferred before an authoritative release.","productKey":"forecast-accountability","description":"Named forecast editions retained beside later observed outcomes.","sourceLabel":"Australian Energy Market Operator","currentVersion":"2026-wem-esoo","dataConfidence":"High","expectedNextAt":"2027-07-31T00:00:00+00:00","freshnessBasis":"editorial_review","lifecycleClass":"edition","sourceCheckedAt":"2026-07-20T13:49:38.413971+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-20","latestRetrievedAt":"2026-07-20T13:49:38.413971+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-20","observationPeriodEnd":null,"lastMaterialReleaseAt":"2026-07-20T00:00:00+00:00","latestObservationDate":null},"quality":{"dimensions":[{"key":"institutional_environment","note":"Australian Energy Market Operator is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"SWIS planning forecasts; expandable by source edition","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Most forecast periods are not yet due; no observed value is inferred before an authoritative release.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"On source edition and observed release. Next expected check: 2027-07-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /forecast-accountability; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: 2026-wem-esoo.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-07-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/opportunity-scanner","title":"Market Opportunity Scanner","pillar":"Global","cadence":"Daily operations and source releases","coverage":"17 operational and national market surfaces","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Composite status depends on several source-specific releases.","productKey":"market-opportunity-scanner","description":"Transparent screening of storage need, solar momentum, flexible-load value and transition pressure.","sourceLabel":"AEMO, Elexon, Ember and Global Energy Monitor","currentVersion":"opportunity-model-v1","dataConfidence":"High","expectedNextAt":null,"freshnessBasis":"observation_period","lifecycleClass":"model","sourceCheckedAt":"2026-07-21T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-21","latestRetrievedAt":"2026-07-21T00:00:00+00:00","operationalStatus":"recovering","sourceReleaseDate":"2026-07-21","observationPeriodEnd":"2026-07-21","lastMaterialReleaseAt":"2026-07-21T00:00:00+00:00","latestObservationDate":"2026-07-21"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO, Elexon, Ember and Global Energy Monitor is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"17 operational and national market surfaces","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Composite status depends on several source-specific releases.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Daily operations and source releases. No fixed publisher date is recorded; review is event-driven.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /opportunity-scanner; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: opportunity-model-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"not_ready","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"Daily operations and source releases; no fixed publisher date.","status":"event_driven"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/revenue-shape","title":"Revenue Shape Monitor","pillar":"Australia","cadence":"Daily NEM and SWIS; Ember source releases","coverage":"Five NEM regions, SWIS and 12 global systems","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Daily derived view. NEM and SWIS observation vintages remain visible separately; global transition context follows Ember source editions.","productKey":"revenue-shape-monitor","description":"Observed market spread distributions and merchant-risk concentration.","sourceLabel":"AEMO NEMWeb, AEMO WEM and Ember Electricity Data","currentVersion":"revenue-shape-v1","dataConfidence":"High","expectedNextAt":"2026-08-01T12:20:23.918+00:00","freshnessBasis":"editorial_review","lifecycleClass":"continuous","sourceCheckedAt":"2026-07-31T06:20:23.917+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-21","latestRetrievedAt":"2026-07-31T06:20:23.918+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-21","observationPeriodEnd":"2026-05-31","lastMaterialReleaseAt":"2026-07-21T00:00:00+00:00","latestObservationDate":"2026-05-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO NEMWeb, AEMO WEM and Ember Electricity Data is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Five NEM regions, SWIS and 12 global systems","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Daily derived view. NEM and SWIS observation vintages remain visible separately; global transition context follows Ember source editions.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Daily NEM and SWIS; Ember source releases. Next expected check: 2026-08-01.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /revenue-shape; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: revenue-shape-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-01T12:20:23.918+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/revenue-lab","title":"Revenue Opportunity Lab","pillar":"Australia","cadence":"Daily spread history and quarterly capture updates","coverage":"Five NEM regions and five asset archetypes","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Scenario outputs are not forecasts or financial advice.","productKey":"revenue-opportunity-lab","description":"Asset-level revenue screening with observed evidence separated from assumptions.","sourceLabel":"AEMO TBx indices and observed battery capture","currentVersion":"revenue-lab-v1","dataConfidence":"High","expectedNextAt":"2026-10-31T00:00:00+00:00","freshnessBasis":"observation_period","lifecycleClass":"model","sourceCheckedAt":"2026-07-21T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-21","latestRetrievedAt":"2026-07-21T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-21","observationPeriodEnd":"2026-03-31","lastMaterialReleaseAt":"2026-07-21T00:00:00+00:00","latestObservationDate":"2026-03-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO TBx indices and observed battery capture is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Five NEM regions and five asset archetypes","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Scenario outputs are not forecasts or financial advice.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Daily spread history and quarterly capture updates. Next expected check: 2026-10-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /revenue-lab; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: revenue-lab-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-10-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/value-of-a-kilowatt","title":"Solar resource and yield","pillar":"Global","cadence":"Reviewed with source updates","coverage":"40 benchmark markets, 1994-2024 baseline","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Operational release metadata is pending connection to the climate pipeline.","productKey":"solar-resource","description":"Location-level irradiance and climate-adjusted yield baselines.","sourceLabel":"NASA CERES and MERRA-2","currentVersion":"nasa-resource-baseline-1994-2024","dataConfidence":"High","expectedNextAt":null,"freshnessBasis":"observation_period","lifecycleClass":"model","sourceCheckedAt":"2026-07-10T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-06-18","latestRetrievedAt":"2026-07-10T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-06-18","observationPeriodEnd":"2024-12-31","lastMaterialReleaseAt":"2026-07-10T00:00:00+00:00","latestObservationDate":"2024-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"NASA CERES and MERRA-2 is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"40 benchmark markets, 1994-2024 baseline","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Operational release metadata is pending connection to the climate pipeline.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Reviewed with source updates. No fixed publisher date is recorded; review is event-driven.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /value-of-a-kilowatt; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: nasa-resource-baseline-1994-2024.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"Reviewed with source updates; no fixed publisher date.","status":"event_driven"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/swis","title":"SWIS Observatory","pillar":"SWIS","cadence":"Versioned operating-record release","coverage":"South West Interconnected System, Western Australia","sourceUrl":"https://aemo.com.au/energy-systems/electricity/wholesale-electricity-market-wem","knownLimit":"The shared release heartbeat is pending connection to the SWIS pipeline.","productKey":"swis-observatory","description":"Operating and transition evidence for the South West Interconnected System.","sourceLabel":"AEMO WEM and Western Australian Government","currentVersion":"operations-swis-2026-07-29","dataConfidence":"High","expectedNextAt":"2026-08-01T17:45:41.521+00:00","freshnessBasis":"editorial_review","lifecycleClass":"reference","sourceCheckedAt":"2026-07-31T05:45:41.521+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-31","latestRetrievedAt":"2026-07-31T05:45:41.521+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-29","observationPeriodEnd":"2026-07-29","lastMaterialReleaseAt":"2026-07-31T05:45:41.521+00:00","latestObservationDate":"2026-07-29"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO WEM and Western Australian Government is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"South West Interconnected System, Western Australia","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The shared release heartbeat is pending connection to the SWIS pipeline.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Versioned operating-record release. Next expected check: 2026-08-01.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /swis; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: operations-swis-2026-07-29.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-01T17:45:41.521+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[{"status":"pass","metrics":{"source_key":"swis","retained_rows":5,"pipeline_run_id":"72ba5232-7d9d-457e-b84c-afa8d03fca22"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"swis-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T05:45:43.203+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"72ba5232-7d9d-457e-b84c-afa8d03fca22","observedResult":"swis reported 5 retained rows for 2026-07-29.","receiptVersion":"operations-swis-2026-07-29","observationDate":"2026-07-29"},{"status":"pass","metrics":{"retained_rows":1026,"observation_date":"2026-07-24"},"boundary":"This source-total receipt verifies retained-row presence and date coverage. It does not independently validate every provider value.","checkKey":"retained-source-rows","checkType":"source_total","checkedAt":"2026-07-26T17:32:26.990714+00:00","checkedBy":"Solar Analytica migration verification","pipelineRunId":null,"observedResult":"1026 retained rows through 2026-07-24.","receiptVersion":"operational-bootstrap-2026-07-26","observationDate":"2026-07-24"}]},{"product":{"route":"/swis/demographics","title":"SWIS Grid Demographic Atlas","pillar":"SWIS","cadence":"Annual ABS population and Census releases","coverage":"246 Western Australian SA2s, 2011-2025 population","sourceUrl":"https://www.abs.gov.au/statistics/people/population/regional-population","knownLimit":"The demographic release heartbeat is not yet automated.","productKey":"swis-demographic-atlas","description":"Small-area population, household and housing-form context.","sourceLabel":"Australian Bureau of Statistics","currentVersion":"abs-erp-2025-preliminary","dataConfidence":"High","expectedNextAt":"2027-07-31T00:00:00+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-20T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-20","latestRetrievedAt":"2026-07-20T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-20","observationPeriodEnd":"2025-06-30","lastMaterialReleaseAt":"2026-07-20T00:00:00+00:00","latestObservationDate":"2025-06-30"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Australian Bureau of Statistics is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"246 Western Australian SA2s, 2011-2025 population","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The demographic release heartbeat is not yet automated.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Annual ABS population and Census releases. Next expected check: 2027-07-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /swis/demographics; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: abs-erp-2025-preliminary.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-07-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/swis/der-adoption","title":"SWIS DER Adoption","pillar":"Distributed energy","cadence":"Monthly CER release","coverage":"335 postcodes allocated to 246 WA SA2s","sourceUrl":"https://cer.gov.au/markets/reports-and-data/small-scale-installation-postcode-data","knownLimit":"Recent certificate cohorts can be incomplete while installations move through validation.","productKey":"swis-der","description":"Versioned small-area rooftop-solar and battery adoption evidence.","sourceLabel":"Clean Energy Regulator","currentVersion":"swis-der-cer-2026-05","dataConfidence":"High","expectedNextAt":"2026-08-15T00:00:00+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-15T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-15","latestRetrievedAt":"2026-07-15T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-15","observationPeriodEnd":"2026-05-31","lastMaterialReleaseAt":"2026-07-15T00:00:00+00:00","latestObservationDate":"2026-05-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Clean Energy Regulator is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"335 postcodes allocated to 246 WA SA2s","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Recent certificate cohorts can be incomplete while installations move through validation.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Monthly CER release. Next expected check: 2026-08-15.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /swis/der-adoption; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: swis-der-cer-2026-05.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-15T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/global-residential-electricity-prices","title":"Retail electricity prices","pillar":"Global","cadence":"Annual refresh","coverage":"92 cities, 70 countries, 2016-2025","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Source vintages vary by market and remain visible per row.","productKey":"retail-electricity","description":"Annual household tariffs used in avoided-grid-cost analysis.","sourceLabel":"Named public and market sources per row","currentVersion":"retail-prices-2016-2025","dataConfidence":"Medium","expectedNextAt":"2027-06-30T00:00:00+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-06-09T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-06-09","latestRetrievedAt":"2026-06-09T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-06-09","observationPeriodEnd":"2025-12-31","lastMaterialReleaseAt":"2026-06-09T00:00:00+00:00","latestObservationDate":"2025-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Named public and market sources per row is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"92 cities, 70 countries, 2016-2025","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Source vintages vary by market and remain visible per row.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Annual refresh. Next expected check: 2027-06-30.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /global-residential-electricity-prices; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: retail-prices-2016-2025.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"context_only","comparabilityClass":"C","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-06-30T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/global-residential-electricity-prices","title":"WA regulated residential tariffs","pillar":"SWIS","cadence":"Weekly source check; annual regulated tariff release","coverage":"Synergy A1 in the SWIS and Horizon Power A2 in regional Western Australia","sourceUrl":"https://www.wa.gov.au/organisation/energy-policy-wa/household-electricity-pricing","knownLimit":"The regulated flat tariff is a reference input. Household bills can differ with time-of-use products, concessions, credits and consumption patterns.","productKey":"wa-residential-tariffs","description":"Legislated A1 and A2 residential supply and consumption charges used as tariff context for Western Australian DER screening.","sourceLabel":"Energy Policy WA and WA Legislation","currentVersion":"wa-regulated-residential-2026-07-01","dataConfidence":"High","expectedNextAt":"2026-08-03T08:30:37.477+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-27T08:30:35.468+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-14","latestRetrievedAt":"2026-07-27T08:30:37.477+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-01","observationPeriodEnd":"2026-07-01","lastMaterialReleaseAt":"2026-07-14T00:00:00+00:00","latestObservationDate":"2026-07-01"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Energy Policy WA and WA Legislation is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Synergy A1 in the SWIS and Horizon Power A2 in regional Western Australia","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The regulated flat tariff is a reference input. Household bills can differ with time-of-use products, concessions, credits and consumption patterns.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Weekly source check; annual regulated tariff release. Next expected check: 2026-08-03.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /global-residential-electricity-prices; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: wa-regulated-residential-2026-07-01.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-03T08:30:37.477+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/value-under-constraint","title":"Value Under Constraint","pillar":"Solar economics","cadence":"Monthly tariff and export-rule edition; annual NASA solar-shape refresh","coverage":"First release: Perth and the Western Power SWIS residential reference case","sourceUrl":"https://solaranalytica.com/value-under-constraint","knownLimit":"Representative load shapes and editable financial parameters are assumptions. Connection-specific limits and measured interval data are not inferred.","productKey":"temporal-value","description":"Interval-based distributed-energy value under tariff timing, site load and export constraints.","sourceLabel":"WA Legislation, Synergy, Western Power and NASA POWER","currentVersion":"value-under-constraint-wa-2026-07","dataConfidence":"Medium","expectedNextAt":"2026-08-31T23:59:59+00:00","freshnessBasis":"source_release","lifecycleClass":"model","sourceCheckedAt":"2026-07-27T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-27","latestRetrievedAt":"2026-07-27T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-01","observationPeriodEnd":"2026-07-01","lastMaterialReleaseAt":"2026-07-27T00:00:00+00:00","latestObservationDate":"2026-07-01"},"quality":{"dimensions":[{"key":"institutional_environment","note":"WA Legislation, Synergy, Western Power and NASA POWER is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"First release: Perth and the Western Power SWIS residential reference case","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Representative load shapes and editable financial parameters are assumptions. Connection-specific limits and measured interval data are not inferred.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Monthly tariff and export-rule edition; annual NASA solar-shape refresh. Next expected check: 2026-08-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /value-under-constraint; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: value-under-constraint-wa-2026-07.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"context_only","comparabilityClass":"C","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-31T23:59:59+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/solar-production-climate","title":"Production climate","pillar":"Global","cadence":"Versioned with each report","coverage":"40 markets, 20+ years of record","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Several climate pillars are versioned snapshots rather than live feeds.","productKey":"production-climate","description":"Heat, rainfall, smoke, wind, storms and atmospheric variability read against PV output.","sourceLabel":"NASA, NOAA and measured-event records","currentVersion":"production-climate-2026","dataConfidence":"High","expectedNextAt":"2027-06-30T00:00:00+00:00","freshnessBasis":"editorial_review","lifecycleClass":"edition","sourceCheckedAt":"2026-06-25T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-06-25","latestRetrievedAt":"2026-06-25T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-06-25","observationPeriodEnd":"2024-12-31","lastMaterialReleaseAt":"2026-06-25T00:00:00+00:00","latestObservationDate":"2024-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"NASA, NOAA and measured-event records is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"40 markets, 20+ years of record","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Several climate pillars are versioned snapshots rather than live feeds.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Versioned with each report. Next expected check: 2027-06-30.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /solar-production-climate; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: production-climate-2026.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-06-30T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/grid-mix","title":"Grid Mix Monitor","pillar":"Grid systems","cadence":"Annual publisher release","coverage":"Ten national systems; 2016 onward","sourceUrl":"https://ember-energy.org/data/","knownLimit":"The latest durable database edition is 2024; the 2025 monitor is a labelled fixed publication snapshot.","productKey":"grid-mix","description":"Annual electricity generation mix and carbon-intensity evidence.","sourceLabel":"Ember Electricity Data","currentVersion":"ember-annual-2025","dataConfidence":"High","expectedNextAt":"2026-08-01T06:10:16.101+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-31T06:10:16.101+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-23","latestRetrievedAt":"2026-07-31T06:10:16.101+00:00","operationalStatus":"current","sourceReleaseDate":null,"observationPeriodEnd":"2025-12-31","lastMaterialReleaseAt":"2026-07-23T06:10:24.998+00:00","latestObservationDate":"2025-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Ember Electricity Data is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Ten national systems; 2016 onward","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The latest durable database edition is 2024; the 2025 monitor is a labelled fixed publication snapshot.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Annual publisher release. Next expected check: 2026-08-01.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /grid-mix; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: ember-annual-2025.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-01T06:10:16.101+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[{"status":"pass","metrics":{"source_key":"grid-mix","retained_rows":10,"pipeline_run_id":"7fca63f5-2d6a-4ce5-bfa4-3d598fbb008d"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"grid-mix-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T06:10:17.483+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"7fca63f5-2d6a-4ce5-bfa4-3d598fbb008d","observedResult":"grid-mix reported 10 retained rows for 2025-12-31.","receiptVersion":"ember-annual-2025","observationDate":"2025-12-31"}]},{"product":{"route":"/demographics","title":"Demographic Context Monitor","pillar":"Global","cadence":"Annual source refresh","coverage":"Ten national systems, 2005-2024","sourceUrl":"https://data.worldbank.org/","knownLimit":"Source releases occur on different annual schedules.","productKey":"demographic-context","description":"Population, urbanisation, electricity access and age structure joined to electricity generation.","sourceLabel":"World Bank WDI and public statistical releases","currentVersion":"demographics-2005-2024","dataConfidence":"High","expectedNextAt":"2027-07-31T00:00:00+00:00","freshnessBasis":"source_release","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-12T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-12","latestRetrievedAt":"2026-07-12T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-12","observationPeriodEnd":"2024-12-31","lastMaterialReleaseAt":"2026-07-12T00:00:00+00:00","latestObservationDate":"2024-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"World Bank WDI and public statistical releases is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Ten national systems, 2005-2024","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Source releases occur on different annual schedules.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Annual source refresh. Next expected check: 2027-07-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /demographics; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: demographics-2005-2024.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-07-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/capacity-pipeline","title":"Solar Capacity Pipeline","pillar":"Project pipeline","cadence":"Weekly source check","coverage":"Ten national systems","sourceUrl":"https://globalenergymonitor.org/projects/global-solar-power-tracker/","knownLimit":"Prospective projects are not forecasts and do not imply delivery.","productKey":"solar-capacity-pipeline","description":"Versioned operating and prospective utility-scale solar capacity records.","sourceLabel":"Global Energy Monitor","currentVersion":"pipeline-check-2026-07-20","dataConfidence":"High","expectedNextAt":"2026-08-03T06:15:35.207+00:00","freshnessBasis":"source_check","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-27T06:15:35.207+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-21","latestRetrievedAt":"2026-07-27T06:15:35.207+00:00","operationalStatus":"recovering","sourceReleaseDate":"2026-07-21","observationPeriodEnd":"2026-07-20","lastMaterialReleaseAt":"2026-07-21T00:00:00+00:00","latestObservationDate":"2026-07-20"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Global Energy Monitor is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Ten national systems","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Prospective projects are not forecasts and do not imply delivery.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Weekly source check. Next expected check: 2026-08-03.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /capacity-pipeline; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: pipeline-check-2026-07-20.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"not_ready","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-03T06:15:35.207+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[{"status":"warning","metrics":{"source_key":"capacity","retained_rows":null,"pipeline_run_id":"d1d06a0f-e15f-4ce4-8976-d9e6e5586066"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"capacity-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-27T06:15:37.263+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"d1d06a0f-e15f-4ce4-8976-d9e6e5586066","observedResult":"capacity completed without a machine-readable retained-row count.","receiptVersion":"February 2026","observationDate":"2026-07-27"}]},{"product":{"route":"/grid-operations","title":"Grid Operations Monitor","pillar":"Australia","cadence":"Daily","coverage":"Five NEM regions, SWIS, Great Britain, selected US balancing authorities and European bidding zones","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"A partial regional ingest is reported as a failed daily release.","productKey":"grid-operations","description":"Daily demand, price, ramp and generation-mix ledgers retained from primary operator feeds.","sourceLabel":"AEMO, Elexon BMRS, EIA and ENTSO-E","currentVersion":"operations-eu-2026-07-30","dataConfidence":"High","expectedNextAt":"2026-08-01T18:05:47.876+00:00","freshnessBasis":"source_check","lifecycleClass":"continuous","sourceCheckedAt":"2026-07-31T06:05:47.876+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-31","latestRetrievedAt":"2026-07-31T06:05:47.876+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-30","observationPeriodEnd":"2026-07-30","lastMaterialReleaseAt":"2026-07-31T06:05:47.876+00:00","latestObservationDate":"2026-07-30"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO, Elexon BMRS, EIA and ENTSO-E is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Five NEM regions, SWIS, Great Britain, selected US balancing authorities and European bidding zones","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"A partial regional ingest is reported as a failed daily release.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Daily. Next expected check: 2026-08-01.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /grid-operations; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: operations-eu-2026-07-30.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-01T18:05:47.876+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[{"status":"pass","metrics":{"source_key":"eu","retained_rows":3,"pipeline_run_id":"12926ab2-7334-4579-9640-f8fb6d2a75ce"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"eu-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T06:05:50.104+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"12926ab2-7334-4579-9640-f8fb6d2a75ce","observedResult":"eu reported 3 retained rows for 2026-07-30.","receiptVersion":"operations-eu-2026-07-30","observationDate":"2026-07-30"},{"status":"pass","metrics":{"source_key":"us","retained_rows":8,"pipeline_run_id":"785042bb-ec3e-41e2-a535-41038fed9d5c"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"us-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T06:01:17.03+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"785042bb-ec3e-41e2-a535-41038fed9d5c","observedResult":"us reported 8 retained rows for 2026-07-29.","receiptVersion":"operations-us-2026-07-29","observationDate":"2026-07-29"},{"status":"pass","metrics":{"source_key":"gb","retained_rows":21,"pipeline_run_id":"5cc89601-2ce8-4ef7-aca0-e47fd7133b30"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"gb-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T05:55:17.006+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"5cc89601-2ce8-4ef7-aca0-e47fd7133b30","observedResult":"gb reported 21 retained rows for 2026-07-30.","receiptVersion":"operations-gb-2026-07-30","observationDate":"2026-07-30"},{"status":"pass","metrics":{"source_key":"nem","retained_rows":5,"pipeline_run_id":"3e051542-14ca-4b93-8c4f-b46fd53423fd"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"nem-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T05:50:52.827+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"3e051542-14ca-4b93-8c4f-b46fd53423fd","observedResult":"nem reported 5 retained rows for 2026-07-30.","receiptVersion":"operations-nem-2026-07-30","observationDate":"2026-07-30"},{"status":"pass","metrics":{"source_key":"swis","retained_rows":5,"pipeline_run_id":"72ba5232-7d9d-457e-b84c-afa8d03fca22"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"swis-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T05:45:43.198+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"72ba5232-7d9d-457e-b84c-afa8d03fca22","observedResult":"swis reported 5 retained rows for 2026-07-29.","receiptVersion":"operations-swis-2026-07-29","observationDate":"2026-07-29"},{"status":"pass","metrics":{"retained_rows":7506,"observation_date":"2026-07-25"},"boundary":"This source-total receipt verifies retained-row presence and date coverage. It does not independently validate every provider value.","checkKey":"retained-source-rows","checkType":"source_total","checkedAt":"2026-07-26T17:32:26.990714+00:00","checkedBy":"Solar Analytica migration verification","pipelineRunId":null,"observedResult":"7506 retained rows through 2026-07-25.","receiptVersion":"operational-bootstrap-2026-07-26","observationDate":"2026-07-25"}]},{"product":{"route":"/signals","title":"Grid Event Ledger","pillar":"Global","cadence":"Daily detection","coverage":"SWIS, NEM, Great Britain and pipeline markets","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Events are deterministic threshold records, not editorial predictions.","productKey":"grid-event-ledger","description":"Deterministic records of material grid and market events.","sourceLabel":"AEMO, Elexon BMRS and Global Energy Monitor","currentVersion":"operations-events-2026-07-30","dataConfidence":"High","expectedNextAt":"2026-08-01T18:25:35.926+00:00","freshnessBasis":"source_check","lifecycleClass":"continuous","sourceCheckedAt":"2026-07-31T06:25:35.926+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-31","latestRetrievedAt":"2026-07-31T06:25:35.926+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-30","observationPeriodEnd":"2026-07-30","lastMaterialReleaseAt":"2026-07-31T06:25:35.926+00:00","latestObservationDate":"2026-07-30"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO, Elexon BMRS and Global Energy Monitor is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"SWIS, NEM, Great Britain and pipeline markets","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Events are deterministic threshold records, not editorial predictions.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Daily detection. Next expected check: 2026-08-01.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /signals; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: operations-events-2026-07-30.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-01T18:25:35.926+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[{"status":"pass","metrics":{"source_key":"events","retained_rows":0,"pipeline_run_id":"9ba3fd25-443a-446d-8b18-bc7bb86f3957"},"boundary":"This receipt verifies the provider pipeline and retained-row contract. It does not independently reproduce every provider value.","checkKey":"events-pipeline-persistence","checkType":"schema","checkedAt":"2026-07-31T06:25:37.534+00:00","checkedBy":"Solar Analytica operations orchestrator","pipelineRunId":"9ba3fd25-443a-446d-8b18-bc7bb86f3957","observedResult":"events reported 0 retained rows for 2026-07-30.","receiptVersion":"operations-events-2026-07-30","observationDate":"2026-07-30"},{"status":"pass","metrics":{"retained_rows":514,"observation_date":"2026-07-25"},"boundary":"This source-total receipt verifies retained-row presence and date coverage. It does not independently validate every provider value.","checkKey":"retained-source-rows","checkType":"source_total","checkedAt":"2026-07-26T17:32:26.990714+00:00","checkedBy":"Solar Analytica migration verification","pipelineRunId":null,"observedResult":"514 retained rows through 2026-07-25.","receiptVersion":"operational-bootstrap-2026-07-26","observationDate":"2026-07-25"}]},{"product":{"route":"/certifications","title":"Approved Product Monitor","pillar":"Product evidence","cadence":"Weekly source checks; monthly review","coverage":"AU modules, inverters and batteries; California modules","sourceUrl":"https://cer.gov.au/markets/reports-and-data/small-scale-installation-postcode-data","knownLimit":"Listing proves inclusion in the source file, not quality, durability, warranty support or project suitability.","productKey":"approved-products","description":"Current Australian and California source-list versions with exact-model evidence.","sourceLabel":"Clean Energy Regulator and California Energy Commission","currentVersion":"certifications-2026-07-27","dataConfidence":"High","expectedNextAt":"2026-08-03T08:16:50.191+00:00","freshnessBasis":"source_check","lifecycleClass":"periodic","sourceCheckedAt":"2026-07-27T08:16:50.191+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-27","latestRetrievedAt":"2026-07-27T08:16:50.191+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-27","observationPeriodEnd":"2026-07-27","lastMaterialReleaseAt":"2026-07-27T08:16:50.191+00:00","latestObservationDate":"2026-07-27"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Clean Energy Regulator and California Energy Commission is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"AU modules, inverters and batteries; California modules","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Listing proves inclusion in the source file, not quality, durability, warranty support or project suitability.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Weekly source checks; monthly review. Next expected check: 2026-08-03.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /certifications; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: certifications-2026-07-27.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-08-03T08:16:50.191+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/market-structures","title":"Market structures","pillar":"Australia","cadence":"Quarterly","coverage":"NEM battery fleet, starting Q1 2026","sourceUrl":"https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem","knownLimit":"The first release is a bounded research edition.","productKey":"market-structures","description":"Quarterly measures of energy-asset capture against transparent market references.","sourceLabel":"AEMO primary market and dispatch data","currentVersion":"nem-tbx-2026q1","dataConfidence":"High","expectedNextAt":"2026-10-31T00:00:00+00:00","freshnessBasis":"editorial_review","lifecycleClass":"edition","sourceCheckedAt":"2026-07-22T00:30:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-07-22","latestRetrievedAt":"2026-07-22T00:30:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-07-22","observationPeriodEnd":"2026-03-31","lastMaterialReleaseAt":"2026-07-22T00:30:00+00:00","latestObservationDate":"2026-03-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"AEMO primary market and dispatch data is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"NEM battery fleet, starting Q1 2026","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"The first release is a bounded research edition.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Quarterly. Next expected check: 2026-10-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /market-structures; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: nem-tbx-2026q1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"usable_with_limits","comparabilityClass":"B","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2026-10-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/lithium-ion-residential-battery-decade","title":"Storage technology and safety","pillar":"Global","cadence":"Reviewed with standards and market changes","coverage":"Residential storage, 2010-2025","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Standards and product evidence update on different schedules.","productKey":"storage-technology","description":"Residential battery chemistry, certification and control-system evolution.","sourceLabel":"Standards bodies, manufacturers and market records","currentVersion":"residential-storage-2010-2025-v1","dataConfidence":"Medium","expectedNextAt":"2027-03-31T00:00:00+00:00","freshnessBasis":"editorial_review","lifecycleClass":"edition","sourceCheckedAt":"2026-03-26T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-03-26","latestRetrievedAt":"2026-03-26T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-03-26","observationPeriodEnd":"2025-12-31","lastMaterialReleaseAt":"2026-03-26T00:00:00+00:00","latestObservationDate":"2025-12-31"},"quality":{"dimensions":[{"key":"institutional_environment","note":"Standards bodies, manufacturers and market records is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"Residential storage, 2010-2025","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Standards and product evidence update on different schedules.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Reviewed with standards and market changes. Next expected check: 2027-03-31.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /lithium-ion-residential-battery-decade; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: residential-storage-2010-2025-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"context_only","comparabilityClass":"C","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-03-31T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]},{"product":{"route":"/solar-storm-survival","title":"Asset climate risk","pillar":"Global","cadence":"Versioned with each data release","coverage":"40 benchmark markets and measured events","sourceUrl":"https://solaranalytica.com/methodology","knownLimit":"Event evidence and climate baselines have different vintages.","productKey":"asset-risk","description":"Climate-led loss and resilience factors affecting output and specification.","sourceLabel":"NASA, NOAA, peer-reviewed and grid records","currentVersion":"asset-risk-2026-v1","dataConfidence":"Medium","expectedNextAt":"2027-06-30T00:00:00+00:00","freshnessBasis":"editorial_review","lifecycleClass":"edition","sourceCheckedAt":"2026-06-04T00:00:00+00:00","parentProductKey":null,"latestReleaseDate":"2026-06-04","latestRetrievedAt":"2026-06-04T00:00:00+00:00","operationalStatus":"current","sourceReleaseDate":"2026-06-04","observationPeriodEnd":"2026-06-04","lastMaterialReleaseAt":"2026-06-04T00:00:00+00:00","latestObservationDate":"2026-06-04"},"quality":{"dimensions":[{"key":"institutional_environment","note":"NASA, NOAA, peer-reviewed and grid records is named as source; Solar Analytica owns the published transformation and limits.","label":"Institutional environment","state":"documented"},{"key":"relevance","note":"40 benchmark markets and measured events","label":"Relevance","state":"documented"},{"key":"accuracy_reliability","note":"Event evidence and climate baselines have different vintages.","label":"Accuracy and reliability","state":"documented"},{"key":"timeliness","note":"Versioned with each data release. Next expected check: 2027-06-30.","label":"Timeliness","state":"documented"},{"key":"accessibility","note":"Public landing page at /solar-storm-survival; JSON trust metadata and catalogue metadata are open.","label":"Accessibility","state":"documented"},{"key":"interpretability","note":"Source, version, observation period, retrieval time, confidence and limitations are retained as separate fields.","label":"Interpretability","state":"documented"},{"key":"coherence","note":"Current edition: asset-risk-2026-v1.","label":"Coherence","state":"documented"}],"fitnessForUse":"Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.","overallStatus":"context_only","comparabilityClass":"C","declarationVersion":"quality-contract-v1"},"nextCheck":{"value":"2027-06-30T00:00:00+00:00","status":"scheduled"},"verification":{"status":"pass","boundary":"This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.","checkKey":"publication-contract-completeness","checkType":"contract","checkedBy":"Solar Analytica automated contract check","observedResult":"All mandatory publication-contract fields are present.","receiptVersion":"trust-register-v1"},"releaseReceipts":[]}],"summary":{"declared":25,"products":25,"openCorrections":0,"scheduledChecks":22,"eventDrivenChecks":3,"releaseReceiptsFailed":0,"releaseReceiptsPassed":11,"contractReceiptsPassed":24,"releaseReceiptsWarning":1,"contractReceiptsWarning":1},"corrections":[],"generatedAt":"2026-08-01T02:00:32.719Z","editionMonth":"2026-08-01","editionVersion":"trust-2026-08","externalReview":{"status":"open_for_review","boundary":"No reviewer identity or endorsement is claimed before a completed review record includes conflict disclosure, findings, date and evidence.","resourceKey":"australian-solar-storage-evidence-register-2026","reviewRound":"round-1","completedReviews":0},"registerVersion":"trust-register-v1","interoperability":{"catalogue":"DCAT 3","provenance":"PROV-O","doiBoundary":"DOIs are not registered until a recognised repository or DataCite member completes registration.","citationMetadata":"DataCite Metadata Schema 4.7"},"qualityFramework":{"name":"Solar Analytica seven-dimension declaration","alignedTo":"Australian Bureau of Statistics quality dimensions","dimensions":["Institutional environment","Relevance","Accuracy and reliability","Timeliness","Accessibility","Interpretability","Coherence"]}},"contentHash":"5ad1444872214ac783ebd39b2683aae3784d919a9a8406809eb2ca48609624ef","live":true}