{"schemaVersion":"export-flexibility-dividend-public-v1","methodVersion":"export-flexibility-dividend-wa-v1","generatedAt":"2026-08-02T01:28:19.987Z","geography":{"countryCode":"AU","jurisdictionCode":"AU-WA","jurisdictionName":"Western Australia","marketCode":"AU-WEM","modelLocationSlug":"perth-wa-au","financialScope":"Western Australia only"},"currency":"AUD","selectedRegime":{"regimeKey":"au-wa-western-power-basic-eg-large-network-single-phase","networkCode":"WESTERN-POWER","networkName":"Western Power","jurisdictionCode":"AU-WA","jurisdictionName":"Western Australia","marketCode":"AU-WEM","connectionClass":"Single-phase basic embedded generation on the large network","regimeType":"fixed","status":"active","availability":"Published technical requirement; the applicable connection and retailer off-take agreement determine the permitted setting.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":null,"maximumExportKw":5,"staticFallbackKw":1.5,"limitBasis":"site","emergencyOverride":true,"communicationsStandard":"AS/NZS 4777 export limit control","equipmentRequirement":"Compliant export control where the approved export is below inverter capacity.","eligibility":"Large-network basic embedded generation; without a retailer off-take agreement the setting is no more than 1.5 kW.","decisionNote":"This narrow row must not be generalized to small networks, shared connections, three-phase sites or systems above the basic EG class.","sourceKey":"western-power-basic-eg-2026","sourceLabel":"Western Power Basic EG Connection Technical Requirements","sourceVersion":"2026 edition; source checked 2026-08-01","sourceLocator":"Section 4.3.1 and Table 4.1","dataSource":"Western Power","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievedAt":"2026-08-01T00:00:00.000Z"},"sourceReceipt":{"sourceKey":"western-power-basic-eg-2026","sourceLabel":"Western Power Basic EG Connection Technical Requirements","sourceVersion":"2026 edition; source checked 2026-08-01","sourceLocator":"Section 4.3.1 and Table 4.1","dataSource":"Western Power","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievedAt":"2026-08-01T00:00:00.000Z"},"assumptions":{"regimeKey":"au-wa-western-power-basic-eg-large-network-single-phase","systemSizeKw":6.6,"annualConsumptionKwh":6000,"installedCostAud":8000,"loadProfileKey":"evening","tariffKey":"synergy-a1-debs-2026","storageUsableKwh":0,"storageCostAud":0,"discountRatePct":5,"degradationPct":0.4,"analysisYears":25},"boundaries":["Financial outputs are available only for the exact Western Power single-phase basic embedded-generation class named by this edition.","The 1.5 kW fallback and 5 kW ceiling are published site limits. The ceiling is not a connection offer or a guarantee of interval availability.","The unconstrained scenario is a counterfactual only. It is not a network entitlement.","All financial scenarios use the temporal-value-wa-v1 Perth solar shape and selected WA tariff edition on an otherwise identical basis.","The flexibility dividend is a before-cost value difference. It is not a recommended equipment price, service fee or VPP revenue claim.","Storage follows the temporal-value engine's self-consumption dispatch. No replacement capital, wholesale dispatch or connection-specific dynamic envelope is modelled.","A source change creates review work. It does not silently replace the exact regime edition used by a published result."],"provenance":{"method":{"schemaVersion":"export-flexibility-dividend-public-v1","methodVersion":"export-flexibility-dividend-wa-v1","dispatchMethodVersion":"temporal-value-wa-v1","comparisonBasis":"Identical normalized assumptions and source editions; only the export envelope changes between flexibility scenarios."},"regime":{"sourceKey":"western-power-basic-eg-2026","sourceLabel":"Western Power Basic EG Connection Technical Requirements","sourceVersion":"2026 edition; source checked 2026-08-01","sourceLocator":"Section 4.3.1 and Table 4.1","dataSource":"Western Power","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievedAt":"2026-08-01T00:00:00.000Z"},"tariff":{"dataSource":"Synergy","tariffKey":"synergy-a1-debs-2026","dataVersion":"wa-a1-debs-2026-07-01","effectiveFrom":"2026-07-01","verifiedOn":"2026-07-28","reviewDueFrom":"2027-07-01","evidenceUrls":["https://www.synergy.net.au/Your-home/Energy-plans","https://www.synergy.net.au/-/media/Files/PDF-Library/Standard_Electricity_Prices_Charges_brochure.pdf"]},"solarShape":{"location":{"slug":"perth-wa-au","name":"Perth, Western Australia","latitude":-31.9523,"longitude":115.8613},"publisher":"NASA POWER","parameter":"ALLSKY_SFC_SW_DWN","evidenceUrl":"https://power.larc.nasa.gov/api/temporal/hourly/point?parameters=ALLSKY_SFC_SW_DWN&community=RE&longitude=115.8613&latitude=-31.9523&start=20210101&end=20251231&format=JSON&time-standard=LST","period":{"start":"2021-01-01","end":"2025-12-31","timeStandard":"LST"},"dataVersion":"nasa-power-perth-hourly-shape-2021-2025-v1","dataConfidence":"Medium","generatedAt":"2026-07-27T14:00:39.466Z"}},"availability":{"state":"available","reasonCode":null,"reason":null},"scenarios":[{"scenarioKey":"fallback","label":"Published 1.5 kW fallback","evidenceClass":"Source","exportLimitKw":1.5,"availability":{"state":"available","reasonCode":null,"reason":null},"availabilityState":"available","unavailableReason":null,"comparisonBasisKey":"{\"methodVersion\":\"temporal-value-wa-v1\",\"jurisdictionCode\":\"AU-WA\",\"regimeKey\":\"au-wa-western-power-basic-eg-large-network-single-phase\",\"connectionClass\":\"Single-phase basic embedded generation on the large network\",\"limitBasis\":\"site\",\"systemSizeKw\":6.6,\"annualConsumptionKwh\":6000,\"loadProfileKey\":\"evening\",\"tariffKey\":\"synergy-a1-debs-2026\",\"tariffDataVersion\":\"wa-a1-debs-2026-07-01\",\"storageUsableKwh\":0,\"storageCostAud\":0,\"degradationPct\":0.4,\"discountRatePct\":5,\"analysisYears\":25,\"solarShapeDataVersion\":\"nasa-power-perth-hourly-shape-2021-2025-v1\"}","firstYearValueAud":962.1,"presentValueAud":13439.66,"exportedKwh":4572.46,"curtailedKwh":4830.574,"firstYear":{"annualGenerationKwh":11822.58,"annualConsumptionKwh":6000,"selfConsumedKwh":2419.546,"exportedKwh":4572.46,"curtailedKwh":4830.574,"storageChargedKwh":0,"storageDischargedKwh":0,"storageLossKwh":0,"avoidedImportValueAud":804.79,"storageValueAud":0,"exportValueAud":157.31,"annualValueAud":962.1},"lifetime":{"presentValueAud":13439.66,"totalCapitalAud":8000,"netPresentValueAud":5439.66,"discountedPaybackYear":12}},{"scenarioKey":"published-ceiling","label":"Published 5 kW ceiling","evidenceClass":"Source","exportLimitKw":5,"availability":{"state":"available","reasonCode":null,"reason":null},"availabilityState":"available","unavailableReason":null,"comparisonBasisKey":"{\"methodVersion\":\"temporal-value-wa-v1\",\"jurisdictionCode\":\"AU-WA\",\"regimeKey\":\"au-wa-western-power-basic-eg-large-network-single-phase\",\"connectionClass\":\"Single-phase basic embedded generation on the large network\",\"limitBasis\":\"site\",\"systemSizeKw\":6.6,\"annualConsumptionKwh\":6000,\"loadProfileKey\":\"evening\",\"tariffKey\":\"synergy-a1-debs-2026\",\"tariffDataVersion\":\"wa-a1-debs-2026-07-01\",\"storageUsableKwh\":0,\"storageCostAud\":0,\"degradationPct\":0.4,\"discountRatePct\":5,\"analysisYears\":25,\"solarShapeDataVersion\":\"nasa-power-perth-hourly-shape-2021-2025-v1\"}","firstYearValueAud":1089.13,"presentValueAud":15091.77,"exportedKwh":9304.946,"curtailedKwh":98.088,"firstYear":{"annualGenerationKwh":11822.58,"annualConsumptionKwh":6000,"selfConsumedKwh":2419.546,"exportedKwh":9304.946,"curtailedKwh":98.088,"storageChargedKwh":0,"storageDischargedKwh":0,"storageLossKwh":0,"avoidedImportValueAud":804.79,"storageValueAud":0,"exportValueAud":284.34,"annualValueAud":1089.13},"lifetime":{"presentValueAud":15091.77,"totalCapitalAud":8000,"netPresentValueAud":7091.77,"discountedPaybackYear":10}},{"scenarioKey":"unconstrained-counterfactual","label":"Unconstrained counterfactual","evidenceClass":"Counterfactual","exportLimitKw":null,"availability":{"state":"available","reasonCode":null,"reason":null},"availabilityState":"available","unavailableReason":null,"comparisonBasisKey":"{\"methodVersion\":\"temporal-value-wa-v1\",\"jurisdictionCode\":\"AU-WA\",\"regimeKey\":\"au-wa-western-power-basic-eg-large-network-single-phase\",\"connectionClass\":\"Single-phase basic embedded generation on the large network\",\"limitBasis\":\"site\",\"systemSizeKw\":6.6,\"annualConsumptionKwh\":6000,\"loadProfileKey\":\"evening\",\"tariffKey\":\"synergy-a1-debs-2026\",\"tariffDataVersion\":\"wa-a1-debs-2026-07-01\",\"storageUsableKwh\":0,\"storageCostAud\":0,\"degradationPct\":0.4,\"discountRatePct\":5,\"analysisYears\":25,\"solarShapeDataVersion\":\"nasa-power-perth-hourly-shape-2021-2025-v1\"}","firstYearValueAud":1091.1,"presentValueAud":15105.47,"exportedKwh":9403.034,"curtailedKwh":0,"firstYear":{"annualGenerationKwh":11822.58,"annualConsumptionKwh":6000,"selfConsumedKwh":2419.546,"exportedKwh":9403.034,"curtailedKwh":0,"storageChargedKwh":0,"storageDischargedKwh":0,"storageLossKwh":0,"avoidedImportValueAud":804.79,"storageValueAud":0,"exportValueAud":286.3,"annualValueAud":1091.1},"lifetime":{"presentValueAud":15105.47,"totalCapitalAud":8000,"netPresentValueAud":7105.47,"discountedPaybackYear":10}}],"comparison":{"availability":{"state":"available","reasonCode":null,"reason":null},"fromScenario":"fallback","toScenario":"published-ceiling","sameBasis":true,"annualFlexibilityDividendAud":127.03,"presentValueFlexibilityHeadroomAud":1652.11,"recoveredExportKwh":4732.486,"avoidedCurtailmentKwh":4732.486},"annualFlexibilityDividendAud":127.03,"presentValueFlexibilityHeadroomAud":1652.11,"recoveredExportKwh":4732.486,"avoidedCurtailmentKwh":4732.486,"unconstrainedHeadroom":{"availability":{"state":"available","reasonCode":null,"reason":null},"fromScenario":"published-ceiling","toScenario":"unconstrained-counterfactual","sameBasis":true,"annualFlexibilityDividendAud":1.97,"presentValueFlexibilityHeadroomAud":13.7,"recoveredExportKwh":98.088,"avoidedCurtailmentKwh":98.088},"storageRescueAtFallback":{"availability":{"state":"available","reasonCode":null,"reason":null},"exportLimitKw":1.5,"storageUsableKwh":0,"storageChargedKwh":0,"storageDischargedKwh":0,"avoidedCurtailmentKwh":0,"annualValueDeltaAud":0,"annualValueAud":0,"presentValueDeltaAud":0,"incrementalStorageCostAud":0,"netPresentValueDeltaAud":0,"recoveredKwh":0}}