{"schemaVersion":1,"version":"ssen-headroom-march-2026-20261024-v1","editionDate":"2026-10-24","observationPeriod":null,"source":{"publisher":"Scottish and Southern Electricity Networks (SSEN)","datasetUrl":"https://data-api.ssen.co.uk/dataset/generation-availability-and-network-capacity","resourceId":"52e9a305-ad90-4c81-9175-20a40ef57894","editionLabel":"March 2026","resourceModifiedAt":"2026-03-11T12:12:32.113749","capturedAt":"2026-10-24T03:30:20.663Z","originalPublicationDate":null,"recordRevisionDates":null,"rawSha256":"75f04c20a9d8fc24eec7b7eb1f89f2534bd7dcb55964a10fd0f6fb488799a2dd","fields":["_id","AssetID","map___license_area","Substation","Upstream GSP","Upstream BSP","Substation Type","voltage__kv_","Transformer Nameplate Ratings","Single Transformer Site","maximum_observed_gross_demand__mva_","minimum_observed_gross_demand__mva_","contracted_demand_excl_bess__mva_","contracted_bess_demand__mva_","estimated_demand_headroom__mva_","Substation Demand RAG Status","Demand Constraint","TIA Threshold","connected_generation__mw_","contracted_generation__mw_","Technical Limits Agreed at GSP","estimated_generation_headroom__mw_","unsafe_3_phase_break_fault_rating__ka_","unsafe_3_phase_break_fault_level__ka_","Substation Generation RAG Status","Generation Constraint","Upstream Reinforcement Completion Date","Substation Reinforcement Completion Date"],"licence":"CC BY 4.0","licenceUrl":"https://creativecommons.org/licenses/by/4.0/","attribution":"Source: Scottish and Southern Electricity Networks (SSEN), Generation Availability and Network Capacity, Headroom Dashboard Data - March 2026. CC BY 4.0.","modifications":"Solar Analytica selected 28 infrastructure fields, retained decimal values as strings and labelled missing headroom. No SSEN endorsement implied.","collectorScheduled":false,"declaredMapCadence":"Monthly; this does not establish monthly updates of the March download or observation intervals."},"coverage":{"total":998,"byLevel":{"GSP":99,"BSP":80,"Primary":819},"byArea":{"England / SEPD":545,"Scotland / SHEPD":453},"directions":{"demand":{"positive":502,"zero":397,"unknown":99},"generation":{"positive":113,"zero":786,"unknown":99}},"differentFlags":570},"records":[{"id":"E - AMEM - 01","name":"Amersham GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"1","AssetID":"E - AMEM - 01","map___license_area":"England / SEPD","Substation":"Amersham GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 X 240MVA (Shared with UKPN)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"52.49","minimum_observed_gross_demand__mva_":"14.20","contracted_demand_excl_bess__mva_":"15.51","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"41.33","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"9.06","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":null}},{"id":"E - AMEM - 02","name":"Loudwater BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Amersham GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"2","AssetID":"E - AMEM - 02","map___license_area":"England / SEPD","Substation":"Loudwater BSP","Upstream GSP":"Amersham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"49.87","minimum_observed_gross_demand__mva_":"13.87","contracted_demand_excl_bess__mva_":"15.51","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"40.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"12.06","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AMEM - 03","name":"Bowerdean Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Amersham GSP","upstreamBsp":"Loudwater BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"3","AssetID":"E - AMEM - 03","map___license_area":"England / SEPD","Substation":"Bowerdean Primary","Upstream GSP":"Amersham GSP","Upstream BSP":"Loudwater BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.20","minimum_observed_gross_demand__mva_":"3.38","contracted_demand_excl_bess__mva_":"5.39","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AMEM - 04","name":"Flackwell Heath Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Amersham GSP","upstreamBsp":"Loudwater BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"4","AssetID":"E - AMEM - 04","map___license_area":"England / SEPD","Substation":"Flackwell Heath Primary","Upstream GSP":"Amersham GSP","Upstream BSP":"Loudwater BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.96","minimum_observed_gross_demand__mva_":"1.58","contracted_demand_excl_bess__mva_":"3.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.63","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AMEM - 05","name":"Well End Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Amersham GSP","upstreamBsp":"Loudwater BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"5","AssetID":"E - AMEM - 05","map___license_area":"England / SEPD","Substation":"Well End Primary","Upstream GSP":"Amersham GSP","Upstream BSP":"Loudwater BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.90","minimum_observed_gross_demand__mva_":"3.62","contracted_demand_excl_bess__mva_":"2.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AMEM - 06","name":"Wycombe Marsh Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Amersham GSP","upstreamBsp":"Loudwater BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"6","AssetID":"E - AMEM - 06","map___license_area":"England / SEPD","Substation":"Wycombe Marsh Primary","Upstream GSP":"Amersham GSP","Upstream BSP":"Loudwater BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.53","minimum_observed_gross_demand__mva_":"1.69","contracted_demand_excl_bess__mva_":"4.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 01","name":"Axminster GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"143.61","technicalLimits":"Yes","rawSource":{"_id":"7","AssetID":"E - AXMI - 01","map___license_area":"England / SEPD","Substation":"Axminster GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 x 240MVA (Shared with NGED)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"97.47","minimum_observed_gross_demand__mva_":"20.20","contracted_demand_excl_bess__mva_":"64.51","contracted_bess_demand__mva_":"143.61","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"127.38","contracted_generation__mw_":"310.78","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"9.95","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 02","name":"Yeovil BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Axminster GSP","upstreamBsp":"N/A","demand":{"raw":"16.94","value":"16.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"12.00","technicalLimits":"Yes","rawSource":{"_id":"8","AssetID":"E - AXMI - 02","map___license_area":"England / SEPD","Substation":"Yeovil BSP","Upstream GSP":"Axminster GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30 / 60MVA + 1 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"97.47","minimum_observed_gross_demand__mva_":"20.20","contracted_demand_excl_bess__mva_":"64.51","contracted_bess_demand__mva_":"12.00","estimated_demand_headroom__mva_":"16.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"92.38","contracted_generation__mw_":"85.98","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.39","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-31","Substation Reinforcement Completion Date":"May-31"}},{"id":"E - AXMI - 03","name":"Castle Cary Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"6.81","value":"6.81","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"9","AssetID":"E - AXMI - 03","map___license_area":"England / SEPD","Substation":"Castle Cary Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.87","minimum_observed_gross_demand__mva_":"1.24","contracted_demand_excl_bess__mva_":"2.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.81","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.25","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.94","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 04","name":"Chilton Cantello Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"7.15","value":"7.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"10","AssetID":"E - AXMI - 04","map___license_area":"England / SEPD","Substation":"Chilton Cantello Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.78","minimum_observed_gross_demand__mva_":"1.39","contracted_demand_excl_bess__mva_":"4.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 05","name":"Henstridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"13.55","value":"13.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"11","AssetID":"E - AXMI - 05","map___license_area":"England / SEPD","Substation":"Henstridge Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.84","minimum_observed_gross_demand__mva_":"1.27","contracted_demand_excl_bess__mva_":"5.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"5.94","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 06","name":"Larkhill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"12.27","value":"12.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"12","AssetID":"E - AXMI - 06","map___license_area":"England / SEPD","Substation":"Larkhill Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.63","minimum_observed_gross_demand__mva_":"2.23","contracted_demand_excl_bess__mva_":"8.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 07","name":"Milborne Port Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"2.14","value":"2.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"13","AssetID":"E - AXMI - 07","map___license_area":"England / SEPD","Substation":"Milborne Port Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.91","minimum_observed_gross_demand__mva_":"0.56","contracted_demand_excl_bess__mva_":"0.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"4.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 08","name":"Pulham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"6.11","value":"6.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"14","AssetID":"E - AXMI - 08","map___license_area":"England / SEPD","Substation":"Pulham Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.03","minimum_observed_gross_demand__mva_":"0.58","contracted_demand_excl_bess__mva_":"0.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 09","name":"Sherborne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"5.36","value":"5.36","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"15","AssetID":"E - AXMI - 09","map___license_area":"England / SEPD","Substation":"Sherborne Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.01","minimum_observed_gross_demand__mva_":"1.76","contracted_demand_excl_bess__mva_":"1.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.36","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 10","name":"Sparkford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"2.18","value":"2.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"16","AssetID":"E - AXMI - 10","map___license_area":"England / SEPD","Substation":"Sparkford Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.88","minimum_observed_gross_demand__mva_":"0.82","contracted_demand_excl_bess__mva_":"0.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 11","name":"West Hendford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"16.94","value":"16.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"17","AssetID":"E - AXMI - 11","map___license_area":"England / SEPD","Substation":"West Hendford Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.76","minimum_observed_gross_demand__mva_":"3.07","contracted_demand_excl_bess__mva_":"12.90","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - AXMI - 12","name":"Yeovil Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"5.88","value":"5.88","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"18","AssetID":"E - AXMI - 12","map___license_area":"England / SEPD","Substation":"Yeovil Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.46","minimum_observed_gross_demand__mva_":"3.67","contracted_demand_excl_bess__mva_":"7.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.88","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"15.21","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.55","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-26"}},{"id":"E - AXMI - 13","name":"Yetminster Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Axminster GSP","upstreamBsp":"Yeovil BSP","demand":{"raw":"8.23","value":"8.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"19","AssetID":"E - AXMI - 13","map___license_area":"England / SEPD","Substation":"Yetminster Primary","Upstream GSP":"Axminster GSP","Upstream BSP":"Yeovil BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 12MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.67","minimum_observed_gross_demand__mva_":"1.22","contracted_demand_excl_bess__mva_":"0.72","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.82","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 01","name":"Botley Wood GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"265.83","technicalLimits":"Yes","rawSource":{"_id":"20","AssetID":"E - BOTW - 01","map___license_area":"England / SEPD","Substation":"Botley Wood GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"142.14","minimum_observed_gross_demand__mva_":"21.76","contracted_demand_excl_bess__mva_":"37.07","contracted_bess_demand__mva_":"265.83","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"104.36","contracted_generation__mw_":"439.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"10.07","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 02","name":"Botley Wood BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Botley Wood GSP","upstreamBsp":"N/A","demand":{"raw":"71.60","value":"71.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"67.53","technicalLimits":"Yes","rawSource":{"_id":"21","AssetID":"E - BOTW - 02","map___license_area":"England / SEPD","Substation":"Botley Wood BSP","Upstream GSP":"Botley Wood GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.09","minimum_observed_gross_demand__mva_":"5.90","contracted_demand_excl_bess__mva_":"20.31","contracted_bess_demand__mva_":"67.53","estimated_demand_headroom__mva_":"71.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"68.90","contracted_generation__mw_":"77.99","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.42","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 03","name":"Netley Common BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Botley Wood GSP","upstreamBsp":"N/A","demand":{"raw":"7.46","value":"7.46","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"12.50","technicalLimits":"Yes","rawSource":{"_id":"22","AssetID":"E - BOTW - 03","map___license_area":"England / SEPD","Substation":"Netley Common BSP","Upstream GSP":"Botley Wood GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"99.07","minimum_observed_gross_demand__mva_":"22.94","contracted_demand_excl_bess__mva_":"16.77","contracted_bess_demand__mva_":"12.50","estimated_demand_headroom__mva_":"7.46","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"33.74","contracted_generation__mw_":"38.42","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-28"}},{"id":"E - BOTW - 04","name":"Park Gate Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Botley Wood BSP","demand":{"raw":"17.04","value":"17.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"23","AssetID":"E - BOTW - 04","map___license_area":"England / SEPD","Substation":"Park Gate Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Botley Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.12","minimum_observed_gross_demand__mva_":"2.41","contracted_demand_excl_bess__mva_":"3.29","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"17.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 05","name":"Whitely Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Botley Wood BSP","demand":{"raw":"0.37","value":"0.37","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"24","AssetID":"E - BOTW - 05","map___license_area":"England / SEPD","Substation":"Whitely Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Botley Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.00","minimum_observed_gross_demand__mva_":"4.49","contracted_demand_excl_bess__mva_":"17.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.37","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.36","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-27"}},{"id":"E - BOTW - 06","name":"Bishops Waltham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"7.32","value":"7.32","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"25","AssetID":"E - BOTW - 06","map___license_area":"England / SEPD","Substation":"Bishops Waltham Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.63","minimum_observed_gross_demand__mva_":"2.25","contracted_demand_excl_bess__mva_":"2.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.32","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":"Dec-28"}},{"id":"E - BOTW - 07","name":"Bitterne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"3.40","value":"3.40","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"26","AssetID":"E - BOTW - 07","map___license_area":"England / SEPD","Substation":"Bitterne Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.33","minimum_observed_gross_demand__mva_":"1.88","contracted_demand_excl_bess__mva_":"0.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.40","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 08","name":"Hamble Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"7.46","value":"7.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"27","AssetID":"E - BOTW - 08","map___license_area":"England / SEPD","Substation":"Hamble Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.62","minimum_observed_gross_demand__mva_":"5.95","contracted_demand_excl_bess__mva_":"0.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 09","name":"Netley Common Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"28","AssetID":"E - BOTW - 09","map___license_area":"England / SEPD","Substation":"Netley Common Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.03","minimum_observed_gross_demand__mva_":"6.65","contracted_demand_excl_bess__mva_":"7.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Apr-27"}},{"id":"E - BOTW - 10","name":"Townhill Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"7.46","value":"7.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"29","AssetID":"E - BOTW - 10","map___license_area":"England / SEPD","Substation":"Townhill Park Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.89","minimum_observed_gross_demand__mva_":"2.71","contracted_demand_excl_bess__mva_":"1.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.83","contracted_generation__mw_":"0.50","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 11","name":"Weston Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"7.46","value":"7.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"30","AssetID":"E - BOTW - 11","map___license_area":"England / SEPD","Substation":"Weston Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.19","minimum_observed_gross_demand__mva_":"2.00","contracted_demand_excl_bess__mva_":"1.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":null}},{"id":"E - BOTW - 12","name":"Woolston Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Botley Wood GSP","upstreamBsp":"Netley Common BSP","demand":{"raw":"7.46","value":"7.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"31","AssetID":"E - BOTW - 12","map___license_area":"England / SEPD","Substation":"Woolston Primary","Upstream GSP":"Botley Wood GSP","Upstream BSP":"Netley Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.04","minimum_observed_gross_demand__mva_":"2.90","contracted_demand_excl_bess__mva_":"3.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 01","name":"Bramley (Ames-That) GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"28.62","technicalLimits":"Yes","rawSource":{"_id":"32","AssetID":"E - BRLE (AT) - 01","map___license_area":"England / SEPD","Substation":"Bramley (Ames-That) GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"183.03","minimum_observed_gross_demand__mva_":"61.20","contracted_demand_excl_bess__mva_":"66.79","contracted_bess_demand__mva_":"28.62","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"56.20","contracted_generation__mw_":"163.70","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"9.13","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - BRLE (AT) - 02","name":"Amesbury BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"N/A","demand":{"raw":"63.67","value":"63.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"33","AssetID":"E - BRLE (AT) - 02","map___license_area":"England / SEPD","Substation":"Amesbury BSP","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"48.52","minimum_observed_gross_demand__mva_":"12.83","contracted_demand_excl_bess__mva_":"4.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"63.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.76","contracted_generation__mw_":"0.22","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 03","name":"Thatcham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"N/A","demand":{"raw":"30.28","value":"30.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"34","AssetID":"E - BRLE (AT) - 03","map___license_area":"England / SEPD","Substation":"Thatcham BSP","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 30 / 60MVA + 2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"132.95","minimum_observed_gross_demand__mva_":"37.63","contracted_demand_excl_bess__mva_":"54.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"30.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"28.40","contracted_generation__mw_":"23.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"21.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-27","Substation Reinforcement Completion Date":"Apr-27"}},{"id":"E - BRLE (AT) - 04","name":"Boscombe Down Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Amesbury BSP","demand":{"raw":"10.37","value":"10.37","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"35","AssetID":"E - BRLE (AT) - 04","map___license_area":"England / SEPD","Substation":"Boscombe Down Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Amesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.12","minimum_observed_gross_demand__mva_":"3.05","contracted_demand_excl_bess__mva_":"1.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.37","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.17","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 05","name":"Enford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Amesbury BSP","demand":{"raw":"6.78","value":"6.78","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"36","AssetID":"E - BRLE (AT) - 05","map___license_area":"England / SEPD","Substation":"Enford Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Amesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.47","minimum_observed_gross_demand__mva_":"0.57","contracted_demand_excl_bess__mva_":"0.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.78","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 06","name":"Park House Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Amesbury BSP","demand":{"raw":"3.52","value":"3.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"37","AssetID":"E - BRLE (AT) - 06","map___license_area":"England / SEPD","Substation":"Park House Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Amesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.66","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 07","name":"Pewsey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Amesbury BSP","demand":{"raw":"5.21","value":"5.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"38","AssetID":"E - BRLE (AT) - 07","map___license_area":"England / SEPD","Substation":"Pewsey Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Amesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.70","minimum_observed_gross_demand__mva_":"1.13","contracted_demand_excl_bess__mva_":"0.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.59","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.96","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 08","name":"Ratfyn Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Amesbury BSP","demand":{"raw":"10.85","value":"10.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"39","AssetID":"E - BRLE (AT) - 08","map___license_area":"England / SEPD","Substation":"Ratfyn Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Amesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.87","minimum_observed_gross_demand__mva_":"2.07","contracted_demand_excl_bess__mva_":"1.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 09","name":"Ratfyn Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"9.11","value":"9.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"40","AssetID":"E - BRLE (AT) - 09","map___license_area":"England / SEPD","Substation":"Ratfyn Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.21","minimum_observed_gross_demand__mva_":"1.19","contracted_demand_excl_bess__mva_":"1.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 10","name":"Beenham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"5.89","value":"5.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"41","AssetID":"E - BRLE (AT) - 10","map___license_area":"England / SEPD","Substation":"Beenham Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.67","minimum_observed_gross_demand__mva_":"0.96","contracted_demand_excl_bess__mva_":"0.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.44","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-31","Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 11","name":"Hungerford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"3.85","value":"3.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"42","AssetID":"E - BRLE (AT) - 11","map___license_area":"England / SEPD","Substation":"Hungerford Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.11","minimum_observed_gross_demand__mva_":"1.78","contracted_demand_excl_bess__mva_":"1.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-26"}},{"id":"E - BRLE (AT) - 12","name":"Kingsclere Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"4.07","value":"4.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"43","AssetID":"E - BRLE (AT) - 12","map___license_area":"England / SEPD","Substation":"Kingsclere Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.21","minimum_observed_gross_demand__mva_":"0.75","contracted_demand_excl_bess__mva_":"0.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 13","name":"Kintbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"4.04","value":"4.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"44","AssetID":"E - BRLE (AT) - 13","map___license_area":"England / SEPD","Substation":"Kintbury Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.58","minimum_observed_gross_demand__mva_":"0.81","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 14","name":"Lambourn Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"1.89","value":"1.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"45","AssetID":"E - BRLE (AT) - 14","map___license_area":"England / SEPD","Substation":"Lambourn Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.06","minimum_observed_gross_demand__mva_":"1.39","contracted_demand_excl_bess__mva_":"1.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.97","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-27"}},{"id":"E - BRLE (AT) - 15","name":"Leckhampstead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"3.57","value":"3.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"46","AssetID":"E - BRLE (AT) - 15","map___license_area":"England / SEPD","Substation":"Leckhampstead Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.39","minimum_observed_gross_demand__mva_":"1.96","contracted_demand_excl_bess__mva_":"0.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 16","name":"Love Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"10.28","value":"10.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"47","AssetID":"E - BRLE (AT) - 16","map___license_area":"England / SEPD","Substation":"Love Lane Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.63","minimum_observed_gross_demand__mva_":"6.21","contracted_demand_excl_bess__mva_":"12.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 17","name":"Riverside Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"10.59","value":"10.59","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"48","AssetID":"E - BRLE (AT) - 17","map___license_area":"England / SEPD","Substation":"Riverside Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 19.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.46","minimum_observed_gross_demand__mva_":"1.79","contracted_demand_excl_bess__mva_":"4.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.59","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"15.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 18","name":"St Johns Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"4.60","value":"4.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"49","AssetID":"E - BRLE (AT) - 18","map___license_area":"England / SEPD","Substation":"St Johns Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20 / 28MVA + 1 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.71","minimum_observed_gross_demand__mva_":"4.29","contracted_demand_excl_bess__mva_":"8.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 19","name":"Tadley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"17.23","value":"17.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"50","AssetID":"E - BRLE (AT) - 19","map___license_area":"England / SEPD","Substation":"Tadley Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.14","minimum_observed_gross_demand__mva_":"1.51","contracted_demand_excl_bess__mva_":"2.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"17.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 20","name":"Thatcham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"2.15","value":"2.15","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"51","AssetID":"E - BRLE (AT) - 20","map___license_area":"England / SEPD","Substation":"Thatcham Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.50","minimum_observed_gross_demand__mva_":"6.18","contracted_demand_excl_bess__mva_":"6.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.15","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.12","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (AT) - 21","name":"Yattendon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Ames-That) GSP","upstreamBsp":"Thatcham BSP","demand":{"raw":"6.28","value":"6.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"52","AssetID":"E - BRLE (AT) - 21","map___license_area":"England / SEPD","Substation":"Yattendon Primary","Upstream GSP":"Bramley (Ames-That) GSP","Upstream BSP":"Thatcham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.11","minimum_observed_gross_demand__mva_":"1.78","contracted_demand_excl_bess__mva_":"1.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"6.63","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 01","name":"Bramley (Basi) GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"21.05","technicalLimits":"Yes","rawSource":{"_id":"53","AssetID":"E - BRLE (B) - 01","map___license_area":"England / SEPD","Substation":"Bramley (Basi) GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"129.21","minimum_observed_gross_demand__mva_":"9.95","contracted_demand_excl_bess__mva_":"66.61","contracted_bess_demand__mva_":"21.05","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"165.16","contracted_generation__mw_":"98.61","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"16.85","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-30"}},{"id":"E - BRLE (B) - 02","name":"Basingstoke (T1A & T2A) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 32","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"N/A","demand":{"raw":"26.86","value":"26.86","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"54","AssetID":"E - BRLE (B) - 02","map___license_area":"England / SEPD","Substation":"Basingstoke (T1A & T2A) BSP","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 32","Transformer Nameplate Ratings":"1 x 60MVA + 1 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"38.28","minimum_observed_gross_demand__mva_":"13.78","contracted_demand_excl_bess__mva_":"19.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"26.86","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"12.30","contracted_generation__mw_":"28.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"16.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - BRLE (B) - 03","name":"Basingstoke (T1B & T2B) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"N/A","demand":{"raw":"45.89","value":"45.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"55","AssetID":"E - BRLE (B) - 03","map___license_area":"England / SEPD","Substation":"Basingstoke (T1B & T2B) BSP","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"63.45","minimum_observed_gross_demand__mva_":"20.47","contracted_demand_excl_bess__mva_":"11.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"45.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"52.86","contracted_generation__mw_":"0.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"14.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - BRLE (B) - 04","name":"Basingstoke (T3 & T4) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"N/A","demand":{"raw":"54.68","value":"54.68","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"21.05","technicalLimits":"Yes","rawSource":{"_id":"56","AssetID":"E - BRLE (B) - 04","map___license_area":"England / SEPD","Substation":"Basingstoke (T3 & T4) BSP","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"40.40","minimum_observed_gross_demand__mva_":"12.31","contracted_demand_excl_bess__mva_":"35.67","contracted_bess_demand__mva_":"21.05","estimated_demand_headroom__mva_":"54.68","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"69.71","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 05","name":"Basingstoke Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1A & T2A) BSP","demand":{"raw":"16.24","value":"16.24","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"57","AssetID":"E - BRLE (B) - 05","map___license_area":"England / SEPD","Substation":"Basingstoke Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1A & T2A) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.95","minimum_observed_gross_demand__mva_":"1.43","contracted_demand_excl_bess__mva_":"2.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.24","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.27","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 06","name":"Jays Close Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1A & T2A) BSP","demand":{"raw":"11.11","value":"11.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"58","AssetID":"E - BRLE (B) - 06","map___license_area":"England / SEPD","Substation":"Jays Close Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1A & T2A) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.37","minimum_observed_gross_demand__mva_":"7.03","contracted_demand_excl_bess__mva_":"17.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"5.58","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"14.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 07","name":"Arborfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1B & T2B) BSP","demand":{"raw":"8.37","value":"8.37","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"59","AssetID":"E - BRLE (B) - 07","map___license_area":"England / SEPD","Substation":"Arborfield Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1B & T2B) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.67","minimum_observed_gross_demand__mva_":"2.34","contracted_demand_excl_bess__mva_":"9.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.37","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.01","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 08","name":"Bramley Green Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1B & T2B) BSP","demand":{"raw":"11.18","value":"11.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"60","AssetID":"E - BRLE (B) - 08","map___license_area":"England / SEPD","Substation":"Bramley Green Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1B & T2B) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.63","minimum_observed_gross_demand__mva_":"0.91","contracted_demand_excl_bess__mva_":"0.83","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 09","name":"Chineham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1B & T2B) BSP","demand":{"raw":"15.99","value":"15.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"61","AssetID":"E - BRLE (B) - 09","map___license_area":"England / SEPD","Substation":"Chineham Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1B & T2B) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.03","minimum_observed_gross_demand__mva_":"2.99","contracted_demand_excl_bess__mva_":"6.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"12.70","contracted_generation__mw_":"0.70","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.95","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 10","name":"Down Grange Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1B & T2B) BSP","demand":{"raw":"11.27","value":"11.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"62","AssetID":"E - BRLE (B) - 10","map___license_area":"England / SEPD","Substation":"Down Grange Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1B & T2B) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.66","minimum_observed_gross_demand__mva_":"3.27","contracted_demand_excl_bess__mva_":"0.99","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 11","name":"Overton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T1B & T2B) BSP","demand":{"raw":"32.03","value":"32.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"63","AssetID":"E - BRLE (B) - 11","map___license_area":"England / SEPD","Substation":"Overton Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T1B & T2B) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.30","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"1.96","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"32.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"8.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 12","name":"Brook Street Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T3 & T4) BSP","demand":{"raw":"15.14","value":"15.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"64","AssetID":"E - BRLE (B) - 12","map___license_area":"England / SEPD","Substation":"Brook Street Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T3 & T4) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.37","minimum_observed_gross_demand__mva_":"3.27","contracted_demand_excl_bess__mva_":"2.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 13","name":"Houndmills Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T3 & T4) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"65","AssetID":"E - BRLE (B) - 13","map___license_area":"England / SEPD","Substation":"Houndmills Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T3 & T4) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.42","minimum_observed_gross_demand__mva_":"6.05","contracted_demand_excl_bess__mva_":"27.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - BRLE (B) - 14","name":"Oarkridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bramley (Basi) GSP","upstreamBsp":"Basingstoke (T3 & T4) BSP","demand":{"raw":"15.47","value":"15.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"66","AssetID":"E - BRLE (B) - 14","map___license_area":"England / SEPD","Substation":"Oarkridge Primary","Upstream GSP":"Bramley (Basi) GSP","Upstream BSP":"Basingstoke (T3 & T4) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.54","minimum_observed_gross_demand__mva_":"2.23","contracted_demand_excl_bess__mva_":"5.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 01","name":"Chickerell GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"110.69","technicalLimits":"Yes","rawSource":{"_id":"67","AssetID":"E - CHIC - 01","map___license_area":"England / SEPD","Substation":"Chickerell GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"2 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"87.67","minimum_observed_gross_demand__mva_":"11.68","contracted_demand_excl_bess__mva_":"20.32","contracted_bess_demand__mva_":"110.69","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"69.11","contracted_generation__mw_":"125.13","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.63","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 02","name":"Chickerell BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Chickerell GSP","upstreamBsp":"N/A","demand":{"raw":"21.20","value":"21.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"110.69","technicalLimits":"Yes","rawSource":{"_id":"68","AssetID":"E - CHIC - 02","map___license_area":"England / SEPD","Substation":"Chickerell BSP","Upstream GSP":"Chickerell GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"84.78","minimum_observed_gross_demand__mva_":"12.21","contracted_demand_excl_bess__mva_":"20.32","contracted_bess_demand__mva_":"110.69","estimated_demand_headroom__mva_":"21.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"69.11","contracted_generation__mw_":"125.13","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"13.67","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-28"}},{"id":"E - CHIC - 03","name":"Cerne Abbas Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"2.00","value":"2.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"69","AssetID":"E - CHIC - 03","map___license_area":"England / SEPD","Substation":"Cerne Abbas Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.37","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-28"}},{"id":"E - CHIC - 04","name":"Charminster Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"4.86","value":"4.86","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"70","AssetID":"E - CHIC - 04","map___license_area":"England / SEPD","Substation":"Charminster Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.18","minimum_observed_gross_demand__mva_":"1.63","contracted_demand_excl_bess__mva_":"1.90","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.86","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.52","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 05","name":"Chickerell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"21.20","value":"21.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"71","AssetID":"E - CHIC - 05","map___license_area":"England / SEPD","Substation":"Chickerell Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14.8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.23","minimum_observed_gross_demand__mva_":"1.41","contracted_demand_excl_bess__mva_":"1.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"21.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"4.96","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 06","name":"Dorchester Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"19.32","value":"19.32","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"72","AssetID":"E - CHIC - 06","map___license_area":"England / SEPD","Substation":"Dorchester Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.93","minimum_observed_gross_demand__mva_":"3.55","contracted_demand_excl_bess__mva_":"3.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"19.32","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.56","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 07","name":"Maiden Newton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"5.82","value":"5.82","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"73","AssetID":"E - CHIC - 07","map___license_area":"England / SEPD","Substation":"Maiden Newton Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.74","minimum_observed_gross_demand__mva_":"0.97","contracted_demand_excl_bess__mva_":"0.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.82","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.15","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 08","name":"Piddletrenthide Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"3.20","value":"3.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"74","AssetID":"E - CHIC - 08","map___license_area":"England / SEPD","Substation":"Piddletrenthide Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5 / 6.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.91","minimum_observed_gross_demand__mva_":"0.71","contracted_demand_excl_bess__mva_":"0.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.71","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 09","name":"Portland Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"6.48","value":"6.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"75","AssetID":"E - CHIC - 09","map___license_area":"England / SEPD","Substation":"Portland Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.51","minimum_observed_gross_demand__mva_":"2.06","contracted_demand_excl_bess__mva_":"3.88","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 10","name":"Puddletown Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"5.80","value":"5.80","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"76","AssetID":"E - CHIC - 10","map___license_area":"England / SEPD","Substation":"Puddletown Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.38","minimum_observed_gross_demand__mva_":"0.34","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.80","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 11","name":"Redlands Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"3.84","value":"3.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"77","AssetID":"E - CHIC - 11","map___license_area":"England / SEPD","Substation":"Redlands Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.66","minimum_observed_gross_demand__mva_":"1.25","contracted_demand_excl_bess__mva_":"3.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.39","contracted_generation__mw_":"0.03","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - CHIC - 12","name":"Weymouth Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Chickerell GSP","upstreamBsp":"Chickerell BSP","demand":{"raw":"13.33","value":"13.33","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"78","AssetID":"E - CHIC - 12","map___license_area":"England / SEPD","Substation":"Weymouth Primary","Upstream GSP":"Chickerell GSP","Upstream BSP":"Chickerell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.13","minimum_observed_gross_demand__mva_":"4.44","contracted_demand_excl_bess__mva_":"4.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.33","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.45","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"13.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 01","name":"Cowley GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"162.59","technicalLimits":"Yes","rawSource":{"_id":"79","AssetID":"E - COWL - 01","map___license_area":"England / SEPD","Substation":"Cowley GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"5 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"665.76","minimum_observed_gross_demand__mva_":"237.56","contracted_demand_excl_bess__mva_":"577.78","contracted_bess_demand__mva_":"162.59","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"388.95","contracted_generation__mw_":"818.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.07","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 02","name":"Cowley Local (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"11.21","value":"11.21","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"80","AssetID":"E - COWL - 02","map___license_area":"England / SEPD","Substation":"Cowley Local (Main) BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"64.10","minimum_observed_gross_demand__mva_":"11.86","contracted_demand_excl_bess__mva_":"70.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.21","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.21","contracted_generation__mw_":"42.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":"Jan-29"}},{"id":"E - COWL - 03","name":"Cowley Local (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"53.81","value":"53.81","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"50.00","technicalLimits":"Yes","rawSource":{"_id":"81","AssetID":"E - COWL - 03","map___license_area":"England / SEPD","Substation":"Cowley Local (Reserve) BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.04","minimum_observed_gross_demand__mva_":"3.90","contracted_demand_excl_bess__mva_":"32.93","contracted_bess_demand__mva_":"50.00","estimated_demand_headroom__mva_":"53.81","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"22.36","contracted_generation__mw_":"64.87","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.06","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-27"}},{"id":"E - COWL - 04","name":"Drayton BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"82","AssetID":"E - COWL - 04","map___license_area":"England / SEPD","Substation":"Drayton BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"3 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"102.02","minimum_observed_gross_demand__mva_":"21.52","contracted_demand_excl_bess__mva_":"76.88","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"103.43","contracted_generation__mw_":"84.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.97","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 05","name":"Headington BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"6.67","value":"6.67","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"83","AssetID":"E - COWL - 05","map___license_area":"England / SEPD","Substation":"Headington BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"56.51","minimum_observed_gross_demand__mva_":"8.14","contracted_demand_excl_bess__mva_":"78.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.67","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"44.43","contracted_generation__mw_":"18.95","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Nov-26","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 06","name":"High Wycombe BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"14.49","value":"14.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"84","AssetID":"E - COWL - 06","map___license_area":"England / SEPD","Substation":"High Wycombe BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"87.04","minimum_observed_gross_demand__mva_":"23.57","contracted_demand_excl_bess__mva_":"26.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"14.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.97","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 07","name":"Oxford (Osney) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"3.00","technicalLimits":"Yes","rawSource":{"_id":"85","AssetID":"E - COWL - 07","map___license_area":"England / SEPD","Substation":"Oxford (Osney) BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"77.40","minimum_observed_gross_demand__mva_":"16.99","contracted_demand_excl_bess__mva_":"48.26","contracted_bess_demand__mva_":"3.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"62.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":"Mar-31"}},{"id":"E - COWL - 08","name":"Witney BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"23.10","value":"23.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"39.53","technicalLimits":"Yes","rawSource":{"_id":"86","AssetID":"E - COWL - 08","map___license_area":"England / SEPD","Substation":"Witney BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"74.82","minimum_observed_gross_demand__mva_":"24.09","contracted_demand_excl_bess__mva_":"34.34","contracted_bess_demand__mva_":"39.53","estimated_demand_headroom__mva_":"23.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"54.05","contracted_generation__mw_":"91.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.22","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - COWL - 09","name":"Yarnton BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"4.80","technicalLimits":"Yes","rawSource":{"_id":"87","AssetID":"E - COWL - 09","map___license_area":"England / SEPD","Substation":"Yarnton BSP","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"72.78","minimum_observed_gross_demand__mva_":"23.44","contracted_demand_excl_bess__mva_":"141.95","contracted_bess_demand__mva_":"4.80","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"46.25","contracted_generation__mw_":"117.49","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.36","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-29","Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - COWL - 10","name":"Culham Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"15.49","value":"15.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"88","AssetID":"E - COWL - 10","map___license_area":"England / SEPD","Substation":"Culham Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15 + 1 x 10/20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.35","minimum_observed_gross_demand__mva_":"0.91","contracted_demand_excl_bess__mva_":"19.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"E - COWL - 11","name":"Harwell Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"N/A","demand":{"raw":"39.07","value":"39.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"5.26","technicalLimits":"Yes","rawSource":{"_id":"89","AssetID":"E - COWL - 11","map___license_area":"England / SEPD","Substation":"Harwell Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.75","minimum_observed_gross_demand__mva_":"1.90","contracted_demand_excl_bess__mva_":"6.68","contracted_bess_demand__mva_":"5.26","estimated_demand_headroom__mva_":"39.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"23.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 12","name":"Cowley Local Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"90","AssetID":"E - COWL - 12","map___license_area":"England / SEPD","Substation":"Cowley Local Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.77","minimum_observed_gross_demand__mva_":"6.86","contracted_demand_excl_bess__mva_":"38.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.79","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"23.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-26"}},{"id":"E - COWL - 13","name":"Rose Hill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"91","AssetID":"E - COWL - 13","map___license_area":"England / SEPD","Substation":"Rose Hill Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.68","minimum_observed_gross_demand__mva_":"3.44","contracted_demand_excl_bess__mva_":"28.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.43","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.11","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jul-31","Substation Reinforcement Completion Date":"Jul-31"}},{"id":"E - COWL - 14","name":"Union Street Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Main) BSP","demand":{"raw":"5.93","value":"5.93","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"92","AssetID":"E - COWL - 14","map___license_area":"England / SEPD","Substation":"Union Street Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA + 1 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.70","minimum_observed_gross_demand__mva_":"2.70","contracted_demand_excl_bess__mva_":"4.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.93","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.55","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 15","name":"Berinsfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Reserve) BSP","demand":{"raw":"10.07","value":"10.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"93","AssetID":"E - COWL - 15","map___license_area":"England / SEPD","Substation":"Berinsfield Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.84","minimum_observed_gross_demand__mva_":"1.88","contracted_demand_excl_bess__mva_":"5.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"6.14","contracted_generation__mw_":"0.13","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"11.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-31","Substation Reinforcement Completion Date":"Sep-31"}},{"id":"E - COWL - 16","name":"Kennington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Reserve) BSP","demand":{"raw":"1.19","value":"1.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"94","AssetID":"E - COWL - 16","map___license_area":"England / SEPD","Substation":"Kennington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 12.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.51","minimum_observed_gross_demand__mva_":"0.70","contracted_demand_excl_bess__mva_":"0.51","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.38","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 17","name":"Wallingford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Cowley Local (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"95","AssetID":"E - COWL - 17","map___license_area":"England / SEPD","Substation":"Wallingford Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Cowley Local (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.21","minimum_observed_gross_demand__mva_":"3.36","contracted_demand_excl_bess__mva_":"4.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"4.44","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-26","Substation Reinforcement Completion Date":"Sep-31"}},{"id":"E - COWL - 18","name":"Cholsey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"96","AssetID":"E - COWL - 18","map___license_area":"England / SEPD","Substation":"Cholsey Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.78","minimum_observed_gross_demand__mva_":"1.12","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.44","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 19","name":"Fulscot Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"97","AssetID":"E - COWL - 19","map___license_area":"England / SEPD","Substation":"Fulscot Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.44","minimum_observed_gross_demand__mva_":"3.08","contracted_demand_excl_bess__mva_":"7.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"15.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 20","name":"Grove Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"98","AssetID":"E - COWL - 20","map___license_area":"England / SEPD","Substation":"Grove Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.05","minimum_observed_gross_demand__mva_":"3.74","contracted_demand_excl_bess__mva_":"8.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.36","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 21","name":"Milton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"99","AssetID":"E - COWL - 21","map___license_area":"England / SEPD","Substation":"Milton Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.11","minimum_observed_gross_demand__mva_":"8.78","contracted_demand_excl_bess__mva_":"22.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"21.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 22","name":"Wantage Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"100","AssetID":"E - COWL - 22","map___license_area":"England / SEPD","Substation":"Wantage Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.67","minimum_observed_gross_demand__mva_":"2.18","contracted_demand_excl_bess__mva_":"3.66","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 23","name":"Winsmore Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Drayton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"101","AssetID":"E - COWL - 23","map___license_area":"England / SEPD","Substation":"Winsmore Lane Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Drayton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.00","minimum_observed_gross_demand__mva_":"2.85","contracted_demand_excl_bess__mva_":"2.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.28","contracted_generation__mw_":"0.19","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 24","name":"Arncott Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Headington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"102","AssetID":"E - COWL - 24","map___license_area":"England / SEPD","Substation":"Arncott Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Headington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.75","minimum_observed_gross_demand__mva_":"1.46","contracted_demand_excl_bess__mva_":"16.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.38","contracted_generation__mw_":"0.45","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"May-26"}},{"id":"E - COWL - 25","name":"Headington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Headington BSP","demand":{"raw":"6.67","value":"6.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"103","AssetID":"E - COWL - 25","map___license_area":"England / SEPD","Substation":"Headington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Headington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.39","minimum_observed_gross_demand__mva_":"3.17","contracted_demand_excl_bess__mva_":"8.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"18.55","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 26","name":"Old Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Headington BSP","demand":{"raw":"6.67","value":"6.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"104","AssetID":"E - COWL - 26","map___license_area":"England / SEPD","Substation":"Old Road Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Headington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.25","minimum_observed_gross_demand__mva_":"7.95","contracted_demand_excl_bess__mva_":"0.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"17.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 27","name":"Wheatley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Headington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"105","AssetID":"E - COWL - 27","map___license_area":"England / SEPD","Substation":"Wheatley Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Headington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.24","minimum_observed_gross_demand__mva_":"1.33","contracted_demand_excl_bess__mva_":"19.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.36","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"7.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-26","Substation Reinforcement Completion Date":"Oct-26"}},{"id":"E - COWL - 28","name":"Chisbridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"2.85","value":"2.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"106","AssetID":"E - COWL - 28","map___license_area":"England / SEPD","Substation":"Chisbridge Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.42","minimum_observed_gross_demand__mva_":"1.66","contracted_demand_excl_bess__mva_":"0.86","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.41","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Feb-31","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 29","name":"Fryers Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"11.74","value":"11.74","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"107","AssetID":"E - COWL - 29","map___license_area":"England / SEPD","Substation":"Fryers Lane Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.51","minimum_observed_gross_demand__mva_":"3.01","contracted_demand_excl_bess__mva_":"1.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.74","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 30","name":"High Wycombe Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"2.89","value":"2.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"108","AssetID":"E - COWL - 30","map___license_area":"England / SEPD","Substation":"High Wycombe Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.46","minimum_observed_gross_demand__mva_":"3.19","contracted_demand_excl_bess__mva_":"7.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.70","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 31","name":"High Wycombe Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"14.49","value":"14.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"109","AssetID":"E - COWL - 31","map___license_area":"England / SEPD","Substation":"High Wycombe Town Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.60","minimum_observed_gross_demand__mva_":"5.34","contracted_demand_excl_bess__mva_":"4.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"14.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"15.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 32","name":"Little Marlow Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"8.31","value":"8.31","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"110","AssetID":"E - COWL - 32","map___license_area":"England / SEPD","Substation":"Little Marlow Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.39","minimum_observed_gross_demand__mva_":"3.69","contracted_demand_excl_bess__mva_":"4.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.31","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"10.52","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 33","name":"Nuffield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"1.88","value":"1.88","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"111","AssetID":"E - COWL - 33","map___license_area":"England / SEPD","Substation":"Nuffield Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.40","minimum_observed_gross_demand__mva_":"0.97","contracted_demand_excl_bess__mva_":"1.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.88","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Feb-31","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 34","name":"Stokenchurch Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"112","AssetID":"E - COWL - 34","map___license_area":"England / SEPD","Substation":"Stokenchurch Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.95","minimum_observed_gross_demand__mva_":"1.19","contracted_demand_excl_bess__mva_":"5.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Feb-31","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 35","name":"Watlington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"High Wycombe BSP","demand":{"raw":"2.62","value":"2.62","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"113","AssetID":"E - COWL - 35","map___license_area":"England / SEPD","Substation":"Watlington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"High Wycombe BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.18","minimum_observed_gross_demand__mva_":"1.33","contracted_demand_excl_bess__mva_":"1.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.62","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Feb-31","Substation Reinforcement Completion Date":"Feb-31"}},{"id":"E - COWL - 36","name":"Frenchay Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"114","AssetID":"E - COWL - 36","map___license_area":"England / SEPD","Substation":"Frenchay Road Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.02","minimum_observed_gross_demand__mva_":"1.65","contracted_demand_excl_bess__mva_":"6.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 37","name":"North Hinksey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"115","AssetID":"E - COWL - 37","map___license_area":"England / SEPD","Substation":"North Hinksey Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.49","minimum_observed_gross_demand__mva_":"1.15","contracted_demand_excl_bess__mva_":"2.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.21","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 38","name":"Oxford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"116","AssetID":"E - COWL - 38","map___license_area":"England / SEPD","Substation":"Oxford Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.13","minimum_observed_gross_demand__mva_":"4.71","contracted_demand_excl_bess__mva_":"19.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.17","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.61","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 39","name":"St Ebbes Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"117","AssetID":"E - COWL - 39","map___license_area":"England / SEPD","Substation":"St Ebbes Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.55","minimum_observed_gross_demand__mva_":"4.26","contracted_demand_excl_bess__mva_":"4.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 40","name":"University Parks Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"118","AssetID":"E - COWL - 40","map___license_area":"England / SEPD","Substation":"University Parks Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA + 1 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.83","minimum_observed_gross_demand__mva_":"6.23","contracted_demand_excl_bess__mva_":"0.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"17.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 41","name":"Wootton Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Oxford (Osney) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"119","AssetID":"E - COWL - 41","map___license_area":"England / SEPD","Substation":"Wootton Road Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Oxford (Osney) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.48","minimum_observed_gross_demand__mva_":"2.46","contracted_demand_excl_bess__mva_":"3.83","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.37","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 42","name":"Bledington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"120","AssetID":"E - COWL - 42","map___license_area":"England / SEPD","Substation":"Bledington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"5.01","minimum_observed_gross_demand__mva_":"1.00","contracted_demand_excl_bess__mva_":"1.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.77","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 43","name":"Burford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"3.57","value":"3.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"121","AssetID":"E - COWL - 43","map___license_area":"England / SEPD","Substation":"Burford Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x  6.3MVA + 1 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.08","minimum_observed_gross_demand__mva_":"1.10","contracted_demand_excl_bess__mva_":"0.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 44","name":"Carterton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"15.89","value":"15.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"122","AssetID":"E - COWL - 44","map___license_area":"England / SEPD","Substation":"Carterton Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.50","minimum_observed_gross_demand__mva_":"3.77","contracted_demand_excl_bess__mva_":"2.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.14","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 45","name":"Fyfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"123","AssetID":"E - COWL - 45","map___license_area":"England / SEPD","Substation":"Fyfield Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.04","minimum_observed_gross_demand__mva_":"2.53","contracted_demand_excl_bess__mva_":"7.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 46","name":"Leafield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"1.51","value":"1.51","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"124","AssetID":"E - COWL - 46","map___license_area":"England / SEPD","Substation":"Leafield Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.93","minimum_observed_gross_demand__mva_":"0.57","contracted_demand_excl_bess__mva_":"1.39","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.51","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 47","name":"Rissington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"1.62","value":"1.62","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"125","AssetID":"E - COWL - 47","map___license_area":"England / SEPD","Substation":"Rissington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.93","minimum_observed_gross_demand__mva_":"1.40","contracted_demand_excl_bess__mva_":"4.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.62","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.03","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"4.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 48","name":"Standlake Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"126","AssetID":"E - COWL - 48","map___license_area":"England / SEPD","Substation":"Standlake Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.01","minimum_observed_gross_demand__mva_":"1.17","contracted_demand_excl_bess__mva_":"1.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 49","name":"Windrush Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"13.15","value":"13.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"127","AssetID":"E - COWL - 49","map___license_area":"England / SEPD","Substation":"Windrush Park Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.10","minimum_observed_gross_demand__mva_":"1.45","contracted_demand_excl_bess__mva_":"11.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"12.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 50","name":"Witney Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Witney BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"128","AssetID":"E - COWL - 50","map___license_area":"England / SEPD","Substation":"Witney Town Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Witney BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 22.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.48","minimum_observed_gross_demand__mva_":"5.11","contracted_demand_excl_bess__mva_":"3.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-26"}},{"id":"E - COWL - 51","name":"Charlbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"129","AssetID":"E - COWL - 51","map___license_area":"England / SEPD","Substation":"Charlbury Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.02","minimum_observed_gross_demand__mva_":"1.28","contracted_demand_excl_bess__mva_":"0.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 52","name":"Chipping Norton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"130","AssetID":"E - COWL - 52","map___license_area":"England / SEPD","Substation":"Chipping Norton Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.34","minimum_observed_gross_demand__mva_":"3.56","contracted_demand_excl_bess__mva_":"2.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 53","name":"Deddington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"131","AssetID":"E - COWL - 53","map___license_area":"England / SEPD","Substation":"Deddington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.14","minimum_observed_gross_demand__mva_":"0.60","contracted_demand_excl_bess__mva_":"0.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.29","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.82","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 54","name":"Eynsham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"132","AssetID":"E - COWL - 54","map___license_area":"England / SEPD","Substation":"Eynsham Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"10.23","minimum_observed_gross_demand__mva_":"3.80","contracted_demand_excl_bess__mva_":"9.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 55","name":"Kiddington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"133","AssetID":"E - COWL - 55","map___license_area":"England / SEPD","Substation":"Kiddington Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.92","minimum_observed_gross_demand__mva_":"1.79","contracted_demand_excl_bess__mva_":"9.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.12","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.81","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 56","name":"Lovelace Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"134","AssetID":"E - COWL - 56","map___license_area":"England / SEPD","Substation":"Lovelace Road Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 15 / 30MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"5.05","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"13.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - COWL - 57","name":"Woodstock Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"135","AssetID":"E - COWL - 57","map___license_area":"England / SEPD","Substation":"Woodstock Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.54","minimum_observed_gross_demand__mva_":"1.09","contracted_demand_excl_bess__mva_":"1.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - COWL - 58","name":"Yarnton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cowley GSP","upstreamBsp":"Yarnton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"136","AssetID":"E - COWL - 58","map___license_area":"England / SEPD","Substation":"Yarnton Primary","Upstream GSP":"Cowley GSP","Upstream BSP":"Yarnton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.96","minimum_observed_gross_demand__mva_":"3.72","contracted_demand_excl_bess__mva_":"43.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - EALI - 01","name":"Ealing GSP","area":"England / SEPD","level":"GSP","voltageKv":"275 / 66","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Amber","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"137","AssetID":"E - EALI - 01","map___license_area":"England / SEPD","Substation":"Ealing GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 66","Transformer Nameplate Ratings":"4 x 180MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"194.73","minimum_observed_gross_demand__mva_":"71.34","contracted_demand_excl_bess__mva_":"130.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.11","contracted_generation__mw_":"0.40","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"21.90","unsafe_3_phase_break_fault_level__ka_":"20.50","Substation Generation RAG Status":"Amber","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - EALI - 02","name":"Ealing BSP","area":"England / SEPD","level":"BSP","voltageKv":"66 / 22","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"49.56","value":"49.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"85.61","value":"85.61","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"138","AssetID":"E - EALI - 02","map___license_area":"England / SEPD","Substation":"Ealing BSP","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"66 / 22","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"42.33","minimum_observed_gross_demand__mva_":"9.74","contracted_demand_excl_bess__mva_":"20.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"49.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.11","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"85.61","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.70","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-29"}},{"id":"E - EALI - 03","name":"Boston Manor Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"3.63","value":"3.63","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"46.48","value":"46.48","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"139","AssetID":"E - EALI - 03","map___license_area":"England / SEPD","Substation":"Boston Manor Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x  20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.91","minimum_observed_gross_demand__mva_":"8.48","contracted_demand_excl_bess__mva_":"12.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.63","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"46.48","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"22.96","Substation Generation RAG Status":"Amber","Generation Constraint":"Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - EALI - 04","name":"Bridge Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"23.50","value":"23.50","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"80.38","value":"80.38","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"140","AssetID":"E - EALI - 04","map___license_area":"England / SEPD","Substation":"Bridge Road Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"32.97","minimum_observed_gross_demand__mva_":"8.94","contracted_demand_excl_bess__mva_":"27.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"23.50","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.39","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"80.38","unsafe_3_phase_break_fault_rating__ka_":"26.20","unsafe_3_phase_break_fault_level__ka_":"23.91","Substation Generation RAG Status":"Amber","Generation Constraint":"Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-29"}},{"id":"E - EALI - 05","name":"Copley Dene Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"42.85","value":"42.85","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"141","AssetID":"E - EALI - 05","map___license_area":"England / SEPD","Substation":"Copley Dene Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x  30 / 37.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"28.32","minimum_observed_gross_demand__mva_":"7.22","contracted_demand_excl_bess__mva_":"13.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"42.85","unsafe_3_phase_break_fault_rating__ka_":"26.20","unsafe_3_phase_break_fault_level__ka_":"16.65","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-29"}},{"id":"E - EALI - 06","name":"Ealing Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"44.81","value":"44.81","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"142","AssetID":"E - EALI - 06","map___license_area":"England / SEPD","Substation":"Ealing Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.99","minimum_observed_gross_demand__mva_":"6.81","contracted_demand_excl_bess__mva_":"17.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"44.81","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.50","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jan-27"}},{"id":"E - EALI - 07","name":"Ironbridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"3.55","value":"3.55","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"26.08","value":"26.08","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"143","AssetID":"E - EALI - 07","map___license_area":"England / SEPD","Substation":"Ironbridge Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"23.45","minimum_observed_gross_demand__mva_":"7.08","contracted_demand_excl_bess__mva_":"15.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.55","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"26.08","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.34","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - EALI - 08","name":"Southfield Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"42.88","value":"42.88","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"144","AssetID":"E - EALI - 08","map___license_area":"England / SEPD","Substation":"Southfield Road Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.25","minimum_observed_gross_demand__mva_":"4.88","contracted_demand_excl_bess__mva_":"22.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"42.88","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.59","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-27"}},{"id":"E - EALI - 09","name":"Brentford Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"Ealing BSP","demand":{"raw":"9.46","value":"9.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"34.28","value":"34.28","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"145","AssetID":"E - EALI - 09","map___license_area":"England / SEPD","Substation":"Brentford Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"Ealing BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"4 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.52","minimum_observed_gross_demand__mva_":"5.78","contracted_demand_excl_bess__mva_":"13.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"34.28","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.84","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - EALI - 10","name":"Dean Gardens Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"Ealing BSP","demand":{"raw":"6.32","value":"6.32","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"11.54","value":"11.54","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"146","AssetID":"E - EALI - 10","map___license_area":"England / SEPD","Substation":"Dean Gardens Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"Ealing BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"1 x 10 / 11.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.93","minimum_observed_gross_demand__mva_":"0.75","contracted_demand_excl_bess__mva_":"3.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.32","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.11","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"11.54","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.67","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - EALI - 11","name":"Harvard lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Ealing GSP","upstreamBsp":"Ealing BSP","demand":{"raw":"2.67","value":"2.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"29.15","value":"29.15","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"147","AssetID":"E - EALI - 11","map___license_area":"England / SEPD","Substation":"Harvard lane Primary","Upstream GSP":"Ealing GSP","Upstream BSP":"Ealing BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA + 1 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.34","minimum_observed_gross_demand__mva_":"6.71","contracted_demand_excl_bess__mva_":"3.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"29.15","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.26","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Aug-28","Substation Reinforcement Completion Date":"Aug-28"}},{"id":"E - ECLA - 01","name":"East Claydon GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"181.00","technicalLimits":"No","rawSource":{"_id":"148","AssetID":"E - ECLA - 01","map___license_area":"England / SEPD","Substation":"East Claydon GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"4 x 240MVA (Shared with NGED)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"62.27","minimum_observed_gross_demand__mva_":"8.97","contracted_demand_excl_bess__mva_":"184.69","contracted_bess_demand__mva_":"181.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"49.70","contracted_generation__mw_":"323.86","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"21.20","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":null}},{"id":"E - ECLA - 02","name":"Bicester North BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"East Claydon GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"149","AssetID":"E - ECLA - 02","map___license_area":"England / SEPD","Substation":"Bicester North BSP","Upstream GSP":"East Claydon GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x  45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"62.27","minimum_observed_gross_demand__mva_":"8.97","contracted_demand_excl_bess__mva_":"184.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"49.70","contracted_generation__mw_":"59.36","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.00","unsafe_3_phase_break_fault_level__ka_":"14.52","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-37","Substation Reinforcement Completion Date":"Oct-37"}},{"id":"E - ECLA - 03","name":"Bicester Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"East Claydon GSP","upstreamBsp":"Bicester North BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"150","AssetID":"E - ECLA - 03","map___license_area":"England / SEPD","Substation":"Bicester Primary","Upstream GSP":"East Claydon GSP","Upstream BSP":"Bicester North BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 X 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.67","minimum_observed_gross_demand__mva_":"3.87","contracted_demand_excl_bess__mva_":"24.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.24","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"19.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Jan-28","Substation Reinforcement Completion Date":null}},{"id":"E - ECLA - 04","name":"Bicester North Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"East Claydon GSP","upstreamBsp":"Bicester North BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"151","AssetID":"E - ECLA - 04","map___license_area":"England / SEPD","Substation":"Bicester North Primary","Upstream GSP":"East Claydon GSP","Upstream BSP":"Bicester North BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.76","minimum_observed_gross_demand__mva_":"4.67","contracted_demand_excl_bess__mva_":"35.92","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"18.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-37"}},{"id":"E - ECLA - 05","name":"Cottisford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"East Claydon GSP","upstreamBsp":"Bicester North BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"152","AssetID":"E - ECLA - 05","map___license_area":"England / SEPD","Substation":"Cottisford Primary","Upstream GSP":"East Claydon GSP","Upstream BSP":"Bicester North BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.18","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"0.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.58","contracted_generation__mw_":"0.12","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"5.11","unsafe_3_phase_break_fault_level__ka_":"2.63","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - ECLA - 06","name":"Upper Heyford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"East Claydon GSP","upstreamBsp":"Bicester North BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"153","AssetID":"E - ECLA - 06","map___license_area":"England / SEPD","Substation":"Upper Heyford Primary","Upstream GSP":"East Claydon GSP","Upstream BSP":"Bicester North BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.52","minimum_observed_gross_demand__mva_":"1.08","contracted_demand_excl_bess__mva_":"5.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"3.09","contracted_generation__mw_":"0.74","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.41","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-28","Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 01","name":"Fawley GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"114.18","technicalLimits":"Yes","rawSource":{"_id":"154","AssetID":"E - FAWL - 01","map___license_area":"England / SEPD","Substation":"Fawley GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"3 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"178.39","minimum_observed_gross_demand__mva_":"20.67","contracted_demand_excl_bess__mva_":"35.76","contracted_bess_demand__mva_":"114.18","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"479.57","contracted_generation__mw_":"297.40","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"17.79","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 02","name":"Cowes BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fawley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"155","AssetID":"E - FAWL - 02","map___license_area":"England / SEPD","Substation":"Cowes BSP","Upstream GSP":"Fawley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 22.5 / 45MVA + 1 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"38.23","minimum_observed_gross_demand__mva_":"6.50","contracted_demand_excl_bess__mva_":"5.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"15.49","contracted_generation__mw_":"15.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.10","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 03","name":"Langley BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fawley GSP","upstreamBsp":"N/A","demand":{"raw":"16.52","value":"16.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"156","AssetID":"E - FAWL - 03","map___license_area":"England / SEPD","Substation":"Langley BSP","Upstream GSP":"Fawley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 22.5 / 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.59","minimum_observed_gross_demand__mva_":"5.36","contracted_demand_excl_bess__mva_":"10.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"7.60","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 04","name":"Wootton Common BSP","area":"England / SEPD","level":"BSP","voltageKv":"133 / 33","upstreamGsp":"Fawley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"157","AssetID":"E - FAWL - 04","map___license_area":"England / SEPD","Substation":"Wootton Common BSP","Upstream GSP":"Fawley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"133 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"68.90","minimum_observed_gross_demand__mva_":"14.98","contracted_demand_excl_bess__mva_":"20.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"77.32","contracted_generation__mw_":"48.34","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.69","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 05","name":"Cowes Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Cowes BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"158","AssetID":"E - FAWL - 05","map___license_area":"England / SEPD","Substation":"Cowes Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Cowes BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.53","minimum_observed_gross_demand__mva_":"5.24","contracted_demand_excl_bess__mva_":"4.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.53","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 06","name":"Freshwater Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Cowes BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"159","AssetID":"E - FAWL - 06","map___license_area":"England / SEPD","Substation":"Freshwater Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Cowes BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.94","minimum_observed_gross_demand__mva_":"1.26","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.39","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 07","name":"Shanklin Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Cowes BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"160","AssetID":"E - FAWL - 07","map___license_area":"England / SEPD","Substation":"Shanklin Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Cowes BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.46","minimum_observed_gross_demand__mva_":"2.55","contracted_demand_excl_bess__mva_":"3.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.66","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 08","name":"Binstead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"161","AssetID":"E - FAWL - 08","map___license_area":"England / SEPD","Substation":"Binstead Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.08","minimum_observed_gross_demand__mva_":"0.85","contracted_demand_excl_bess__mva_":"0.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 09","name":"Newport Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"162","AssetID":"E - FAWL - 09","map___license_area":"England / SEPD","Substation":"Newport Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.39","minimum_observed_gross_demand__mva_":"5.07","contracted_demand_excl_bess__mva_":"7.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.62","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 10","name":"Ryde Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"163","AssetID":"E - FAWL - 10","map___license_area":"England / SEPD","Substation":"Ryde Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.13","minimum_observed_gross_demand__mva_":"3.46","contracted_demand_excl_bess__mva_":"4.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.68","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 11","name":"Sandown Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"164","AssetID":"E - FAWL - 11","map___license_area":"England / SEPD","Substation":"Sandown Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.89","minimum_observed_gross_demand__mva_":"2.61","contracted_demand_excl_bess__mva_":"4.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 12","name":"Shalfleet Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"165","AssetID":"E - FAWL - 12","map___license_area":"England / SEPD","Substation":"Shalfleet Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.03","minimum_observed_gross_demand__mva_":"1.12","contracted_demand_excl_bess__mva_":"0.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.43","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 13","name":"Ventnor Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Wootton Common BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"166","AssetID":"E - FAWL - 13","map___license_area":"England / SEPD","Substation":"Ventnor Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Wootton Common BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.80","minimum_observed_gross_demand__mva_":"1.27","contracted_demand_excl_bess__mva_":"0.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"9.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 14","name":"Butts Ash Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Langley BSP","demand":{"raw":"8.86","value":"8.86","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"167","AssetID":"E - FAWL - 14","map___license_area":"England / SEPD","Substation":"Butts Ash Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Langley BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.23","minimum_observed_gross_demand__mva_":"2.71","contracted_demand_excl_bess__mva_":"1.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.86","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FAWL - 15","name":"Langley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fawley GSP","upstreamBsp":"Langley BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"168","AssetID":"E - FAWL - 15","map___license_area":"England / SEPD","Substation":"Langley Primary","Upstream GSP":"Fawley GSP","Upstream BSP":"Langley BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.90","minimum_observed_gross_demand__mva_":"1.43","contracted_demand_excl_bess__mva_":"7.74","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.20","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 01","name":"Fleet-Bramley GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"226.77","technicalLimits":"Yes","rawSource":{"_id":"169","AssetID":"E - FLEE - 01","map___license_area":"England / SEPD","Substation":"Fleet-Bramley GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"9 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1093.26","minimum_observed_gross_demand__mva_":"462.89","contracted_demand_excl_bess__mva_":"582.78","contracted_bess_demand__mva_":"226.77","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"339.64","contracted_generation__mw_":"751.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"24.92","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-31"}},{"id":"E - FLEE - 02","name":"Aldershot BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"170","AssetID":"E - FLEE - 02","map___license_area":"England / SEPD","Substation":"Aldershot BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"3 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"110.41","minimum_observed_gross_demand__mva_":"26.93","contracted_demand_excl_bess__mva_":"36.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.65","contracted_generation__mw_":"0.40","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"4.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 03","name":"Alton BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"22.91","value":"22.91","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"171","AssetID":"E - FLEE - 03","map___license_area":"England / SEPD","Substation":"Alton BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"66.63","minimum_observed_gross_demand__mva_":"15.81","contracted_demand_excl_bess__mva_":"47.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"22.91","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"48.90","contracted_generation__mw_":"85.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"18.67","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Nov-29","Substation Reinforcement Completion Date":"Feb-29"}},{"id":"E - FLEE - 04","name":"Bracknell BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"63.67","value":"63.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"172","AssetID":"E - FLEE - 04","map___license_area":"England / SEPD","Substation":"Bracknell BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA + 2 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"119.63","minimum_observed_gross_demand__mva_":"34.62","contracted_demand_excl_bess__mva_":"75.82","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"63.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"41.13","contracted_generation__mw_":"1.16","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"22.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 05","name":"Burghfield (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"34.82","value":"34.82","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"173","AssetID":"E - FLEE - 05","map___license_area":"England / SEPD","Substation":"Burghfield (Main) BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"55.54","minimum_observed_gross_demand__mva_":"10.39","contracted_demand_excl_bess__mva_":"44.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"34.82","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"51.68","contracted_generation__mw_":"3.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"15.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 06","name":"Burghfield (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"52.90","value":"52.90","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"5.00","technicalLimits":"Yes","rawSource":{"_id":"174","AssetID":"E - FLEE - 06","map___license_area":"England / SEPD","Substation":"Burghfield (Reserve) BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"51.90","minimum_observed_gross_demand__mva_":"7.48","contracted_demand_excl_bess__mva_":"19.67","contracted_bess_demand__mva_":"5.00","estimated_demand_headroom__mva_":"52.90","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"30.64","contracted_generation__mw_":"39.78","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"14.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 07","name":"Camberley (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"31.73","value":"31.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"175","AssetID":"E - FLEE - 07","map___license_area":"England / SEPD","Substation":"Camberley (Main) BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"73.85","minimum_observed_gross_demand__mva_":"27.60","contracted_demand_excl_bess__mva_":"18.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"31.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.53","contracted_generation__mw_":"0.23","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 08","name":"Camberley (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"42.73","value":"42.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"176","AssetID":"E - FLEE - 08","map___license_area":"England / SEPD","Substation":"Camberley (Reserve) BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"54.78","minimum_observed_gross_demand__mva_":"15.82","contracted_demand_excl_bess__mva_":"32.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"42.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.41","contracted_generation__mw_":"0.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 09","name":"Coxmoor Wood BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"20.48","value":"20.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"10.97","technicalLimits":"Yes","rawSource":{"_id":"177","AssetID":"E - FLEE - 09","map___license_area":"England / SEPD","Substation":"Coxmoor Wood BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"84.17","minimum_observed_gross_demand__mva_":"12.13","contracted_demand_excl_bess__mva_":"23.25","contracted_bess_demand__mva_":"10.97","estimated_demand_headroom__mva_":"20.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"34.09","contracted_generation__mw_":"31.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-31"}},{"id":"E - FLEE - 10","name":"Fernhurst BSP","area":"England / SEPD","level":"BSP","voltageKv":"133 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"18.23","value":"18.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"178","AssetID":"E - FLEE - 10","map___license_area":"England / SEPD","Substation":"Fernhurst BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"133 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"75.66","minimum_observed_gross_demand__mva_":"18.68","contracted_demand_excl_bess__mva_":"41.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"31.29","contracted_generation__mw_":"48.26","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Nov-29","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 11","name":"Maidenhead BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"23.18","value":"23.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"179","AssetID":"E - FLEE - 11","map___license_area":"England / SEPD","Substation":"Maidenhead BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"70.89","minimum_observed_gross_demand__mva_":"17.96","contracted_demand_excl_bess__mva_":"37.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"23.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"18.50","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"12.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 12","name":"Pyestock BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"35.76","value":"35.76","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"180","AssetID":"E - FLEE - 12","map___license_area":"England / SEPD","Substation":"Pyestock BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"32.62","minimum_observed_gross_demand__mva_":"6.77","contracted_demand_excl_bess__mva_":"77.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"35.76","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"30.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.57","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 13","name":"Reading BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"181","AssetID":"E - FLEE - 13","map___license_area":"England / SEPD","Substation":"Reading BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA + 1 x 55 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"123.57","minimum_observed_gross_demand__mva_":"42.56","contracted_demand_excl_bess__mva_":"66.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"15.69","contracted_generation__mw_":"51.80","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"25.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-26"}},{"id":"E - FLEE - 14","name":"Reading Town BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"52.74","value":"52.74","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"182","AssetID":"E - FLEE - 14","map___license_area":"England / SEPD","Substation":"Reading Town BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"52.70","minimum_observed_gross_demand__mva_":"15.49","contracted_demand_excl_bess__mva_":"19.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"52.74","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 15","name":"Wokingham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"N/A","demand":{"raw":"83.66","value":"83.66","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"183","AssetID":"E - FLEE - 15","map___license_area":"England / SEPD","Substation":"Wokingham BSP","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.30","minimum_observed_gross_demand__mva_":"6.89","contracted_demand_excl_bess__mva_":"12.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"83.66","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.13","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.37","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 16","name":"Aldershot Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"184","AssetID":"E - FLEE - 16","map___license_area":"England / SEPD","Substation":"Aldershot Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.93","minimum_observed_gross_demand__mva_":"2.44","contracted_demand_excl_bess__mva_":"2.96","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.28","contracted_generation__mw_":"0.12","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 17","name":"Farnham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"185","AssetID":"E - FLEE - 17","map___license_area":"England / SEPD","Substation":"Farnham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.78","minimum_observed_gross_demand__mva_":"4.03","contracted_demand_excl_bess__mva_":"7.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-26","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 18","name":"Godalming Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"186","AssetID":"E - FLEE - 18","map___license_area":"England / SEPD","Substation":"Godalming Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.82","minimum_observed_gross_demand__mva_":"4.21","contracted_demand_excl_bess__mva_":"3.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 19","name":"Hindhead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"187","AssetID":"E - FLEE - 19","map___license_area":"England / SEPD","Substation":"Hindhead Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.76","minimum_observed_gross_demand__mva_":"2.96","contracted_demand_excl_bess__mva_":"2.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"4.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 20","name":"Laburnum Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"188","AssetID":"E - FLEE - 20","map___license_area":"England / SEPD","Substation":"Laburnum Road Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.04","minimum_observed_gross_demand__mva_":"4.40","contracted_demand_excl_bess__mva_":"9.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 21","name":"Milford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"189","AssetID":"E - FLEE - 21","map___license_area":"England / SEPD","Substation":"Milford Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.78","minimum_observed_gross_demand__mva_":"3.71","contracted_demand_excl_bess__mva_":"4.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"4.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 22","name":"Normandy Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"190","AssetID":"E - FLEE - 22","map___license_area":"England / SEPD","Substation":"Normandy Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.25MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.14","minimum_observed_gross_demand__mva_":"0.31","contracted_demand_excl_bess__mva_":"1.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"2.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 23","name":"Tongham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Aldershot BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"191","AssetID":"E - FLEE - 23","map___license_area":"England / SEPD","Substation":"Tongham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Aldershot BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.73","minimum_observed_gross_demand__mva_":"3.37","contracted_demand_excl_bess__mva_":"2.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.24","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"7.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 24","name":"Alresford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Alton BSP","demand":{"raw":"0.30","value":"0.30","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"192","AssetID":"E - FLEE - 24","map___license_area":"England / SEPD","Substation":"Alresford Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Alton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.72","minimum_observed_gross_demand__mva_":"2.88","contracted_demand_excl_bess__mva_":"2.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.30","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"4.77","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.75","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - FLEE - 25","name":"Alton Local Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Alton BSP","demand":{"raw":"18.47","value":"18.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"193","AssetID":"E - FLEE - 25","map___license_area":"England / SEPD","Substation":"Alton Local Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Alton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.07","minimum_observed_gross_demand__mva_":"5.23","contracted_demand_excl_bess__mva_":"6.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.40","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.93","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 26","name":"Bordon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Alton BSP","demand":{"raw":"1.14","value":"1.14","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"194","AssetID":"E - FLEE - 26","map___license_area":"England / SEPD","Substation":"Bordon Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Alton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 X 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.55","minimum_observed_gross_demand__mva_":"3.07","contracted_demand_excl_bess__mva_":"7.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.14","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 27","name":"Herriard Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Alton BSP","demand":{"raw":"2.36","value":"2.36","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"195","AssetID":"E - FLEE - 27","map___license_area":"England / SEPD","Substation":"Herriard Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Alton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5MVA + 1 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.09","minimum_observed_gross_demand__mva_":"0.73","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.36","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"6.65","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"5.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 28","name":"Five Oaks Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"2.64","value":"2.64","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"196","AssetID":"E - FLEE - 28","map___license_area":"England / SEPD","Substation":"Five Oaks Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.30","minimum_observed_gross_demand__mva_":"1.34","contracted_demand_excl_bess__mva_":"3.82","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.64","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 29","name":"Haslemere Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"7.54","value":"7.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"197","AssetID":"E - FLEE - 29","map___license_area":"England / SEPD","Substation":"Haslemere Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.49","minimum_observed_gross_demand__mva_":"2.72","contracted_demand_excl_bess__mva_":"3.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.11","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 30","name":"Haslingborne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"5.97","value":"5.97","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"198","AssetID":"E - FLEE - 30","map___license_area":"England / SEPD","Substation":"Haslingborne Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.48","minimum_observed_gross_demand__mva_":"1.44","contracted_demand_excl_bess__mva_":"0.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.97","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-26"}},{"id":"E - FLEE - 31","name":"Langley Court Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"7.16","value":"7.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"199","AssetID":"E - FLEE - 31","map___license_area":"England / SEPD","Substation":"Langley Court Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.87","minimum_observed_gross_demand__mva_":"2.24","contracted_demand_excl_bess__mva_":"8.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 32","name":"Midhurst Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"15.30","value":"15.30","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"200","AssetID":"E - FLEE - 32","map___license_area":"England / SEPD","Substation":"Midhurst Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.48","minimum_observed_gross_demand__mva_":"3.14","contracted_demand_excl_bess__mva_":"2.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.30","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"2.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 33","name":"Petersfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"4.25","value":"4.25","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"201","AssetID":"E - FLEE - 33","map___license_area":"England / SEPD","Substation":"Petersfield Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.01","minimum_observed_gross_demand__mva_":"4.23","contracted_demand_excl_bess__mva_":"8.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.25","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 34","name":"Plaistow Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"1.86","value":"1.86","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"202","AssetID":"E - FLEE - 34","map___license_area":"England / SEPD","Substation":"Plaistow Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.02","minimum_observed_gross_demand__mva_":"0.80","contracted_demand_excl_bess__mva_":"15.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.86","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"4.75","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Apr-28"}},{"id":"E - FLEE - 35","name":"Preston Candover Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Fernhurst BSP","demand":{"raw":"3.82","value":"3.82","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"203","AssetID":"E - FLEE - 35","map___license_area":"England / SEPD","Substation":"Preston Candover Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Fernhurst BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.57","minimum_observed_gross_demand__mva_":"0.93","contracted_demand_excl_bess__mva_":"9.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.82","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.37","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 36","name":"Ascot Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"17.79","value":"17.79","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"204","AssetID":"E - FLEE - 36","map___license_area":"England / SEPD","Substation":"Ascot Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.13","minimum_observed_gross_demand__mva_":"4.62","contracted_demand_excl_bess__mva_":"2.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"17.79","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 37","name":"Bagshot Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"7.48","value":"7.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"205","AssetID":"E - FLEE - 37","map___license_area":"England / SEPD","Substation":"Bagshot Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.79","minimum_observed_gross_demand__mva_":"2.51","contracted_demand_excl_bess__mva_":"5.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 38","name":"Bracknell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"31.36","value":"31.36","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"206","AssetID":"E - FLEE - 38","map___license_area":"England / SEPD","Substation":"Bracknell Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.08","minimum_observed_gross_demand__mva_":"9.28","contracted_demand_excl_bess__mva_":"15.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"31.36","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.11","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"17.75","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 39","name":"Chobham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"207","AssetID":"E - FLEE - 39","map___license_area":"England / SEPD","Substation":"Chobham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 11MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.43","minimum_observed_gross_demand__mva_":"2.94","contracted_demand_excl_bess__mva_":"4.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-26"}},{"id":"E - FLEE - 40","name":"Easthampstead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"9.03","value":"9.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"208","AssetID":"E - FLEE - 40","map___license_area":"England / SEPD","Substation":"Easthampstead Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.95","minimum_observed_gross_demand__mva_":"3.37","contracted_demand_excl_bess__mva_":"3.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 41","name":"MVEE Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"18.01","value":"18.01","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"209","AssetID":"E - FLEE - 41","map___license_area":"England / SEPD","Substation":"MVEE Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.59","minimum_observed_gross_demand__mva_":"1.01","contracted_demand_excl_bess__mva_":"4.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.01","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"3.04","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 42","name":"Sunninghill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 6.6","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"11.96","value":"11.96","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"210","AssetID":"E - FLEE - 42","map___license_area":"England / SEPD","Substation":"Sunninghill Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 6.6","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.84","minimum_observed_gross_demand__mva_":"2.42","contracted_demand_excl_bess__mva_":"1.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.96","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 43","name":"Warfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Bracknell BSP","demand":{"raw":"5.75","value":"5.75","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"211","AssetID":"E - FLEE - 43","map___license_area":"England / SEPD","Substation":"Warfield Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Bracknell BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.25","minimum_observed_gross_demand__mva_":"4.81","contracted_demand_excl_bess__mva_":"3.96","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.75","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 44","name":"Courages Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Main) BSP","demand":{"raw":"6.39","value":"6.39","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"212","AssetID":"E - FLEE - 44","map___license_area":"England / SEPD","Substation":"Courages Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.27","minimum_observed_gross_demand__mva_":"5.39","contracted_demand_excl_bess__mva_":"12.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.39","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"4.28","contracted_generation__mw_":"2.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 45","name":"Green Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Main) BSP","demand":{"raw":"9.08","value":"9.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"213","AssetID":"E - FLEE - 45","map___license_area":"England / SEPD","Substation":"Green Park Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.22","minimum_observed_gross_demand__mva_":"2.81","contracted_demand_excl_bess__mva_":"23.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 46","name":"Kentwood Hill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Main) BSP","demand":{"raw":"7.90","value":"7.90","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"214","AssetID":"E - FLEE - 46","map___license_area":"England / SEPD","Substation":"Kentwood Hill Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 28MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.04","minimum_observed_gross_demand__mva_":"3.77","contracted_demand_excl_bess__mva_":"0.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.90","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"11.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 47","name":"Whitley Wood Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Main) BSP","demand":{"raw":"20.57","value":"20.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"215","AssetID":"E - FLEE - 47","map___license_area":"England / SEPD","Substation":"Whitley Wood Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.73","minimum_observed_gross_demand__mva_":"3.73","contracted_demand_excl_bess__mva_":"4.88","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"20.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 48","name":"Wilson Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Main) BSP","demand":{"raw":"12.48","value":"12.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"216","AssetID":"E - FLEE - 48","map___license_area":"England / SEPD","Substation":"Wilson Road Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.71","minimum_observed_gross_demand__mva_":"3.19","contracted_demand_excl_bess__mva_":"2.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 49","name":"Goring Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"9.99","value":"9.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"217","AssetID":"E - FLEE - 49","map___license_area":"England / SEPD","Substation":"Goring Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.20","minimum_observed_gross_demand__mva_":"1.24","contracted_demand_excl_bess__mva_":"0.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"6.76","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 50","name":"Mortimer Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"4.73","value":"4.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"218","AssetID":"E - FLEE - 50","map___license_area":"England / SEPD","Substation":"Mortimer Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.01","minimum_observed_gross_demand__mva_":"1.27","contracted_demand_excl_bess__mva_":"2.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 51","name":"Padworth Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"3.80","value":"3.80","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"219","AssetID":"E - FLEE - 51","map___license_area":"England / SEPD","Substation":"Padworth Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 10.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.22","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"0.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.80","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 52","name":"Pangbourne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"18.16","value":"18.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"220","AssetID":"E - FLEE - 52","map___license_area":"England / SEPD","Substation":"Pangbourne Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.54","minimum_observed_gross_demand__mva_":"2.04","contracted_demand_excl_bess__mva_":"1.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 53","name":"Trash Green Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"221","AssetID":"E - FLEE - 53","map___license_area":"England / SEPD","Substation":"Trash Green Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.07","minimum_observed_gross_demand__mva_":"2.07","contracted_demand_excl_bess__mva_":"3.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.79","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"8.53","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 54","name":"Woodcote Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"4.72","value":"4.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"222","AssetID":"E - FLEE - 54","map___license_area":"England / SEPD","Substation":"Woodcote Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5MVA + 1 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.04","minimum_observed_gross_demand__mva_":"0.89","contracted_demand_excl_bess__mva_":"1.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.78","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"3.99","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 55","name":"Southcote Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"7.57","value":"7.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"5.00","technicalLimits":"Yes","rawSource":{"_id":"223","AssetID":"E - FLEE - 55","map___license_area":"England / SEPD","Substation":"Southcote Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.58","minimum_observed_gross_demand__mva_":"1.60","contracted_demand_excl_bess__mva_":"5.59","contracted_bess_demand__mva_":"5.00","estimated_demand_headroom__mva_":"7.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"5.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"11.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 56","name":"Theale Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Burghfield (Reserve) BSP","demand":{"raw":"12.30","value":"12.30","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"224","AssetID":"E - FLEE - 56","map___license_area":"England / SEPD","Substation":"Theale Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Burghfield (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.08","minimum_observed_gross_demand__mva_":"1.86","contracted_demand_excl_bess__mva_":"5.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.30","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.24","contracted_generation__mw_":"2.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 57","name":"Camberley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Main) BSP","demand":{"raw":"31.73","value":"31.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"225","AssetID":"E - FLEE - 57","map___license_area":"England / SEPD","Substation":"Camberley Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.48","minimum_observed_gross_demand__mva_":"8.93","contracted_demand_excl_bess__mva_":"11.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"31.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 58","name":"Crowthorne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Main) BSP","demand":{"raw":"6.17","value":"6.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"226","AssetID":"E - FLEE - 58","map___license_area":"England / SEPD","Substation":"Crowthorne Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA + 1 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.83","minimum_observed_gross_demand__mva_":"3.00","contracted_demand_excl_bess__mva_":"2.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.23","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 59","name":"Kings Ride Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Main) BSP","demand":{"raw":"10.28","value":"10.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"227","AssetID":"E - FLEE - 59","map___license_area":"England / SEPD","Substation":"Kings Ride Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 24.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.87","minimum_observed_gross_demand__mva_":"2.88","contracted_demand_excl_bess__mva_":"1.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 60","name":"Sandhurst Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Main) BSP","demand":{"raw":"6.46","value":"6.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"228","AssetID":"E - FLEE - 60","map___license_area":"England / SEPD","Substation":"Sandhurst Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.01","minimum_observed_gross_demand__mva_":"3.99","contracted_demand_excl_bess__mva_":"2.63","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.53","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 61","name":"Cove Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Reserve) BSP","demand":{"raw":"10.75","value":"10.75","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"229","AssetID":"E - FLEE - 61","map___license_area":"England / SEPD","Substation":"Cove Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.67","minimum_observed_gross_demand__mva_":"2.21","contracted_demand_excl_bess__mva_":"3.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.75","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 62","name":"Farnborough Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Reserve) BSP","demand":{"raw":"9.54","value":"9.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"230","AssetID":"E - FLEE - 62","map___license_area":"England / SEPD","Substation":"Farnborough Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.06","minimum_observed_gross_demand__mva_":"2.87","contracted_demand_excl_bess__mva_":"7.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 63","name":"Frimley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"231","AssetID":"E - FLEE - 63","map___license_area":"England / SEPD","Substation":"Frimley Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.30","minimum_observed_gross_demand__mva_":"4.38","contracted_demand_excl_bess__mva_":"16.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.41","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"9.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 64","name":"Hawley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Reserve) BSP","demand":{"raw":"17.31","value":"17.31","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"232","AssetID":"E - FLEE - 64","map___license_area":"England / SEPD","Substation":"Hawley Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.11","minimum_observed_gross_demand__mva_":"1.74","contracted_demand_excl_bess__mva_":"1.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"17.31","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 65","name":"Queensmead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Camberley (Reserve) BSP","demand":{"raw":"3.55","value":"3.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"233","AssetID":"E - FLEE - 65","map___license_area":"England / SEPD","Substation":"Queensmead Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Camberley (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.16","minimum_observed_gross_demand__mva_":"1.60","contracted_demand_excl_bess__mva_":"4.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.42","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 66","name":"Coxmoor Wood Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Coxmoor Wood BSP","demand":{"raw":"7.72","value":"7.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"234","AssetID":"E - FLEE - 66","map___license_area":"England / SEPD","Substation":"Coxmoor Wood Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Coxmoor Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 10 / 14MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"9.95","minimum_observed_gross_demand__mva_":"1.50","contracted_demand_excl_bess__mva_":"1.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.06","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"6.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 67","name":"Crookham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Coxmoor Wood BSP","demand":{"raw":"19.19","value":"19.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"235","AssetID":"E - FLEE - 67","map___license_area":"England / SEPD","Substation":"Crookham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Coxmoor Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.74","minimum_observed_gross_demand__mva_":"1.46","contracted_demand_excl_bess__mva_":"0.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"19.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 68","name":"Hitches Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Coxmoor Wood BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"236","AssetID":"E - FLEE - 68","map___license_area":"England / SEPD","Substation":"Hitches Lane Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Coxmoor Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.85","minimum_observed_gross_demand__mva_":"5.60","contracted_demand_excl_bess__mva_":"9.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"4.05","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 69","name":"Hook Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Coxmoor Wood BSP","demand":{"raw":"11.03","value":"11.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"237","AssetID":"E - FLEE - 69","map___license_area":"England / SEPD","Substation":"Hook Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Coxmoor Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.44","minimum_observed_gross_demand__mva_":"2.67","contracted_demand_excl_bess__mva_":"6.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 70","name":"Wrecclesham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Coxmoor Wood BSP","demand":{"raw":"18.06","value":"18.06","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"238","AssetID":"E - FLEE - 70","map___license_area":"England / SEPD","Substation":"Wrecclesham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Coxmoor Wood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.12","minimum_observed_gross_demand__mva_":"2.45","contracted_demand_excl_bess__mva_":"2.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.06","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-26","Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 71","name":"Braywick Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Maidenhead BSP","demand":{"raw":"7.51","value":"7.51","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"239","AssetID":"E - FLEE - 71","map___license_area":"England / SEPD","Substation":"Braywick Road Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Maidenhead BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.62","minimum_observed_gross_demand__mva_":"4.16","contracted_demand_excl_bess__mva_":"6.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.51","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 72","name":"Cordwallis Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Maidenhead BSP","demand":{"raw":"6.48","value":"6.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"240","AssetID":"E - FLEE - 72","map___license_area":"England / SEPD","Substation":"Cordwallis Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Maidenhead BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.64","minimum_observed_gross_demand__mva_":"6.00","contracted_demand_excl_bess__mva_":"7.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 73","name":"Knowl Hill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Maidenhead BSP","demand":{"raw":"4.63","value":"4.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"241","AssetID":"E - FLEE - 73","map___license_area":"England / SEPD","Substation":"Knowl Hill Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Maidenhead BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.37","minimum_observed_gross_demand__mva_":"0.72","contracted_demand_excl_bess__mva_":"0.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.65","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 74","name":"Maidenhead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Maidenhead BSP","demand":{"raw":"18.38","value":"18.38","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"242","AssetID":"E - FLEE - 74","map___license_area":"England / SEPD","Substation":"Maidenhead Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Maidenhead BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 18.7MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.20","minimum_observed_gross_demand__mva_":"6.41","contracted_demand_excl_bess__mva_":"12.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.38","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 75","name":"Temple Farm Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Maidenhead BSP","demand":{"raw":"1.89","value":"1.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"243","AssetID":"E - FLEE - 75","map___license_area":"England / SEPD","Substation":"Temple Farm Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Maidenhead BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.88","minimum_observed_gross_demand__mva_":"0.72","contracted_demand_excl_bess__mva_":"0.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 76","name":"Farnboro Airfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Pyestock BSP","demand":{"raw":"7.56","value":"7.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"244","AssetID":"E - FLEE - 76","map___license_area":"England / SEPD","Substation":"Farnboro Airfield Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Pyestock BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.65","minimum_observed_gross_demand__mva_":"2.78","contracted_demand_excl_bess__mva_":"2.82","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 77","name":"Pyestock Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Pyestock BSP","demand":{"raw":"10.32","value":"10.32","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"245","AssetID":"E - FLEE - 77","map___license_area":"England / SEPD","Substation":"Pyestock Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Pyestock BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.70","minimum_observed_gross_demand__mva_":"1.29","contracted_demand_excl_bess__mva_":"11.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.32","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"9.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 78","name":"Henley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"246","AssetID":"E - FLEE - 78","map___license_area":"England / SEPD","Substation":"Henley Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.84","minimum_observed_gross_demand__mva_":"3.71","contracted_demand_excl_bess__mva_":"4.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 79","name":"Kidmore End Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"247","AssetID":"E - FLEE - 79","map___license_area":"England / SEPD","Substation":"Kidmore End Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.53","minimum_observed_gross_demand__mva_":"1.82","contracted_demand_excl_bess__mva_":"0.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 80","name":"Little Hungerford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"248","AssetID":"E - FLEE - 80","map___license_area":"England / SEPD","Substation":"Little Hungerford Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"23.58","minimum_observed_gross_demand__mva_":"6.94","contracted_demand_excl_bess__mva_":"10.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 81","name":"Northumberland Avenue Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"249","AssetID":"E - FLEE - 81","map___license_area":"England / SEPD","Substation":"Northumberland Avenue Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.84","minimum_observed_gross_demand__mva_":"4.15","contracted_demand_excl_bess__mva_":"4.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.30","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 82","name":"Reading Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"250","AssetID":"E - FLEE - 82","map___license_area":"England / SEPD","Substation":"Reading Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"23.84","minimum_observed_gross_demand__mva_":"7.36","contracted_demand_excl_bess__mva_":"18.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"17.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 83","name":"Silver Street Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"251","AssetID":"E - FLEE - 83","map___license_area":"England / SEPD","Substation":"Silver Street Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 28MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.95","minimum_observed_gross_demand__mva_":"3.52","contracted_demand_excl_bess__mva_":"3.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 84","name":"Twyford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"252","AssetID":"E - FLEE - 84","map___license_area":"England / SEPD","Substation":"Twyford Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.74","minimum_observed_gross_demand__mva_":"2.91","contracted_demand_excl_bess__mva_":"0.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 85","name":"Caversham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading Town BSP","demand":{"raw":"16.60","value":"16.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"253","AssetID":"E - FLEE - 85","map___license_area":"England / SEPD","Substation":"Caversham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading Town BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.35","minimum_observed_gross_demand__mva_":"2.06","contracted_demand_excl_bess__mva_":"0.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.61","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 86","name":"Reading Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading Town BSP","demand":{"raw":"52.74","value":"52.74","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"254","AssetID":"E - FLEE - 86","map___license_area":"England / SEPD","Substation":"Reading Town Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading Town BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"4 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.75","minimum_observed_gross_demand__mva_":"7.80","contracted_demand_excl_bess__mva_":"14.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"52.74","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 87","name":"The Mall Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Reading Town BSP","demand":{"raw":"13.15","value":"13.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"255","AssetID":"E - FLEE - 87","map___license_area":"England / SEPD","Substation":"The Mall Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Reading Town BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.48","minimum_observed_gross_demand__mva_":"3.83","contracted_demand_excl_bess__mva_":"4.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 88","name":"Elms Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Wokingham BSP","demand":{"raw":"4.22","value":"4.22","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"256","AssetID":"E - FLEE - 88","map___license_area":"England / SEPD","Substation":"Elms Road Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Wokingham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 24.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.99","minimum_observed_gross_demand__mva_":"4.65","contracted_demand_excl_bess__mva_":"3.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.22","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.33","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 89","name":"Peacock Farm Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Wokingham BSP","demand":{"raw":"5.65","value":"5.65","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"257","AssetID":"E - FLEE - 89","map___license_area":"England / SEPD","Substation":"Peacock Farm Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Wokingham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.03","minimum_observed_gross_demand__mva_":"1.24","contracted_demand_excl_bess__mva_":"6.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.65","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.99","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - FLEE - 90","name":"Wokingham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fleet-Bramley GSP","upstreamBsp":"Wokingham BSP","demand":{"raw":"18.48","value":"18.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"258","AssetID":"E - FLEE - 90","map___license_area":"England / SEPD","Substation":"Wokingham Primary","Upstream GSP":"Fleet-Bramley GSP","Upstream BSP":"Wokingham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.94","minimum_observed_gross_demand__mva_":"2.20","contracted_demand_excl_bess__mva_":"1.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.67","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVEE - 01","name":"Iver 66kV GSP","area":"England / SEPD","level":"GSP","voltageKv":"275 / 66","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"259","AssetID":"E - IVEE - 01","map___license_area":"England / SEPD","Substation":"Iver 66kV GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 66","Transformer Nameplate Ratings":"2 x 120MVA + 2 x 180MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"157.33","minimum_observed_gross_demand__mva_":"57.50","contracted_demand_excl_bess__mva_":"176.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.09","contracted_generation__mw_":"0.88","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"20.92","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVEE - 02","name":"Hillingdon Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Iver 66kV GSP","upstreamBsp":"N/A","demand":{"raw":"8.98","value":"8.98","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"44.16","value":"44.16","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"260","AssetID":"E - IVEE - 02","map___license_area":"England / SEPD","Substation":"Hillingdon Primary","Upstream GSP":"Iver 66kV GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.63","minimum_observed_gross_demand__mva_":"8.87","contracted_demand_excl_bess__mva_":"4.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.98","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"44.16","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"25.49","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVEE - 03","name":"Northolt Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Iver 66kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"41.68","value":"41.68","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"261","AssetID":"E - IVEE - 03","map___license_area":"England / SEPD","Substation":"Northolt Primary","Upstream GSP":"Iver 66kV GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.93","minimum_observed_gross_demand__mva_":"6.02","contracted_demand_excl_bess__mva_":"14.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.53","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"41.68","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.00","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-26"}},{"id":"E - IVEE - 04","name":"Uxbridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Iver 66kV GSP","upstreamBsp":"N/A","demand":{"raw":"10.17","value":"10.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"60.49","value":"60.49","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"262","AssetID":"E - IVEE - 04","map___license_area":"England / SEPD","Substation":"Uxbridge Primary","Upstream GSP":"Iver 66kV GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 20 / 28MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"36.49","minimum_observed_gross_demand__mva_":"7.29","contracted_demand_excl_bess__mva_":"32.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"60.49","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.70","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - IVEE - 05","name":"Yiewsley Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Iver 66kV GSP","upstreamBsp":"N/A","demand":{"raw":"18.96","value":"18.96","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"66.49","value":"66.49","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"263","AssetID":"E - IVEE - 05","map___license_area":"England / SEPD","Substation":"Yiewsley Primary","Upstream GSP":"Iver 66kV GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"28.46","minimum_observed_gross_demand__mva_":"9.84","contracted_demand_excl_bess__mva_":"18.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.96","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.35","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"66.49","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.72","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 01","name":"Iver 132kV GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"206.21","technicalLimits":"No","rawSource":{"_id":"264","AssetID":"E - IVES - 01","map___license_area":"England / SEPD","Substation":"Iver 132kV GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"4 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"525.76","minimum_observed_gross_demand__mva_":"236.44","contracted_demand_excl_bess__mva_":"471.18","contracted_bess_demand__mva_":"206.21","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"157.02","contracted_generation__mw_":"358.96","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"20.53","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":"Jun-30"}},{"id":"E - IVES - 02","name":"Chalvey BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"88.03","value":"88.03","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"265","AssetID":"E - IVES - 02","map___license_area":"England / SEPD","Substation":"Chalvey BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"53.54","minimum_observed_gross_demand__mva_":"10.23","contracted_demand_excl_bess__mva_":"45.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.74","contracted_generation__mw_":"3.96","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"88.03","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.63","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 03","name":"Cippenham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"95.67","value":"95.67","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"266","AssetID":"E - IVES - 03","map___license_area":"England / SEPD","Substation":"Cippenham BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"42.90","minimum_observed_gross_demand__mva_":"11.12","contracted_demand_excl_bess__mva_":"22.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"95.67","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"12.66","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 04","name":"Denham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 22","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"26.43","value":"26.43","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"267","AssetID":"E - IVES - 04","map___license_area":"England / SEPD","Substation":"Denham BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 22","Transformer Nameplate Ratings":"3 x 22.5 / 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"60.13","minimum_observed_gross_demand__mva_":"8.66","contracted_demand_excl_bess__mva_":"11.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"29.69","contracted_generation__mw_":"38.04","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"26.43","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.42","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":"Mar-29"}},{"id":"E - IVES - 05","name":"Longford BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"48.38","value":"48.38","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"3.79","technicalLimits":"No","rawSource":{"_id":"268","AssetID":"E - IVES - 05","map___license_area":"England / SEPD","Substation":"Longford BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"59.08","minimum_observed_gross_demand__mva_":"8.51","contracted_demand_excl_bess__mva_":"19.07","contracted_bess_demand__mva_":"3.79","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"43.73","contracted_generation__mw_":"1.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"48.38","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.68","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 06","name":"Slough BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"125.79","value":"125.79","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"269","AssetID":"E - IVES - 06","map___license_area":"England / SEPD","Substation":"Slough BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"108.34","minimum_observed_gross_demand__mva_":"45.04","contracted_demand_excl_bess__mva_":"94.82","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"4.75","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"125.79","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.16","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - IVES - 07","name":"Upton BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 22","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"60.08","value":"60.08","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"270","AssetID":"E - IVES - 07","map___license_area":"England / SEPD","Substation":"Upton BSP","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 22","Transformer Nameplate Ratings":"2 x 40 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"36.11","minimum_observed_gross_demand__mva_":"11.63","contracted_demand_excl_bess__mva_":"6.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"8.55","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"60.08","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.72","Substation Generation RAG Status":"Amber","Generation Constraint":"Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 08","name":"Chalvey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Chalvey BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"84.24","value":"84.24","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"271","AssetID":"E - IVES - 08","map___license_area":"England / SEPD","Substation":"Chalvey Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Chalvey BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"34.67","minimum_observed_gross_demand__mva_":"8.81","contracted_demand_excl_bess__mva_":"10.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"84.24","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.83","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 09","name":"Petersfield Avenue Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Chalvey BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"53.26","value":"53.26","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"272","AssetID":"E - IVES - 09","map___license_area":"England / SEPD","Substation":"Petersfield Avenue Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Chalvey BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 17 / 21MVA + 2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.99","minimum_observed_gross_demand__mva_":"4.87","contracted_demand_excl_bess__mva_":"13.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"53.26","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.23","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 10","name":"Clarence Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Cippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"43.77","value":"43.77","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"273","AssetID":"E - IVES - 10","map___license_area":"England / SEPD","Substation":"Clarence Road Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Cippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 17 / 21.5MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.36","minimum_observed_gross_demand__mva_":"8.52","contracted_demand_excl_bess__mva_":"12.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"43.77","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.86","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 11","name":"Beaconsfield (Middle Busbars) Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"12.36","value":"12.36","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"274","AssetID":"E - IVES - 11","map___license_area":"England / SEPD","Substation":"Beaconsfield (Middle Busbars) Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.89","minimum_observed_gross_demand__mva_":"2.91","contracted_demand_excl_bess__mva_":"3.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.04","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"12.36","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.37","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - IVES - 12","name":"Cokes Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"13.22","value":"13.22","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"275","AssetID":"E - IVES - 12","map___license_area":"England / SEPD","Substation":"Cokes Lane Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.65","minimum_observed_gross_demand__mva_":"1.35","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"13.22","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.06","Substation Generation RAG Status":"Amber","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 13","name":"Denham Avenue Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"12.37","value":"12.37","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"276","AssetID":"E - IVES - 13","map___license_area":"England / SEPD","Substation":"Denham Avenue Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.91","minimum_observed_gross_demand__mva_":"2.87","contracted_demand_excl_bess__mva_":"3.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"12.37","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.82","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 14","name":"Gerrards Cross Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"15.42","value":"15.42","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"277","AssetID":"E - IVES - 14","map___license_area":"England / SEPD","Substation":"Gerrards Cross Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.77","minimum_observed_gross_demand__mva_":"3.55","contracted_demand_excl_bess__mva_":"1.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"15.42","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.81","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 15","name":"Grassingham Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"16.66","value":"16.66","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"278","AssetID":"E - IVES - 15","map___license_area":"England / SEPD","Substation":"Grassingham Road Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"3 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.49","minimum_observed_gross_demand__mva_":"3.04","contracted_demand_excl_bess__mva_":"1.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.05","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"16.66","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.32","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 16","name":"Harefield Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Denham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"14.91","value":"14.91","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"279","AssetID":"E - IVES - 16","map___license_area":"England / SEPD","Substation":"Harefield Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Denham BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.31","minimum_observed_gross_demand__mva_":"1.34","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"14.91","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.47","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 17","name":"Bath Road West Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Longford BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"21.52","value":"21.52","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"3.79","technicalLimits":"No","rawSource":{"_id":"280","AssetID":"E - IVES - 17","map___license_area":"England / SEPD","Substation":"Bath Road West Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Longford BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.00","minimum_observed_gross_demand__mva_":"5.50","contracted_demand_excl_bess__mva_":"8.14","contracted_bess_demand__mva_":"3.79","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.31","contracted_generation__mw_":"1.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"21.52","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.52","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 18","name":"Poyle Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Longford BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"33.50","value":"33.50","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"281","AssetID":"E - IVES - 18","map___license_area":"England / SEPD","Substation":"Poyle Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Longford BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.72","minimum_observed_gross_demand__mva_":"5.00","contracted_demand_excl_bess__mva_":"7.93","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"33.50","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.94","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 19","name":"Farnham Royal Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Slough BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"39.69","value":"39.69","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"282","AssetID":"E - IVES - 19","map___license_area":"England / SEPD","Substation":"Farnham Royal Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Slough BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA + 2 x 17 / 19.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.24","minimum_observed_gross_demand__mva_":"3.49","contracted_demand_excl_bess__mva_":"8.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"39.69","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.85","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 20","name":"Taplow Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Slough BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"32.26","value":"32.26","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"283","AssetID":"E - IVES - 20","map___license_area":"England / SEPD","Substation":"Taplow Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Slough BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.16","minimum_observed_gross_demand__mva_":"3.76","contracted_demand_excl_bess__mva_":"0.88","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"32.26","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.71","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 21","name":"Beaconsfield (End Busbars) Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Upton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"6.88","value":"6.88","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"284","AssetID":"E - IVES - 21","map___license_area":"England / SEPD","Substation":"Beaconsfield (End Busbars) Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Upton BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.47","minimum_observed_gross_demand__mva_":"1.18","contracted_demand_excl_bess__mva_":"0.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"6.88","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.78","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - IVES - 22","name":"Sutton Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Upton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"22.11","value":"22.11","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"285","AssetID":"E - IVES - 22","map___license_area":"England / SEPD","Substation":"Sutton Lane Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Upton BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.89","minimum_observed_gross_demand__mva_":"3.33","contracted_demand_excl_bess__mva_":"1.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.85","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"22.11","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.93","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - IVES - 23","name":"Upton Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Iver 132kV GSP","upstreamBsp":"Upton BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"28.32","value":"28.32","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"286","AssetID":"E - IVES - 23","map___license_area":"England / SEPD","Substation":"Upton Primary","Upstream GSP":"Iver 132kV GSP","Upstream BSP":"Upton BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"3 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.04","minimum_observed_gross_demand__mva_":"4.71","contracted_demand_excl_bess__mva_":"4.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.62","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"28.32","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.67","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 01","name":"Laleham GSP","area":"England / SEPD","level":"GSP","voltageKv":"275 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"463.16","technicalLimits":"Yes","rawSource":{"_id":"287","AssetID":"E - LALE - 01","map___license_area":"England / SEPD","Substation":"Laleham GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 132","Transformer Nameplate Ratings":"4 x 240MVA (Shared with UKPN)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"273.01","minimum_observed_gross_demand__mva_":"109.18","contracted_demand_excl_bess__mva_":"141.52","contracted_bess_demand__mva_":"463.16","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"16.61","contracted_generation__mw_":"551.74","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"15.93","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 02","name":"East Bedfont BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 22","upstreamGsp":"Laleham GSP","upstreamBsp":"N/A","demand":{"raw":"8.72","value":"8.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"288","AssetID":"E - LALE - 02","map___license_area":"England / SEPD","Substation":"East Bedfont BSP","Upstream GSP":"Laleham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 22","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"51.94","minimum_observed_gross_demand__mva_":"21.56","contracted_demand_excl_bess__mva_":"28.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"4.88","contracted_generation__mw_":"1.70","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - LALE - 03","name":"Staines BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Laleham GSP","upstreamBsp":"N/A","demand":{"raw":"37.23","value":"37.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"52.63","technicalLimits":"Yes","rawSource":{"_id":"289","AssetID":"E - LALE - 03","map___license_area":"England / SEPD","Substation":"Staines BSP","Upstream GSP":"Laleham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"114.96","minimum_observed_gross_demand__mva_":"35.35","contracted_demand_excl_bess__mva_":"35.42","contracted_bess_demand__mva_":"52.63","estimated_demand_headroom__mva_":"37.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"11.33","contracted_generation__mw_":"100.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"15.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-32","Substation Reinforcement Completion Date":"Mar-32"}},{"id":"E - LALE - 04","name":"East Bedfont Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"290","AssetID":"E - LALE - 04","map___license_area":"England / SEPD","Substation":"East Bedfont Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.03","minimum_observed_gross_demand__mva_":"4.92","contracted_demand_excl_bess__mva_":"17.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.40","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-26"}},{"id":"E - LALE - 05","name":"Church Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"East Bedfont BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"291","AssetID":"E - LALE - 05","map___license_area":"England / SEPD","Substation":"Church Road Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"East Bedfont BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.96","minimum_observed_gross_demand__mva_":"2.26","contracted_demand_excl_bess__mva_":"1.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 06","name":"Feltham Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Laleham GSP","upstreamBsp":"East Bedfont BSP","demand":{"raw":"8.72","value":"8.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"292","AssetID":"E - LALE - 06","map___license_area":"England / SEPD","Substation":"Feltham Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"East Bedfont BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"3 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.95","minimum_observed_gross_demand__mva_":"2.60","contracted_demand_excl_bess__mva_":"2.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.36","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 07","name":"Hope And Anchor Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Laleham GSP","upstreamBsp":"East Bedfont BSP","demand":{"raw":"4.24","value":"4.24","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"293","AssetID":"E - LALE - 07","map___license_area":"England / SEPD","Substation":"Hope And Anchor Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"East Bedfont BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.57","minimum_observed_gross_demand__mva_":"0.52","contracted_demand_excl_bess__mva_":"0.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.24","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.89","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 08","name":"North Feltham Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"East Bedfont BSP","demand":{"raw":"0.50","value":"0.50","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"294","AssetID":"E - LALE - 08","map___license_area":"England / SEPD","Substation":"North Feltham Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"East Bedfont BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"2 x 10 / 11.5MVA + 1 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.64","minimum_observed_gross_demand__mva_":"6.92","contracted_demand_excl_bess__mva_":"6.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.50","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 09","name":"Causeway Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"Staines BSP","demand":{"raw":"24.63","value":"24.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"295","AssetID":"E - LALE - 09","map___license_area":"England / SEPD","Substation":"Causeway Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"Staines BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.95","minimum_observed_gross_demand__mva_":"5.53","contracted_demand_excl_bess__mva_":"6.54","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"24.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"5.93","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"21.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 10","name":"Egham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"Staines BSP","demand":{"raw":"5.50","value":"5.50","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"296","AssetID":"E - LALE - 10","map___license_area":"England / SEPD","Substation":"Egham Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"Staines BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.84","minimum_observed_gross_demand__mva_":"6.43","contracted_demand_excl_bess__mva_":"4.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.50","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"16.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-32"}},{"id":"E - LALE - 11","name":"Sidney Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"Staines BSP","demand":{"raw":"8.65","value":"8.65","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"297","AssetID":"E - LALE - 11","map___license_area":"England / SEPD","Substation":"Sidney Road Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"Staines BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.78","minimum_observed_gross_demand__mva_":"3.38","contracted_demand_excl_bess__mva_":"2.66","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.65","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"16.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 12","name":"Stanwell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"Staines BSP","demand":{"raw":"3.77","value":"3.77","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"298","AssetID":"E - LALE - 12","map___license_area":"England / SEPD","Substation":"Stanwell Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"Staines BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.65","minimum_observed_gross_demand__mva_":"3.42","contracted_demand_excl_bess__mva_":"10.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.77","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"15.55","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LALE - 13","name":"Sunbury Cross Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Laleham GSP","upstreamBsp":"Staines BSP","demand":{"raw":"18.99","value":"18.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"299","AssetID":"E - LALE - 13","map___license_area":"England / SEPD","Substation":"Sunbury Cross Primary","Upstream GSP":"Laleham GSP","Upstream BSP":"Staines BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"29.72","minimum_observed_gross_demand__mva_":"6.23","contracted_demand_excl_bess__mva_":"11.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 01","name":"Lovedean GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"660.59","technicalLimits":"Yes","rawSource":{"_id":"300","AssetID":"E - LOVE - 01","map___license_area":"England / SEPD","Substation":"Lovedean GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"4 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"587.94","minimum_observed_gross_demand__mva_":"223.71","contracted_demand_excl_bess__mva_":"403.58","contracted_bess_demand__mva_":"660.59","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"348.58","contracted_generation__mw_":"772.33","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.10","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-31"}},{"id":"E - LOVE - 02","name":"Chichester BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"301","AssetID":"E - LOVE - 02","map___license_area":"England / SEPD","Substation":"Chichester BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 37.5 / 75MVA + 1 x 55 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"90.61","minimum_observed_gross_demand__mva_":"15.30","contracted_demand_excl_bess__mva_":"93.39","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"89.29","contracted_generation__mw_":"77.46","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.96","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-26"}},{"id":"E - LOVE - 03","name":"Fareham (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"7.37","technicalLimits":"Yes","rawSource":{"_id":"302","AssetID":"E - LOVE - 03","map___license_area":"England / SEPD","Substation":"Fareham (Main) BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"89.79","minimum_observed_gross_demand__mva_":"12.93","contracted_demand_excl_bess__mva_":"55.60","contracted_bess_demand__mva_":"7.37","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"75.84","contracted_generation__mw_":"32.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.08","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-26","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 04","name":"Fareham (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"55.29","technicalLimits":"Yes","rawSource":{"_id":"303","AssetID":"E - LOVE - 04","map___license_area":"England / SEPD","Substation":"Fareham (Reserve) BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 40 / 60MVA + 1 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"51.12","minimum_observed_gross_demand__mva_":"7.36","contracted_demand_excl_bess__mva_":"39.55","contracted_bess_demand__mva_":"55.29","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"38.00","contracted_generation__mw_":"49.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.43","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-26","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 05","name":"Fort Widley BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"304","AssetID":"E - LOVE - 05","map___license_area":"England / SEPD","Substation":"Fort Widley BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 40 / 60MVA + 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.03","minimum_observed_gross_demand__mva_":"4.92","contracted_demand_excl_bess__mva_":"16.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"38.26","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-27"}},{"id":"E - LOVE - 06","name":"Havant BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"305","AssetID":"E - LOVE - 06","map___license_area":"England / SEPD","Substation":"Havant BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"80.21","minimum_observed_gross_demand__mva_":"16.52","contracted_demand_excl_bess__mva_":"33.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"30.74","contracted_generation__mw_":"21.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 07","name":"Hunston BSP","area":"England / SEPD","level":"BSP","voltageKv":"133 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"306","AssetID":"E - LOVE - 07","map___license_area":"England / SEPD","Substation":"Hunston BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"133 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"71.58","minimum_observed_gross_demand__mva_":"16.05","contracted_demand_excl_bess__mva_":"36.92","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"39.00","contracted_generation__mw_":"42.76","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.59","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 08","name":"Portsmouth BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"307","AssetID":"E - LOVE - 08","map___license_area":"England / SEPD","Substation":"Portsmouth BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"95.26","minimum_observed_gross_demand__mva_":"34.30","contracted_demand_excl_bess__mva_":"14.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"16.15","contracted_generation__mw_":"4.94","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-30","Substation Reinforcement Completion Date":"Apr-30"}},{"id":"E - LOVE - 09","name":"Wymering BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Lovedean GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"3.89","technicalLimits":"Yes","rawSource":{"_id":"308","AssetID":"E - LOVE - 09","map___license_area":"England / SEPD","Substation":"Wymering BSP","Upstream GSP":"Lovedean GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"102.41","minimum_observed_gross_demand__mva_":"27.75","contracted_demand_excl_bess__mva_":"79.29","contracted_bess_demand__mva_":"3.89","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"20.35","contracted_generation__mw_":"5.54","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-32","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 10","name":"Argyle Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"309","AssetID":"E - LOVE - 10","map___license_area":"England / SEPD","Substation":"Argyle Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.02","minimum_observed_gross_demand__mva_":"2.31","contracted_demand_excl_bess__mva_":"0.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Mar-26","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 11","name":"Ashling Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Hunston BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"310","AssetID":"E - LOVE - 11","map___license_area":"England / SEPD","Substation":"Ashling Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Hunston BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.75","minimum_observed_gross_demand__mva_":"4.24","contracted_demand_excl_bess__mva_":"11.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.55","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Sep-31","Substation Reinforcement Completion Date":"Sep-31"}},{"id":"E - LOVE - 12","name":"Billingshurst Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"311","AssetID":"E - LOVE - 12","map___license_area":"England / SEPD","Substation":"Billingshurst Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"6.84","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"1.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"3.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 13","name":"Bilsham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"312","AssetID":"E - LOVE - 13","map___license_area":"England / SEPD","Substation":"Bilsham Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.71","minimum_observed_gross_demand__mva_":"3.56","contracted_demand_excl_bess__mva_":"18.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"24.20","contracted_generation__mw_":"4.04","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.82","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":"Aug-29"}},{"id":"E - LOVE - 14","name":"Birdham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Hunston BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"313","AssetID":"E - LOVE - 14","map___license_area":"England / SEPD","Substation":"Birdham Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Hunston BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.08","minimum_observed_gross_demand__mva_":"1.98","contracted_demand_excl_bess__mva_":"4.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.29","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":"Jun-30"}},{"id":"E - LOVE - 15","name":"Chichester Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"314","AssetID":"E - LOVE - 15","map___license_area":"England / SEPD","Substation":"Chichester Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.23","minimum_observed_gross_demand__mva_":"3.06","contracted_demand_excl_bess__mva_":"14.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"14.40","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-28"}},{"id":"E - LOVE - 16","name":"Hunston Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Hunston BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"315","AssetID":"E - LOVE - 16","map___license_area":"England / SEPD","Substation":"Hunston Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Hunston BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.60","minimum_observed_gross_demand__mva_":"3.27","contracted_demand_excl_bess__mva_":"12.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.94","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.61","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 17","name":"Market Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"316","AssetID":"E - LOVE - 17","map___license_area":"England / SEPD","Substation":"Market Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 28MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.68","minimum_observed_gross_demand__mva_":"2.81","contracted_demand_excl_bess__mva_":"4.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 18","name":"Rose Green Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Hunston BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"317","AssetID":"E - LOVE - 18","map___license_area":"England / SEPD","Substation":"Rose Green Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Hunston BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.46","minimum_observed_gross_demand__mva_":"2.57","contracted_demand_excl_bess__mva_":"7.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"5.77","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 19","name":"Selsey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Hunston BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"318","AssetID":"E - LOVE - 19","map___license_area":"England / SEPD","Substation":"Selsey Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Hunston BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.26","minimum_observed_gross_demand__mva_":"2.13","contracted_demand_excl_bess__mva_":"0.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"9.75","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 20","name":"South Bersted Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Chichester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"319","AssetID":"E - LOVE - 20","map___license_area":"England / SEPD","Substation":"South Bersted Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Chichester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.24","minimum_observed_gross_demand__mva_":"3.46","contracted_demand_excl_bess__mva_":"13.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"12.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-30","Substation Reinforcement Completion Date":"Jan-27"}},{"id":"E - LOVE - 21","name":"Brockhurst Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"320","AssetID":"E - LOVE - 21","map___license_area":"England / SEPD","Substation":"Brockhurst Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.79","minimum_observed_gross_demand__mva_":"5.19","contracted_demand_excl_bess__mva_":"4.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jul-31","Substation Reinforcement Completion Date":"Jul-31"}},{"id":"E - LOVE - 22","name":"Hoeford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"1.05","technicalLimits":"Yes","rawSource":{"_id":"321","AssetID":"E - LOVE - 22","map___license_area":"England / SEPD","Substation":"Hoeford Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 15MVA + 1 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.17","minimum_observed_gross_demand__mva_":"3.34","contracted_demand_excl_bess__mva_":"8.02","contracted_bess_demand__mva_":"1.05","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.71","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-27","Substation Reinforcement Completion Date":"Apr-31"}},{"id":"E - LOVE - 23","name":"North Fareham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"322","AssetID":"E - LOVE - 23","map___license_area":"England / SEPD","Substation":"North Fareham Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.09","minimum_observed_gross_demand__mva_":"1.89","contracted_demand_excl_bess__mva_":"14.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 24","name":"Plessey Titchfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"323","AssetID":"E - LOVE - 24","map___license_area":"England / SEPD","Substation":"Plessey Titchfield Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.53","minimum_observed_gross_demand__mva_":"6.18","contracted_demand_excl_bess__mva_":"5.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"9.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 25","name":"Titchfield Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"324","AssetID":"E - LOVE - 25","map___license_area":"England / SEPD","Substation":"Titchfield Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.11","minimum_observed_gross_demand__mva_":"1.32","contracted_demand_excl_bess__mva_":"1.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.99","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"11.81","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-31"}},{"id":"E - LOVE - 26","name":"West End Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Main) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"325","AssetID":"E - LOVE - 26","map___license_area":"England / SEPD","Substation":"West End Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.56","minimum_observed_gross_demand__mva_":"4.00","contracted_demand_excl_bess__mva_":"7.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.53","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 27","name":"Lee-On-Solent Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"326","AssetID":"E - LOVE - 27","map___license_area":"England / SEPD","Substation":"Lee-On-Solent Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.33","minimum_observed_gross_demand__mva_":"2.26","contracted_demand_excl_bess__mva_":"13.83","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 28","name":"Rowner Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"327","AssetID":"E - LOVE - 28","map___license_area":"England / SEPD","Substation":"Rowner Park Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 15 / 21MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.60","minimum_observed_gross_demand__mva_":"1.91","contracted_demand_excl_bess__mva_":"0.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 29","name":"Zetland Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fareham (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"328","AssetID":"E - LOVE - 29","map___license_area":"England / SEPD","Substation":"Zetland Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fareham (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.57","minimum_observed_gross_demand__mva_":"3.21","contracted_demand_excl_bess__mva_":"4.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 30","name":"Purbrook Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fort Widley BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"329","AssetID":"E - LOVE - 30","map___license_area":"England / SEPD","Substation":"Purbrook Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fort Widley BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.29","minimum_observed_gross_demand__mva_":"0.91","contracted_demand_excl_bess__mva_":"2.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 31","name":"Waterlooville Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Fort Widley BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"330","AssetID":"E - LOVE - 31","map___license_area":"England / SEPD","Substation":"Waterlooville Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Fort Widley BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20 / 28MVA + 2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.55","minimum_observed_gross_demand__mva_":"3.67","contracted_demand_excl_bess__mva_":"14.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.26","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.96","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Nov-28","Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 32","name":"Brockhampton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"331","AssetID":"E - LOVE - 32","map___license_area":"England / SEPD","Substation":"Brockhampton Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.27","minimum_observed_gross_demand__mva_":"3.73","contracted_demand_excl_bess__mva_":"5.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.14","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"May-27"}},{"id":"E - LOVE - 33","name":"Emsworth Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"332","AssetID":"E - LOVE - 33","map___license_area":"England / SEPD","Substation":"Emsworth Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.88","minimum_observed_gross_demand__mva_":"1.28","contracted_demand_excl_bess__mva_":"7.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.80","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-29"}},{"id":"E - LOVE - 34","name":"Gable Head Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"333","AssetID":"E - LOVE - 34","map___license_area":"England / SEPD","Substation":"Gable Head Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.79","minimum_observed_gross_demand__mva_":"1.61","contracted_demand_excl_bess__mva_":"2.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 35","name":"Horndean Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"334","AssetID":"E - LOVE - 35","map___license_area":"England / SEPD","Substation":"Horndean Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.55","minimum_observed_gross_demand__mva_":"2.67","contracted_demand_excl_bess__mva_":"13.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.80","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Nov-28","Substation Reinforcement Completion Date":"Nov-28"}},{"id":"E - LOVE - 36","name":"Leigh Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"335","AssetID":"E - LOVE - 36","map___license_area":"England / SEPD","Substation":"Leigh Park Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 32MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.20","minimum_observed_gross_demand__mva_":"3.55","contracted_demand_excl_bess__mva_":"3.86","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"3.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 37","name":"Meyrick Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Havant BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"336","AssetID":"E - LOVE - 37","map___license_area":"England / SEPD","Substation":"Meyrick Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Havant BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.79","minimum_observed_gross_demand__mva_":"3.11","contracted_demand_excl_bess__mva_":"1.29","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 38","name":"Brandon Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Portsmouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"337","AssetID":"E - LOVE - 38","map___license_area":"England / SEPD","Substation":"Brandon Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Portsmouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.94","minimum_observed_gross_demand__mva_":"3.32","contracted_demand_excl_bess__mva_":"2.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 39","name":"Eastney Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Portsmouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"338","AssetID":"E - LOVE - 39","map___license_area":"England / SEPD","Substation":"Eastney Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Portsmouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.77","minimum_observed_gross_demand__mva_":"1.19","contracted_demand_excl_bess__mva_":"0.60","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 40","name":"Fratton Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Portsmouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"339","AssetID":"E - LOVE - 40","map___license_area":"England / SEPD","Substation":"Fratton Park Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Portsmouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.85","minimum_observed_gross_demand__mva_":"5.97","contracted_demand_excl_bess__mva_":"5.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.68","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 41","name":"Greetham Street Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Portsmouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"340","AssetID":"E - LOVE - 41","map___license_area":"England / SEPD","Substation":"Greetham Street Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Portsmouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.17","minimum_observed_gross_demand__mva_":"3.50","contracted_demand_excl_bess__mva_":"1.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 42","name":"Portsmouth Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Portsmouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"341","AssetID":"E - LOVE - 42","map___license_area":"England / SEPD","Substation":"Portsmouth Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Portsmouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.70","minimum_observed_gross_demand__mva_":"3.25","contracted_demand_excl_bess__mva_":"3.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 43","name":"College Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"342","AssetID":"E - LOVE - 43","map___license_area":"England / SEPD","Substation":"College Park Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.68","minimum_observed_gross_demand__mva_":"1.83","contracted_demand_excl_bess__mva_":"0.63","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 44","name":"Farlington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"3.89","technicalLimits":"Yes","rawSource":{"_id":"343","AssetID":"E - LOVE - 44","map___license_area":"England / SEPD","Substation":"Farlington Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.04","minimum_observed_gross_demand__mva_":"1.45","contracted_demand_excl_bess__mva_":"8.94","contracted_bess_demand__mva_":"3.89","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 45","name":"Gamble Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"344","AssetID":"E - LOVE - 45","map___license_area":"England / SEPD","Substation":"Gamble Road Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.89","minimum_observed_gross_demand__mva_":"3.96","contracted_demand_excl_bess__mva_":"9.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.34","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 46","name":"Hilsea Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"345","AssetID":"E - LOVE - 46","map___license_area":"England / SEPD","Substation":"Hilsea Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.72","minimum_observed_gross_demand__mva_":"1.83","contracted_demand_excl_bess__mva_":"0.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 47","name":"Portchester Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"346","AssetID":"E - LOVE - 47","map___license_area":"England / SEPD","Substation":"Portchester Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.31","minimum_observed_gross_demand__mva_":"4.17","contracted_demand_excl_bess__mva_":"3.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.04","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"15.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - LOVE - 48","name":"Wymering Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lovedean GSP","upstreamBsp":"Wymering BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"347","AssetID":"E - LOVE - 48","map___license_area":"England / SEPD","Substation":"Wymering Primary","Upstream GSP":"Lovedean GSP","Upstream BSP":"Wymering BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA + 1 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.04","minimum_observed_gross_demand__mva_":"5.17","contracted_demand_excl_bess__mva_":"14.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"11.57","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 01","name":"Mannington GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"777.10","technicalLimits":"Yes","rawSource":{"_id":"348","AssetID":"E - MANN - 01","map___license_area":"England / SEPD","Substation":"Mannington GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"5 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"628.08","minimum_observed_gross_demand__mva_":"182.76","contracted_demand_excl_bess__mva_":"207.55","contracted_bess_demand__mva_":"777.10","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"524.65","contracted_generation__mw_":"1279.98","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"23.57","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-28"}},{"id":"E - MANN - 02","name":"Arnewood BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"25.84","value":"25.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"349","AssetID":"E - MANN - 02","map___license_area":"England / SEPD","Substation":"Arnewood BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"46.92","minimum_observed_gross_demand__mva_":"8.08","contracted_demand_excl_bess__mva_":"7.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"25.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"5.87","contracted_generation__mw_":"12.35","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-31"}},{"id":"E - MANN - 03","name":"Bournemouth BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"350","AssetID":"E - MANN - 03","map___license_area":"England / SEPD","Substation":"Bournemouth BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"3 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"130.13","minimum_observed_gross_demand__mva_":"28.46","contracted_demand_excl_bess__mva_":"31.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"7.21","contracted_generation__mw_":"0.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"23.15","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"E - MANN - 04","name":"Christchurch BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"44.18","value":"44.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"351","AssetID":"E - MANN - 04","map___license_area":"England / SEPD","Substation":"Christchurch BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"56.63","minimum_observed_gross_demand__mva_":"10.91","contracted_demand_excl_bess__mva_":"25.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"44.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"24.51","contracted_generation__mw_":"89.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"15.67","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-31","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 05","name":"Lytchett BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"21.28","value":"21.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"45.68","technicalLimits":"Yes","rawSource":{"_id":"352","AssetID":"E - MANN - 05","map___license_area":"England / SEPD","Substation":"Lytchett BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"57.76","minimum_observed_gross_demand__mva_":"14.25","contracted_demand_excl_bess__mva_":"13.96","contracted_bess_demand__mva_":"45.68","estimated_demand_headroom__mva_":"21.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"90.30","contracted_generation__mw_":"80.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"16.03","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-28"}},{"id":"E - MANN - 06","name":"Mannington BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"15.67","value":"15.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"353","AssetID":"E - MANN - 06","map___license_area":"England / SEPD","Substation":"Mannington BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"3 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"86.67","minimum_observed_gross_demand__mva_":"14.23","contracted_demand_excl_bess__mva_":"24.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"76.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-28"}},{"id":"E - MANN - 07","name":"Poole (Hamworthy) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"23.03","value":"23.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"354","AssetID":"E - MANN - 07","map___license_area":"England / SEPD","Substation":"Poole (Hamworthy) BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"30.17","minimum_observed_gross_demand__mva_":"6.63","contracted_demand_excl_bess__mva_":"7.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"23.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.37","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 08","name":"Redhill BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"21.11","value":"21.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"62.51","technicalLimits":"Yes","rawSource":{"_id":"355","AssetID":"E - MANN - 08","map___license_area":"England / SEPD","Substation":"Redhill BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"55.45","minimum_observed_gross_demand__mva_":"16.16","contracted_demand_excl_bess__mva_":"16.42","contracted_bess_demand__mva_":"62.51","estimated_demand_headroom__mva_":"21.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"61.54","contracted_generation__mw_":"100.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.13","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 09","name":"Salisbury BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"50.70","value":"50.70","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"9.00","technicalLimits":"Yes","rawSource":{"_id":"356","AssetID":"E - MANN - 09","map___license_area":"England / SEPD","Substation":"Salisbury BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 22.5 / 45MVA + 2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"68.26","minimum_observed_gross_demand__mva_":"14.19","contracted_demand_excl_bess__mva_":"31.79","contracted_bess_demand__mva_":"9.00","estimated_demand_headroom__mva_":"50.70","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"21.24","contracted_generation__mw_":"67.55","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"16.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jan-29"}},{"id":"E - MANN - 10","name":"Shaftesbury BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"31.18","value":"31.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"59.24","technicalLimits":"Yes","rawSource":{"_id":"357","AssetID":"E - MANN - 10","map___license_area":"England / SEPD","Substation":"Shaftesbury BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 55 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"57.40","minimum_observed_gross_demand__mva_":"15.53","contracted_demand_excl_bess__mva_":"41.86","contracted_bess_demand__mva_":"59.24","estimated_demand_headroom__mva_":"31.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"60.42","contracted_generation__mw_":"91.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.50","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-32","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 11","name":"Wareham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"358","AssetID":"E - MANN - 11","map___license_area":"England / SEPD","Substation":"Wareham BSP","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"29.16","minimum_observed_gross_demand__mva_":"7.70","contracted_demand_excl_bess__mva_":"2.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"47.91","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.29","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jan-28"}},{"id":"E - MANN - 12","name":"Winfrith Heath Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"359","AssetID":"E - MANN - 12","map___license_area":"England / SEPD","Substation":"Winfrith Heath Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.98","minimum_observed_gross_demand__mva_":"3.31","contracted_demand_excl_bess__mva_":"5.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"23.51","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 13","name":"Hincheslea Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Arnewood BSP","demand":{"raw":"7.45","value":"7.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"360","AssetID":"E - MANN - 13","map___license_area":"England / SEPD","Substation":"Hincheslea Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Arnewood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.44","minimum_observed_gross_demand__mva_":"1.76","contracted_demand_excl_bess__mva_":"0.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 14","name":"Lymington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Arnewood BSP","demand":{"raw":"9.45","value":"9.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"361","AssetID":"E - MANN - 14","map___license_area":"England / SEPD","Substation":"Lymington Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Arnewood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.09","minimum_observed_gross_demand__mva_":"3.50","contracted_demand_excl_bess__mva_":"3.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"4.39","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.60","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 15","name":"Milford-On-Sea Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Arnewood BSP","demand":{"raw":"3.53","value":"3.53","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"362","AssetID":"E - MANN - 15","map___license_area":"England / SEPD","Substation":"Milford-On-Sea Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Arnewood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.21","minimum_observed_gross_demand__mva_":"1.85","contracted_demand_excl_bess__mva_":"2.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.53","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-26"}},{"id":"E - MANN - 16","name":"New Milton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Arnewood BSP","demand":{"raw":"11.18","value":"11.18","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"363","AssetID":"E - MANN - 16","map___license_area":"England / SEPD","Substation":"New Milton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Arnewood BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.25","minimum_observed_gross_demand__mva_":"3.58","contracted_demand_excl_bess__mva_":"1.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.18","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.43","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 17","name":"Alderney Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"364","AssetID":"E - MANN - 17","map___license_area":"England / SEPD","Substation":"Alderney Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 22.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.94","minimum_observed_gross_demand__mva_":"2.44","contracted_demand_excl_bess__mva_":"13.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"E - MANN - 18","name":"Bourne Valley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"365","AssetID":"E - MANN - 18","map___license_area":"England / SEPD","Substation":"Bourne Valley Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.81","minimum_observed_gross_demand__mva_":"4.73","contracted_demand_excl_bess__mva_":"4.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 19","name":"Central Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"366","AssetID":"E - MANN - 19","map___license_area":"England / SEPD","Substation":"Central Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.64","minimum_observed_gross_demand__mva_":"4.70","contracted_demand_excl_bess__mva_":"1.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 20","name":"Electric House Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"367","AssetID":"E - MANN - 20","map___license_area":"England / SEPD","Substation":"Electric House Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.82","minimum_observed_gross_demand__mva_":"2.81","contracted_demand_excl_bess__mva_":"4.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"14.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 21","name":"Parkstone North Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"368","AssetID":"E - MANN - 21","map___license_area":"England / SEPD","Substation":"Parkstone North Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.61","minimum_observed_gross_demand__mva_":"3.26","contracted_demand_excl_bess__mva_":"3.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 22","name":"Parkstone South Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"369","AssetID":"E - MANN - 22","map___license_area":"England / SEPD","Substation":"Parkstone South Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.51","minimum_observed_gross_demand__mva_":"2.63","contracted_demand_excl_bess__mva_":"1.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 23","name":"Westbourne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Bournemouth BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"370","AssetID":"E - MANN - 23","map___license_area":"England / SEPD","Substation":"Westbourne Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Bournemouth BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.70","minimum_observed_gross_demand__mva_":"3.28","contracted_demand_excl_bess__mva_":"1.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 24","name":"Boscombe East Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Christchurch BSP","demand":{"raw":"8.58","value":"8.58","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"371","AssetID":"E - MANN - 24","map___license_area":"England / SEPD","Substation":"Boscombe East Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Christchurch BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.53","minimum_observed_gross_demand__mva_":"2.03","contracted_demand_excl_bess__mva_":"13.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.58","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 25","name":"Christchurch Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Christchurch BSP","demand":{"raw":"4.34","value":"4.34","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"372","AssetID":"E - MANN - 25","map___license_area":"England / SEPD","Substation":"Christchurch Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Christchurch BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.27","minimum_observed_gross_demand__mva_":"4.67","contracted_demand_excl_bess__mva_":"5.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.34","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.83","contracted_generation__mw_":"0.44","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"10.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 26","name":"Somerford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Christchurch BSP","demand":{"raw":"6.72","value":"6.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"373","AssetID":"E - MANN - 26","map___license_area":"England / SEPD","Substation":"Somerford Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Christchurch BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.42","minimum_observed_gross_demand__mva_":"5.60","contracted_demand_excl_bess__mva_":"1.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 27","name":"Southbourne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Christchurch BSP","demand":{"raw":"6.55","value":"6.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"374","AssetID":"E - MANN - 27","map___license_area":"England / SEPD","Substation":"Southbourne Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Christchurch BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.47","minimum_observed_gross_demand__mva_":"2.23","contracted_demand_excl_bess__mva_":"5.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 28","name":"Blandford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Lytchett BSP","demand":{"raw":"20.67","value":"20.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"375","AssetID":"E - MANN - 28","map___license_area":"England / SEPD","Substation":"Blandford Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Lytchett BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x  20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.10","minimum_observed_gross_demand__mva_":"3.22","contracted_demand_excl_bess__mva_":"4.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"20.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"7.42","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 29","name":"Corfe Mullen Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Lytchett BSP","demand":{"raw":"15.48","value":"15.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"376","AssetID":"E - MANN - 29","map___license_area":"England / SEPD","Substation":"Corfe Mullen Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Lytchett BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.13","minimum_observed_gross_demand__mva_":"1.76","contracted_demand_excl_bess__mva_":"2.92","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"2.04","contracted_generation__mw_":"13.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 30","name":"Creekmoor Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Lytchett BSP","demand":{"raw":"15.70","value":"15.70","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"377","AssetID":"E - MANN - 30","map___license_area":"England / SEPD","Substation":"Creekmoor Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Lytchett BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 28MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.48","minimum_observed_gross_demand__mva_":"3.56","contracted_demand_excl_bess__mva_":"2.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.70","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 31","name":"Holes Bay Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Lytchett BSP","demand":{"raw":"4.13","value":"4.13","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"378","AssetID":"E - MANN - 31","map___license_area":"England / SEPD","Substation":"Holes Bay Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Lytchett BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.20","minimum_observed_gross_demand__mva_":"2.48","contracted_demand_excl_bess__mva_":"2.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.13","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"7.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 32","name":"Winterborne Kingston Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Lytchett BSP","demand":{"raw":"3.14","value":"3.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"379","AssetID":"E - MANN - 32","map___license_area":"England / SEPD","Substation":"Winterborne Kingston Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Lytchett BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.57","minimum_observed_gross_demand__mva_":"1.00","contracted_demand_excl_bess__mva_":"1.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"E - MANN - 33","name":"Ferndown Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"15.67","value":"15.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"380","AssetID":"E - MANN - 33","map___license_area":"England / SEPD","Substation":"Ferndown Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"23.27","minimum_observed_gross_demand__mva_":"3.35","contracted_demand_excl_bess__mva_":"7.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 34","name":"Fordingbridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"4.71","value":"4.71","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"381","AssetID":"E - MANN - 34","map___license_area":"England / SEPD","Substation":"Fordingbridge Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.71","minimum_observed_gross_demand__mva_":"1.18","contracted_demand_excl_bess__mva_":"4.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.71","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 35","name":"Hinton Martell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"6.35","value":"6.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"382","AssetID":"E - MANN - 35","map___license_area":"England / SEPD","Substation":"Hinton Martell Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.61","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"0.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"7.90","unsafe_3_phase_break_fault_level__ka_":"3.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 36","name":"Mannington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"5.43","value":"5.43","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"383","AssetID":"E - MANN - 36","map___license_area":"England / SEPD","Substation":"Mannington Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.95","minimum_observed_gross_demand__mva_":"1.29","contracted_demand_excl_bess__mva_":"2.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.43","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 37","name":"Mill Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"7.49","value":"7.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"384","AssetID":"E - MANN - 37","map___license_area":"England / SEPD","Substation":"Mill Lane Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.46","minimum_observed_gross_demand__mva_":"3.73","contracted_demand_excl_bess__mva_":"5.93","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-29"}},{"id":"E - MANN - 38","name":"Rockbourne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"3.57","value":"3.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"385","AssetID":"E - MANN - 38","map___license_area":"England / SEPD","Substation":"Rockbourne Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.61","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"2.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 39","name":"Verwood Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"3.54","value":"3.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"386","AssetID":"E - MANN - 39","map___license_area":"England / SEPD","Substation":"Verwood Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.15","minimum_observed_gross_demand__mva_":"1.37","contracted_demand_excl_bess__mva_":"0.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 40","name":"Wimborne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"2.17","value":"2.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"387","AssetID":"E - MANN - 40","map___license_area":"England / SEPD","Substation":"Wimborne Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.61","minimum_observed_gross_demand__mva_":"4.10","contracted_demand_excl_bess__mva_":"3.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-28"}},{"id":"E - MANN - 41","name":"Wimborne St Giles Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Mannington BSP","demand":{"raw":"0.52","value":"0.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"388","AssetID":"E - MANN - 41","map___license_area":"England / SEPD","Substation":"Wimborne St Giles Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Mannington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.96","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"2.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 42","name":"Hamworthy Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Poole (Hamworthy) BSP","demand":{"raw":"5.81","value":"5.81","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"389","AssetID":"E - MANN - 42","map___license_area":"England / SEPD","Substation":"Hamworthy Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Poole (Hamworthy) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 10MVA + 2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.20","minimum_observed_gross_demand__mva_":"3.02","contracted_demand_excl_bess__mva_":"4.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.81","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.29","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.75","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 43","name":"Poole Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Poole (Hamworthy) BSP","demand":{"raw":"10.23","value":"10.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"390","AssetID":"E - MANN - 43","map___license_area":"England / SEPD","Substation":"Poole Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Poole (Hamworthy) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.79","minimum_observed_gross_demand__mva_":"3.28","contracted_demand_excl_bess__mva_":"2.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.76","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - MANN - 44","name":"East Howe Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Redhill BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"391","AssetID":"E - MANN - 44","map___license_area":"England / SEPD","Substation":"East Howe Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Redhill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 23.7MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.05","minimum_observed_gross_demand__mva_":"3.14","contracted_demand_excl_bess__mva_":"8.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 45","name":"Redhill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Redhill BSP","demand":{"raw":"21.11","value":"21.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"392","AssetID":"E - MANN - 45","map___license_area":"England / SEPD","Substation":"Redhill Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Redhill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.91","minimum_observed_gross_demand__mva_":"4.35","contracted_demand_excl_bess__mva_":"5.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"21.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.06","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 46","name":"Winton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Redhill BSP","demand":{"raw":"5.94","value":"5.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"393","AssetID":"E - MANN - 46","map___license_area":"England / SEPD","Substation":"Winton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Redhill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.25","minimum_observed_gross_demand__mva_":"6.42","contracted_demand_excl_bess__mva_":"1.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"16.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - MANN - 47","name":"Bemerton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"21.26","value":"21.26","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"394","AssetID":"E - MANN - 47","map___license_area":"England / SEPD","Substation":"Bemerton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.98","minimum_observed_gross_demand__mva_":"1.79","contracted_demand_excl_bess__mva_":"2.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"21.26","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"9.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 48","name":"Homington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"8.04","value":"8.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"395","AssetID":"E - MANN - 48","map___license_area":"England / SEPD","Substation":"Homington Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.98","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"0.25","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"9.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.41","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 49","name":"Netherhampton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"3.50","value":"3.50","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"396","AssetID":"E - MANN - 49","map___license_area":"England / SEPD","Substation":"Netherhampton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.55","minimum_observed_gross_demand__mva_":"0.80","contracted_demand_excl_bess__mva_":"5.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.50","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"9.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 50","name":"Petersfinger Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"5.46","value":"5.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"397","AssetID":"E - MANN - 50","map___license_area":"England / SEPD","Substation":"Petersfinger Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.51","minimum_observed_gross_demand__mva_":"2.54","contracted_demand_excl_bess__mva_":"8.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.36","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 51","name":"Redlynch Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"3.83","value":"3.83","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"398","AssetID":"E - MANN - 51","map___license_area":"England / SEPD","Substation":"Redlynch Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.95","minimum_observed_gross_demand__mva_":"1.43","contracted_demand_excl_bess__mva_":"0.66","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.83","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"7.46","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 52","name":"Salisbury Central Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"8.14","value":"8.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"399","AssetID":"E - MANN - 52","map___license_area":"England / SEPD","Substation":"Salisbury Central Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 15 / 30 + 2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.43","minimum_observed_gross_demand__mva_":"3.70","contracted_demand_excl_bess__mva_":"13.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.60","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Jan-29","Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 53","name":"Stapleford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"8.46","value":"8.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"400","AssetID":"E - MANN - 53","map___license_area":"England / SEPD","Substation":"Stapleford Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.78","minimum_observed_gross_demand__mva_":"0.69","contracted_demand_excl_bess__mva_":"1.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 54","name":"Teffont Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Salisbury BSP","demand":{"raw":"2.35","value":"2.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"401","AssetID":"E - MANN - 54","map___license_area":"England / SEPD","Substation":"Teffont Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Salisbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA + 1 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.87","minimum_observed_gross_demand__mva_":"0.56","contracted_demand_excl_bess__mva_":"0.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.16","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 55","name":"Bourton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"3.00","value":"3.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"402","AssetID":"E - MANN - 55","map___license_area":"England / SEPD","Substation":"Bourton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.52","minimum_observed_gross_demand__mva_":"1.23","contracted_demand_excl_bess__mva_":"2.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.71","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 56","name":"Gillingham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"26.27","value":"26.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"403","AssetID":"E - MANN - 56","map___license_area":"England / SEPD","Substation":"Gillingham Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.90","minimum_observed_gross_demand__mva_":"0.71","contracted_demand_excl_bess__mva_":"9.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"26.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.37","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.36","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 57","name":"Gussage St Michael Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"7.22","value":"7.22","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"404","AssetID":"E - MANN - 57","map___license_area":"England / SEPD","Substation":"Gussage St Michael Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.21","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.22","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"3.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 58","name":"Minchington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"3.33","value":"3.33","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"405","AssetID":"E - MANN - 58","map___license_area":"England / SEPD","Substation":"Minchington Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.28","minimum_observed_gross_demand__mva_":"0.33","contracted_demand_excl_bess__mva_":"1.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.33","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"2.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 59","name":"Shaftesbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"406","AssetID":"E - MANN - 59","map___license_area":"England / SEPD","Substation":"Shaftesbury Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.37","minimum_observed_gross_demand__mva_":"1.89","contracted_demand_excl_bess__mva_":"2.37","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"8.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 60","name":"Shroton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"9.99","value":"9.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"407","AssetID":"E - MANN - 60","map___license_area":"England / SEPD","Substation":"Shroton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.43","minimum_observed_gross_demand__mva_":"2.08","contracted_demand_excl_bess__mva_":"1.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.25","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 61","name":"Tarrant Rushton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"3.53","value":"3.53","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"408","AssetID":"E - MANN - 61","map___license_area":"England / SEPD","Substation":"Tarrant Rushton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.64","minimum_observed_gross_demand__mva_":"0.96","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.53","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 62","name":"Tisbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"0.70","value":"0.70","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"409","AssetID":"E - MANN - 62","map___license_area":"England / SEPD","Substation":"Tisbury Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.12","minimum_observed_gross_demand__mva_":"0.74","contracted_demand_excl_bess__mva_":"6.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.70","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.36","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 63","name":"West Stour Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"4.74","value":"4.74","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"410","AssetID":"E - MANN - 63","map___license_area":"England / SEPD","Substation":"West Stour Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA + 1 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.68","minimum_observed_gross_demand__mva_":"0.67","contracted_demand_excl_bess__mva_":"0.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.74","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.17","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 64","name":"Wincanton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Shaftesbury BSP","demand":{"raw":"2.48","value":"2.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"411","AssetID":"E - MANN - 64","map___license_area":"England / SEPD","Substation":"Wincanton Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Shaftesbury BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.39","minimum_observed_gross_demand__mva_":"1.29","contracted_demand_excl_bess__mva_":"4.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.16","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 65","name":"Bovington Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Wareham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"412","AssetID":"E - MANN - 65","map___license_area":"England / SEPD","Substation":"Bovington Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Wareham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.31","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"0.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"5.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 66","name":"Bushey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Wareham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"413","AssetID":"E - MANN - 66","map___license_area":"England / SEPD","Substation":"Bushey Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Wareham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.59","minimum_observed_gross_demand__mva_":"0.39","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MANN - 67","name":"Swanage Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Wareham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"414","AssetID":"E - MANN - 67","map___license_area":"England / SEPD","Substation":"Swanage Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Wareham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.08","minimum_observed_gross_demand__mva_":"1.89","contracted_demand_excl_bess__mva_":"1.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-27"}},{"id":"E - MANN - 68","name":"Wareham Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mannington GSP","upstreamBsp":"Wareham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"415","AssetID":"E - MANN - 68","map___license_area":"England / SEPD","Substation":"Wareham Town Primary","Upstream GSP":"Mannington GSP","Upstream BSP":"Wareham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.25MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.37","minimum_observed_gross_demand__mva_":"1.70","contracted_demand_excl_bess__mva_":"1.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"4.04","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jan-28"}},{"id":"E - MELK - 01","name":"Melksham GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"764.92","technicalLimits":"Yes","rawSource":{"_id":"416","AssetID":"E - MELK - 01","map___license_area":"England / SEPD","Substation":"Melksham GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"4 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"433.40","minimum_observed_gross_demand__mva_":"127.23","contracted_demand_excl_bess__mva_":"176.00","contracted_bess_demand__mva_":"764.92","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"501.52","contracted_generation__mw_":"1653.80","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.19","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"E - MELK - 02","name":"Andover BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Melksham GSP","upstreamBsp":"N/A","demand":{"raw":"23.66","value":"23.66","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"5.54","technicalLimits":"Yes","rawSource":{"_id":"417","AssetID":"E - MELK - 02","map___license_area":"England / SEPD","Substation":"Andover BSP","Upstream GSP":"Melksham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"77.79","minimum_observed_gross_demand__mva_":"11.21","contracted_demand_excl_bess__mva_":"23.99","contracted_bess_demand__mva_":"5.54","estimated_demand_headroom__mva_":"23.66","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"78.59","contracted_generation__mw_":"40.92","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"16.12","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-29"}},{"id":"E - MELK - 03","name":"Chippenham BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Melksham GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"55.40","technicalLimits":"Yes","rawSource":{"_id":"418","AssetID":"E - MELK - 03","map___license_area":"England / SEPD","Substation":"Chippenham BSP","Upstream GSP":"Melksham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"100.97","minimum_observed_gross_demand__mva_":"23.86","contracted_demand_excl_bess__mva_":"71.31","contracted_bess_demand__mva_":"55.40","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"83.70","contracted_generation__mw_":"208.32","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"14.76","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-28"}},{"id":"E - MELK - 04","name":"Frome BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Melksham GSP","upstreamBsp":"N/A","demand":{"raw":"19.00","value":"19.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"419","AssetID":"E - MELK - 04","map___license_area":"England / SEPD","Substation":"Frome BSP","Upstream GSP":"Melksham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"81.35","minimum_observed_gross_demand__mva_":"18.73","contracted_demand_excl_bess__mva_":"28.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"19.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"11.50","contracted_generation__mw_":"9.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - MELK - 05","name":"Norrington BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Melksham GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"70.28","technicalLimits":"Yes","rawSource":{"_id":"420","AssetID":"E - MELK - 05","map___license_area":"England / SEPD","Substation":"Norrington BSP","Upstream GSP":"Melksham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"3 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"137.42","minimum_observed_gross_demand__mva_":"30.29","contracted_demand_excl_bess__mva_":"44.93","contracted_bess_demand__mva_":"70.28","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"147.48","contracted_generation__mw_":"138.51","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"22.38","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":"Feb-28"}},{"id":"E - MELK - 06","name":"West Grafton BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Melksham GSP","upstreamBsp":"N/A","demand":{"raw":"21.35","value":"21.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"421","AssetID":"E - MELK - 06","map___license_area":"England / SEPD","Substation":"West Grafton BSP","Upstream GSP":"Melksham GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 22.5 / 45MVA + 1 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"29.25","minimum_observed_gross_demand__mva_":"8.77","contracted_demand_excl_bess__mva_":"7.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"21.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"5.36","contracted_generation__mw_":"14.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 07","name":"Andover Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"14.99","value":"14.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"422","AssetID":"E - MELK - 07","map___license_area":"England / SEPD","Substation":"Andover Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.43","minimum_observed_gross_demand__mva_":"1.64","contracted_demand_excl_bess__mva_":"2.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"14.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.35","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 08","name":"Andover East Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"6.91","value":"6.91","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"423","AssetID":"E - MELK - 08","map___license_area":"England / SEPD","Substation":"Andover East Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.69","minimum_observed_gross_demand__mva_":"5.67","contracted_demand_excl_bess__mva_":"6.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.91","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.59","contracted_generation__mw_":"0.40","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 09","name":"Andover Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"6.07","value":"6.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"424","AssetID":"E - MELK - 09","map___license_area":"England / SEPD","Substation":"Andover Town Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.65","minimum_observed_gross_demand__mva_":"1.36","contracted_demand_excl_bess__mva_":"0.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.28","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"12.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 10","name":"Barton Stacey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"12.00","value":"12.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"5.54","technicalLimits":"Yes","rawSource":{"_id":"425","AssetID":"E - MELK - 10","map___license_area":"England / SEPD","Substation":"Barton Stacey Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.80","minimum_observed_gross_demand__mva_":"1.13","contracted_demand_excl_bess__mva_":"0.57","contracted_bess_demand__mva_":"5.54","estimated_demand_headroom__mva_":"12.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"12.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Nov-28","Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 11","name":"Hurstbourne Tarrant Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"1.74","value":"1.74","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"426","AssetID":"E - MELK - 11","map___license_area":"England / SEPD","Substation":"Hurstbourne Tarrant Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.69","minimum_observed_gross_demand__mva_":"0.73","contracted_demand_excl_bess__mva_":"1.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.74","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.67","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 12","name":"Middle Wallop Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"427","AssetID":"E - MELK - 12","map___license_area":"England / SEPD","Substation":"Middle Wallop Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"6.90","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"0.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"4.40","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 13","name":"Portway Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"8.30","value":"8.30","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"428","AssetID":"E - MELK - 13","map___license_area":"England / SEPD","Substation":"Portway Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.05","minimum_observed_gross_demand__mva_":"2.31","contracted_demand_excl_bess__mva_":"2.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.30","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"9.81","contracted_generation__mw_":"8.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 14","name":"Thruxton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"3.45","value":"3.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"429","AssetID":"E - MELK - 14","map___license_area":"England / SEPD","Substation":"Thruxton Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.19","minimum_observed_gross_demand__mva_":"0.68","contracted_demand_excl_bess__mva_":"0.92","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 15","name":"Whitchurch Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Andover BSP","demand":{"raw":"1.35","value":"1.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"430","AssetID":"E - MELK - 15","map___license_area":"England / SEPD","Substation":"Whitchurch Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Andover BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5 / 6.5MVA + 1 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.65","minimum_observed_gross_demand__mva_":"0.93","contracted_demand_excl_bess__mva_":"0.83","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Nov-28","Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 16","name":"Alderton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"431","AssetID":"E - MELK - 16","map___license_area":"England / SEPD","Substation":"Alderton Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.92","minimum_observed_gross_demand__mva_":"0.48","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":"Jun-30"}},{"id":"E - MELK - 17","name":"Calne Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"432","AssetID":"E - MELK - 17","map___license_area":"England / SEPD","Substation":"Calne Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.40","minimum_observed_gross_demand__mva_":"2.22","contracted_demand_excl_bess__mva_":"4.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"11.88","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 18","name":"Cocklebury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"433","AssetID":"E - MELK - 18","map___license_area":"England / SEPD","Substation":"Cocklebury Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.77","minimum_observed_gross_demand__mva_":"4.54","contracted_demand_excl_bess__mva_":"6.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"21.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 19","name":"Lyneham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"434","AssetID":"E - MELK - 19","map___license_area":"England / SEPD","Substation":"Lyneham Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 10.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.07","minimum_observed_gross_demand__mva_":"1.43","contracted_demand_excl_bess__mva_":"2.63","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.30","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 20","name":"Malmesbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"435","AssetID":"E - MELK - 20","map___license_area":"England / SEPD","Substation":"Malmesbury Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.35","minimum_observed_gross_demand__mva_":"3.79","contracted_demand_excl_bess__mva_":"1.60","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.70","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 21","name":"Rowden Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"436","AssetID":"E - MELK - 21","map___license_area":"England / SEPD","Substation":"Rowden Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.86","minimum_observed_gross_demand__mva_":"3.56","contracted_demand_excl_bess__mva_":"10.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.38","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-32","Substation Reinforcement Completion Date":"Oct-32"}},{"id":"E - MELK - 22","name":"Sutton Benger Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"437","AssetID":"E - MELK - 22","map___license_area":"England / SEPD","Substation":"Sutton Benger Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.81","minimum_observed_gross_demand__mva_":"0.84","contracted_demand_excl_bess__mva_":"9.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.20","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":"Jan-28"}},{"id":"E - MELK - 23","name":"Tetbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"438","AssetID":"E - MELK - 23","map___license_area":"England / SEPD","Substation":"Tetbury Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.99","minimum_observed_gross_demand__mva_":"1.33","contracted_demand_excl_bess__mva_":"2.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.59","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 24","name":"Yatton Keynell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Chippenham BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"439","AssetID":"E - MELK - 24","map___license_area":"England / SEPD","Substation":"Yatton Keynell Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Chippenham BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.67","minimum_observed_gross_demand__mva_":"0.67","contracted_demand_excl_bess__mva_":"2.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-28","Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 25","name":"Bruton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"1.79","value":"1.79","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"440","AssetID":"E - MELK - 25","map___license_area":"England / SEPD","Substation":"Bruton Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.10","minimum_observed_gross_demand__mva_":"0.78","contracted_demand_excl_bess__mva_":"1.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.79","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"1.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"0.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 26","name":"Codford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"1.56","value":"1.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"441","AssetID":"E - MELK - 26","map___license_area":"England / SEPD","Substation":"Codford Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.37","minimum_observed_gross_demand__mva_":"0.71","contracted_demand_excl_bess__mva_":"1.74","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"1.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 27","name":"Crockerton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"442","AssetID":"E - MELK - 27","map___license_area":"England / SEPD","Substation":"Crockerton Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.94","minimum_observed_gross_demand__mva_":"2.65","contracted_demand_excl_bess__mva_":"1.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"1.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.63","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 28","name":"Frome Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"12.71","value":"12.71","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"443","AssetID":"E - MELK - 28","map___license_area":"England / SEPD","Substation":"Frome Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.41","minimum_observed_gross_demand__mva_":"5.73","contracted_demand_excl_bess__mva_":"9.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.71","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"2.41","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 29","name":"Hawkeridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"3.31","value":"3.31","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"444","AssetID":"E - MELK - 29","map___license_area":"England / SEPD","Substation":"Hawkeridge Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.53","minimum_observed_gross_demand__mva_":"1.81","contracted_demand_excl_bess__mva_":"0.10","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.31","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"7.60","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 30","name":"Holwell Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"1.09","value":"1.09","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"445","AssetID":"E - MELK - 30","map___license_area":"England / SEPD","Substation":"Holwell Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.35","minimum_observed_gross_demand__mva_":"1.78","contracted_demand_excl_bess__mva_":"0.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.09","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 31","name":"Warminster Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"7.05","value":"7.05","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"446","AssetID":"E - MELK - 31","map___license_area":"England / SEPD","Substation":"Warminster Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.16","minimum_observed_gross_demand__mva_":"1.27","contracted_demand_excl_bess__mva_":"6.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.05","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"8.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 32","name":"Westbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Frome BSP","demand":{"raw":"10.38","value":"10.38","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"447","AssetID":"E - MELK - 32","map___license_area":"England / SEPD","Substation":"Westbury Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Frome BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.70","minimum_observed_gross_demand__mva_":"2.65","contracted_demand_excl_bess__mva_":"3.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.38","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"2.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 33","name":"Ashton Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"448","AssetID":"E - MELK - 33","map___license_area":"England / SEPD","Substation":"Ashton Park Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.18","minimum_observed_gross_demand__mva_":"2.62","contracted_demand_excl_bess__mva_":"19.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"3.80","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":"Mar-33","Substation Reinforcement Completion Date":"Mar-33"}},{"id":"E - MELK - 34","name":"Bradford-On-Avon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"449","AssetID":"E - MELK - 34","map___license_area":"England / SEPD","Substation":"Bradford-On-Avon Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.33","minimum_observed_gross_demand__mva_":"2.28","contracted_demand_excl_bess__mva_":"2.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 35","name":"Bromham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"450","AssetID":"E - MELK - 35","map___license_area":"England / SEPD","Substation":"Bromham Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.19","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"0.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.38","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 36","name":"Corsham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"451","AssetID":"E - MELK - 36","map___license_area":"England / SEPD","Substation":"Corsham Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.14","minimum_observed_gross_demand__mva_":"2.25","contracted_demand_excl_bess__mva_":"1.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.11","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 37","name":"Devizes Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"452","AssetID":"E - MELK - 37","map___license_area":"England / SEPD","Substation":"Devizes Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.51","minimum_observed_gross_demand__mva_":"5.64","contracted_demand_excl_bess__mva_":"4.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"1.30","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-26"}},{"id":"E - MELK - 38","name":"Easterton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"453","AssetID":"E - MELK - 38","map___license_area":"England / SEPD","Substation":"Easterton Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.00","minimum_observed_gross_demand__mva_":"1.15","contracted_demand_excl_bess__mva_":"1.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 39","name":"Melksham Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"454","AssetID":"E - MELK - 39","map___license_area":"England / SEPD","Substation":"Melksham Town Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.96","minimum_observed_gross_demand__mva_":"3.74","contracted_demand_excl_bess__mva_":"8.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"8.74","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 40","name":"Spring Quarry West Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"455","AssetID":"E - MELK - 40","map___license_area":"England / SEPD","Substation":"Spring Quarry West Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.23","minimum_observed_gross_demand__mva_":"1.88","contracted_demand_excl_bess__mva_":"0.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"7.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 41","name":"Trowbridge Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"Norrington BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"456","AssetID":"E - MELK - 41","map___license_area":"England / SEPD","Substation":"Trowbridge Town Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"Norrington BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 26MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.56","minimum_observed_gross_demand__mva_":"4.17","contracted_demand_excl_bess__mva_":"5.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.11","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 42","name":"Marlborough South Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"West Grafton BSP","demand":{"raw":"1.49","value":"1.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"457","AssetID":"E - MELK - 42","map___license_area":"England / SEPD","Substation":"Marlborough South Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"West Grafton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.77","minimum_observed_gross_demand__mva_":"4.00","contracted_demand_excl_bess__mva_":"1.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 43","name":"Ramsbury Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"West Grafton BSP","demand":{"raw":"4.60","value":"4.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"458","AssetID":"E - MELK - 43","map___license_area":"England / SEPD","Substation":"Ramsbury Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"West Grafton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.35","minimum_observed_gross_demand__mva_":"0.49","contracted_demand_excl_bess__mva_":"1.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 44","name":"Tidworth Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"West Grafton BSP","demand":{"raw":"6.68","value":"6.68","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"459","AssetID":"E - MELK - 44","map___license_area":"England / SEPD","Substation":"Tidworth Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"West Grafton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.80","minimum_observed_gross_demand__mva_":"2.39","contracted_demand_excl_bess__mva_":"3.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.68","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.37","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MELK - 45","name":"West Grafton Village Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Melksham GSP","upstreamBsp":"West Grafton BSP","demand":{"raw":"3.61","value":"3.61","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"460","AssetID":"E - MELK - 45","map___license_area":"England / SEPD","Substation":"West Grafton Village Primary","Upstream GSP":"Melksham GSP","Upstream BSP":"West Grafton BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.27","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"1.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.61","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 01","name":"Minety GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"321.11","technicalLimits":"Yes","rawSource":{"_id":"461","AssetID":"E - MITY - 01","map___license_area":"England / SEPD","Substation":"Minety GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"4 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"356.66","minimum_observed_gross_demand__mva_":"22.00","contracted_demand_excl_bess__mva_":"278.40","contracted_bess_demand__mva_":"321.11","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"475.79","contracted_generation__mw_":"841.39","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"21.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 02","name":"Cirencester BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"49.30","value":"49.30","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"12.58","technicalLimits":"Yes","rawSource":{"_id":"462","AssetID":"E - MITY - 02","map___license_area":"England / SEPD","Substation":"Cirencester BSP","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"57.00","minimum_observed_gross_demand__mva_":"15.91","contracted_demand_excl_bess__mva_":"15.71","contracted_bess_demand__mva_":"12.58","estimated_demand_headroom__mva_":"49.30","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"53.87","contracted_generation__mw_":"120.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.67","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-28","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 03","name":"Stratton (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"57.99","value":"57.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"25.00","technicalLimits":"Yes","rawSource":{"_id":"463","AssetID":"E - MITY - 03","map___license_area":"England / SEPD","Substation":"Stratton (Main) BSP","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"48.65","minimum_observed_gross_demand__mva_":"14.73","contracted_demand_excl_bess__mva_":"15.69","contracted_bess_demand__mva_":"25.00","estimated_demand_headroom__mva_":"57.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"78.95","contracted_generation__mw_":"48.30","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"14.76","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 04","name":"Stratton (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"76.13","technicalLimits":"Yes","rawSource":{"_id":"464","AssetID":"E - MITY - 04","map___license_area":"England / SEPD","Substation":"Stratton (Reserve) BSP","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"49.75","minimum_observed_gross_demand__mva_":"14.30","contracted_demand_excl_bess__mva_":"45.49","contracted_bess_demand__mva_":"76.13","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"64.09","contracted_generation__mw_":"104.29","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"14.56","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-26"}},{"id":"E - MITY - 05","name":"Swindon BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"39.37","value":"39.37","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"465","AssetID":"E - MITY - 05","map___license_area":"England / SEPD","Substation":"Swindon BSP","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 65 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"65.28","minimum_observed_gross_demand__mva_":"12.35","contracted_demand_excl_bess__mva_":"21.66","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"39.37","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"69.60","contracted_generation__mw_":"3.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"16.42","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - MITY - 06","name":"Toothill BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"42.56","value":"42.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"41.05","technicalLimits":"Yes","rawSource":{"_id":"466","AssetID":"E - MITY - 06","map___license_area":"England / SEPD","Substation":"Toothill BSP","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 22.5 / 45MVA + 1 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"44.22","minimum_observed_gross_demand__mva_":"16.27","contracted_demand_excl_bess__mva_":"40.26","contracted_bess_demand__mva_":"41.05","estimated_demand_headroom__mva_":"42.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"61.06","contracted_generation__mw_":"39.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"13.68","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"E - MITY - 07","name":"Galileo Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"N/A","demand":{"raw":"30.38","value":"30.38","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"467","AssetID":"E - MITY - 07","map___license_area":"England / SEPD","Substation":"Galileo Primary","Upstream GSP":"Minety GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 22.5 / 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.10","minimum_observed_gross_demand__mva_":"3.95","contracted_demand_excl_bess__mva_":"4.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"30.38","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 08","name":"Cirencester Town Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"468","AssetID":"E - MITY - 08","map___license_area":"England / SEPD","Substation":"Cirencester Town Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.92","minimum_observed_gross_demand__mva_":"3.11","contracted_demand_excl_bess__mva_":"11.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"1.04","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-28"}},{"id":"E - MITY - 09","name":"Cricklade Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"4.73","value":"4.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"469","AssetID":"E - MITY - 09","map___license_area":"England / SEPD","Substation":"Cricklade Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.46","minimum_observed_gross_demand__mva_":"1.75","contracted_demand_excl_bess__mva_":"1.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-30","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 10","name":"Fairford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"5.66","value":"5.66","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"470","AssetID":"E - MITY - 10","map___license_area":"England / SEPD","Substation":"Fairford Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.31","minimum_observed_gross_demand__mva_":"1.99","contracted_demand_excl_bess__mva_":"2.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.66","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.54","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 11","name":"Kemble RAF Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"11.01","value":"11.01","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"471","AssetID":"E - MITY - 11","map___license_area":"England / SEPD","Substation":"Kemble RAF Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.57","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"0.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.01","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"3.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 12","name":"Minety Village Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"12.19","value":"12.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"472","AssetID":"E - MITY - 12","map___license_area":"England / SEPD","Substation":"Minety Village Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.94","minimum_observed_gross_demand__mva_":"0.70","contracted_demand_excl_bess__mva_":"0.25","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.38","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-30","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 13","name":"Northleach Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"6.94","value":"6.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"473","AssetID":"E - MITY - 13","map___license_area":"England / SEPD","Substation":"Northleach Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.61","minimum_observed_gross_demand__mva_":"1.37","contracted_demand_excl_bess__mva_":"0.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 14","name":"Shipton Oliffe Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"0.84","value":"0.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"474","AssetID":"E - MITY - 14","map___license_area":"England / SEPD","Substation":"Shipton Oliffe Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.78","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 15","name":"Whiteway Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Cirencester BSP","demand":{"raw":"18.54","value":"18.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"475","AssetID":"E - MITY - 15","map___license_area":"England / SEPD","Substation":"Whiteway Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Cirencester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.31","minimum_observed_gross_demand__mva_":"1.40","contracted_demand_excl_bess__mva_":"0.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 16","name":"Drakes Way Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Main) BSP","demand":{"raw":"11.00","value":"11.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"476","AssetID":"E - MITY - 16","map___license_area":"England / SEPD","Substation":"Drakes Way Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.92","minimum_observed_gross_demand__mva_":"1.40","contracted_demand_excl_bess__mva_":"0.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 17","name":"Park North Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Main) BSP","demand":{"raw":"8.25","value":"8.25","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"477","AssetID":"E - MITY - 17","map___license_area":"England / SEPD","Substation":"Park North Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.81","minimum_observed_gross_demand__mva_":"4.58","contracted_demand_excl_bess__mva_":"4.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.25","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 18","name":"Plessey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Main) BSP","demand":{"raw":"6.02","value":"6.02","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"478","AssetID":"E - MITY - 18","map___license_area":"England / SEPD","Substation":"Plessey Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.94","minimum_observed_gross_demand__mva_":"1.82","contracted_demand_excl_bess__mva_":"2.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.02","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"9.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 19","name":"Pressed Steel Swindon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Main) BSP","demand":{"raw":"37.80","value":"37.80","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"479","AssetID":"E - MITY - 19","map___license_area":"England / SEPD","Substation":"Pressed Steel Swindon Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.62","minimum_observed_gross_demand__mva_":"1.56","contracted_demand_excl_bess__mva_":"7.54","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"37.80","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - MITY - 20","name":"Black Bourton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"480","AssetID":"E - MITY - 20","map___license_area":"England / SEPD","Substation":"Black Bourton Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.73","minimum_observed_gross_demand__mva_":"0.93","contracted_demand_excl_bess__mva_":"0.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 21","name":"Faringdon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"481","AssetID":"E - MITY - 21","map___license_area":"England / SEPD","Substation":"Faringdon Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 11.43MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.89","minimum_observed_gross_demand__mva_":"2.29","contracted_demand_excl_bess__mva_":"12.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-28","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 22","name":"Lechlade Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"482","AssetID":"E - MITY - 22","map___license_area":"England / SEPD","Substation":"Lechlade Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.56","minimum_observed_gross_demand__mva_":"0.80","contracted_demand_excl_bess__mva_":"0.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.38","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 23","name":"Shrivenham Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"483","AssetID":"E - MITY - 23","map___license_area":"England / SEPD","Substation":"Shrivenham Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.53","minimum_observed_gross_demand__mva_":"1.24","contracted_demand_excl_bess__mva_":"0.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 24","name":"Stanton Fitzwarren Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"1.85","value":"1.85","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"484","AssetID":"E - MITY - 24","map___license_area":"England / SEPD","Substation":"Stanton Fitzwarren Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.21","minimum_observed_gross_demand__mva_":"2.09","contracted_demand_excl_bess__mva_":"8.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.85","Substation Demand RAG Status":"Amber","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"7.97","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.46","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jul-26","Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 25","name":"Stratton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Stratton (Reserve) BSP","demand":{"raw":"1.42","value":"1.42","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"485","AssetID":"E - MITY - 25","map___license_area":"England / SEPD","Substation":"Stratton Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Stratton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.24","minimum_observed_gross_demand__mva_":"3.07","contracted_demand_excl_bess__mva_":"19.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.42","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"17.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 26","name":"Manchester Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Swindon BSP","demand":{"raw":"30.00","value":"30.00","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"486","AssetID":"E - MITY - 26","map___license_area":"England / SEPD","Substation":"Manchester Road Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Swindon BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.21","minimum_observed_gross_demand__mva_":"6.63","contracted_demand_excl_bess__mva_":"5.99","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"30.00","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.13","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.97","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 27","name":"Swindon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Swindon BSP","demand":{"raw":"25.20","value":"25.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"487","AssetID":"E - MITY - 27","map___license_area":"England / SEPD","Substation":"Swindon Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Swindon BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.83","minimum_observed_gross_demand__mva_":"6.26","contracted_demand_excl_bess__mva_":"4.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"25.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"2.38","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 28","name":"Trading Estate Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Swindon BSP","demand":{"raw":"8.21","value":"8.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"488","AssetID":"E - MITY - 28","map___license_area":"England / SEPD","Substation":"Trading Estate Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Swindon BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.90","minimum_observed_gross_demand__mva_":"2.01","contracted_demand_excl_bess__mva_":"5.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.27","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 29","name":"Wootton Bassett Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Swindon BSP","demand":{"raw":"9.61","value":"9.61","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"489","AssetID":"E - MITY - 29","map___license_area":"England / SEPD","Substation":"Wootton Bassett Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Swindon BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.96","minimum_observed_gross_demand__mva_":"1.72","contracted_demand_excl_bess__mva_":"2.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.61","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Upstream Fault Level Constraint","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 30","name":"Chisledon Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Toothill BSP","demand":{"raw":"10.42","value":"10.42","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"490","AssetID":"E - MITY - 30","map___license_area":"England / SEPD","Substation":"Chisledon Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Toothill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.38","minimum_observed_gross_demand__mva_":"0.49","contracted_demand_excl_bess__mva_":"0.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.42","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 31","name":"Dorcan South Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Toothill BSP","demand":{"raw":"11.94","value":"11.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"491","AssetID":"E - MITY - 31","map___license_area":"England / SEPD","Substation":"Dorcan South Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Toothill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.89","minimum_observed_gross_demand__mva_":"2.35","contracted_demand_excl_bess__mva_":"6.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 32","name":"Quarry Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Toothill BSP","demand":{"raw":"7.60","value":"7.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"492","AssetID":"E - MITY - 32","map___license_area":"England / SEPD","Substation":"Quarry Road Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Toothill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.57","minimum_observed_gross_demand__mva_":"2.70","contracted_demand_excl_bess__mva_":"0.90","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 33","name":"Toothill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Toothill BSP","demand":{"raw":"13.60","value":"13.60","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"493","AssetID":"E - MITY - 33","map___license_area":"England / SEPD","Substation":"Toothill Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Toothill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.65","minimum_observed_gross_demand__mva_":"3.52","contracted_demand_excl_bess__mva_":"2.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.60","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"15.68","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - MITY - 34","name":"Wroughton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Minety GSP","upstreamBsp":"Toothill BSP","demand":{"raw":"11.06","value":"11.06","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"494","AssetID":"E - MITY - 34","map___license_area":"England / SEPD","Substation":"Wroughton Primary","Upstream GSP":"Minety GSP","Upstream BSP":"Toothill BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.53","minimum_observed_gross_demand__mva_":"3.00","contracted_demand_excl_bess__mva_":"4.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.06","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"1MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"16.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"E - NHYD - 01","name":"North Hyde GSP","area":"England / SEPD","level":"GSP","voltageKv":"275 / 66","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"495","AssetID":"E - NHYD - 01","map___license_area":"England / SEPD","Substation":"North Hyde GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 66","Transformer Nameplate Ratings":"3 x 180MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"190.52","minimum_observed_gross_demand__mva_":"32.14","contracted_demand_excl_bess__mva_":"94.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"11.62","contracted_generation__mw_":"0.96","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"18.42","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"E - NHYD - 02","name":"North Hyde BSP","area":"England / SEPD","level":"BSP","voltageKv":"66 / 22","upstreamGsp":"North Hyde GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"95.49","value":"95.49","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"496","AssetID":"E - NHYD - 02","map___license_area":"England / SEPD","Substation":"North Hyde BSP","Upstream GSP":"North Hyde GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"66 / 22","Transformer Nameplate Ratings":"1 x 20 / 40MVA + 2 x 20 / 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"29.23","minimum_observed_gross_demand__mva_":"5.25","contracted_demand_excl_bess__mva_":"10.34","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"95.49","unsafe_3_phase_break_fault_rating__ka_":"19.70","unsafe_3_phase_break_fault_level__ka_":"6.92","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - NHYD - 03","name":"Hayes Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"North Hyde GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"65.23","value":"65.23","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"497","AssetID":"E - NHYD - 03","map___license_area":"England / SEPD","Substation":"Hayes Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.58","minimum_observed_gross_demand__mva_":"9.17","contracted_demand_excl_bess__mva_":"22.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.95","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"65.23","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"9.91","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Jan-30","Substation Reinforcement Completion Date":"Jan-30"}},{"id":"E - NHYD - 04","name":"North Hyde Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"North Hyde GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"94.26","value":"94.26","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"498","AssetID":"E - NHYD - 04","map___license_area":"England / SEPD","Substation":"North Hyde Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"46.34","minimum_observed_gross_demand__mva_":"20.11","contracted_demand_excl_bess__mva_":"20.39","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"1.85","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"94.26","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"19.34","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"E - NHYD - 05","name":"Vicarage Farm Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"North Hyde GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"41.91","value":"41.91","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"499","AssetID":"E - NHYD - 05","map___license_area":"England / SEPD","Substation":"Vicarage Farm Road Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.42","minimum_observed_gross_demand__mva_":"5.78","contracted_demand_excl_bess__mva_":"41.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"41.91","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.74","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":"Mar-28"}},{"id":"E - NHYD - 06","name":"Bath Road East Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 11","upstreamGsp":"North Hyde GSP","upstreamBsp":"North Hyde BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"11.73","value":"11.73","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"500","AssetID":"E - NHYD - 06","map___license_area":"England / SEPD","Substation":"Bath Road East Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"North Hyde BSP","Substation Type":"Primary","voltage__kv_":"22 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.58","minimum_observed_gross_demand__mva_":"2.23","contracted_demand_excl_bess__mva_":"4.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"11.73","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.11","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-29"}},{"id":"E - NHYD - 07","name":"Springfield Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"North Hyde GSP","upstreamBsp":"North Hyde BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"25.01","value":"25.01","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"501","AssetID":"E - NHYD - 07","map___license_area":"England / SEPD","Substation":"Springfield Road Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"North Hyde BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"3 x 10 / 11.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.48","minimum_observed_gross_demand__mva_":"3.17","contracted_demand_excl_bess__mva_":"1.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"25.01","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.03","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-30","Substation Reinforcement Completion Date":"Jun-30"}},{"id":"E - NHYD - 08","name":"The Green Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"North Hyde GSP","upstreamBsp":"North Hyde BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"13.51","value":"13.51","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"502","AssetID":"E - NHYD - 08","map___license_area":"England / SEPD","Substation":"The Green Primary","Upstream GSP":"North Hyde GSP","Upstream BSP":"North Hyde BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.03","minimum_observed_gross_demand__mva_":"1.63","contracted_demand_excl_bess__mva_":"4.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"13.51","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.41","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 01","name":"Nursling GSP","area":"England / SEPD","level":"GSP","voltageKv":"400 / 132","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"789.58","technicalLimits":"Yes","rawSource":{"_id":"503","AssetID":"E - NURS - 01","map___license_area":"England / SEPD","Substation":"Nursling GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 132","Transformer Nameplate Ratings":"3 x 240MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"316.99","minimum_observed_gross_demand__mva_":"79.63","contracted_demand_excl_bess__mva_":"188.74","contracted_bess_demand__mva_":"789.58","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"198.69","contracted_generation__mw_":"908.65","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"14.93","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-31"}},{"id":"E - NURS - 02","name":"Rownhams BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"57.37","technicalLimits":"Yes","rawSource":{"_id":"504","AssetID":"E - NURS - 02","map___license_area":"England / SEPD","Substation":"Rownhams BSP","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"90.82","minimum_observed_gross_demand__mva_":"21.51","contracted_demand_excl_bess__mva_":"53.08","contracted_bess_demand__mva_":"57.37","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"39.60","contracted_generation__mw_":"54.95","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - NURS - 03","name":"Southampton (Main) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"40.40","value":"40.40","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"505","AssetID":"E - NURS - 03","map___license_area":"England / SEPD","Substation":"Southampton (Main) BSP","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"50.46","minimum_observed_gross_demand__mva_":"10.89","contracted_demand_excl_bess__mva_":"37.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"40.40","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.48","contracted_generation__mw_":"0.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"10.75","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 04","name":"Southampton (Reserve) BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"12.63","technicalLimits":"Yes","rawSource":{"_id":"506","AssetID":"E - NURS - 04","map___license_area":"England / SEPD","Substation":"Southampton (Reserve) BSP","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"64.50","minimum_observed_gross_demand__mva_":"10.58","contracted_demand_excl_bess__mva_":"29.70","contracted_bess_demand__mva_":"12.63","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"6.56","contracted_generation__mw_":"3.60","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"11.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Mar-30"}},{"id":"E - NURS - 05","name":"Velmore BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"60.00","technicalLimits":"Yes","rawSource":{"_id":"507","AssetID":"E - NURS - 05","map___license_area":"England / SEPD","Substation":"Velmore BSP","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45 / 90MVA + 1 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"98.10","minimum_observed_gross_demand__mva_":"22.60","contracted_demand_excl_bess__mva_":"51.14","contracted_bess_demand__mva_":"60.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"26.38","contracted_generation__mw_":"57.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-29"}},{"id":"E - NURS - 06","name":"Winchester BSP","area":"England / SEPD","level":"BSP","voltageKv":"132 / 33","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"29.67","value":"29.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"55.00","technicalLimits":"Yes","rawSource":{"_id":"508","AssetID":"E - NURS - 06","map___license_area":"England / SEPD","Substation":"Winchester BSP","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45 / 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"78.29","minimum_observed_gross_demand__mva_":"11.28","contracted_demand_excl_bess__mva_":"15.50","contracted_bess_demand__mva_":"55.00","estimated_demand_headroom__mva_":"29.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"52.77","contracted_generation__mw_":"72.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"13.18","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-28"}},{"id":"E - NURS - 07","name":"Marchwood Primary","area":"England / SEPD","level":"Primary","voltageKv":"132 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"N/A","demand":{"raw":"11.15","value":"11.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"509","AssetID":"E - NURS - 07","map___license_area":"England / SEPD","Substation":"Marchwood Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 15 / 17MVA + 1 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.70","minimum_observed_gross_demand__mva_":"0.53","contracted_demand_excl_bess__mva_":"1.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"19.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.85","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 08","name":"Fletchwood Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"5.26","technicalLimits":"Yes","rawSource":{"_id":"510","AssetID":"E - NURS - 08","map___license_area":"England / SEPD","Substation":"Fletchwood Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.36","minimum_observed_gross_demand__mva_":"4.27","contracted_demand_excl_bess__mva_":"9.08","contracted_bess_demand__mva_":"5.26","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"5.45","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 09","name":"Lordshill Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"511","AssetID":"E - NURS - 09","map___license_area":"England / SEPD","Substation":"Lordshill Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.30","minimum_observed_gross_demand__mva_":"1.66","contracted_demand_excl_bess__mva_":"7.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 10","name":"Maybush Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"512","AssetID":"E - NURS - 10","map___license_area":"England / SEPD","Substation":"Maybush Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 15 / 22.5MVA + 1 x 20 / 26MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.26","minimum_observed_gross_demand__mva_":"2.73","contracted_demand_excl_bess__mva_":"4.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 11","name":"North Baddesley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"513","AssetID":"E - NURS - 11","map___license_area":"England / SEPD","Substation":"North Baddesley Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.20","minimum_observed_gross_demand__mva_":"1.76","contracted_demand_excl_bess__mva_":"15.29","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":"Aug-26","Substation Reinforcement Completion Date":"Apr-27"}},{"id":"E - NURS - 12","name":"Romsey Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"514","AssetID":"E - NURS - 12","map___license_area":"England / SEPD","Substation":"Romsey Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.34","minimum_observed_gross_demand__mva_":"2.50","contracted_demand_excl_bess__mva_":"5.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Sep-27"}},{"id":"E - NURS - 13","name":"Silkstead Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"515","AssetID":"E - NURS - 13","map___license_area":"England / SEPD","Substation":"Silkstead Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.41","minimum_observed_gross_demand__mva_":"1.36","contracted_demand_excl_bess__mva_":"2.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.35","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 14","name":"Totton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Rownhams BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"516","AssetID":"E - NURS - 14","map___license_area":"England / SEPD","Substation":"Totton Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Rownhams BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 20MVA + 1 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.75","minimum_observed_gross_demand__mva_":"2.91","contracted_demand_excl_bess__mva_":"8.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 15","name":"Regents Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Main) BSP","demand":{"raw":"14.29","value":"14.29","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"517","AssetID":"E - NURS - 15","map___license_area":"England / SEPD","Substation":"Regents Park Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.37","minimum_observed_gross_demand__mva_":"2.88","contracted_demand_excl_bess__mva_":"1.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"14.29","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"1.48","contracted_generation__mw_":"0.16","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 16","name":"Shirley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Main) BSP","demand":{"raw":"9.44","value":"9.44","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"518","AssetID":"E - NURS - 16","map___license_area":"England / SEPD","Substation":"Shirley Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.33","minimum_observed_gross_demand__mva_":"3.27","contracted_demand_excl_bess__mva_":"9.29","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.44","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.68","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 17","name":"Western Esplanade Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Main) BSP","demand":{"raw":"30.14","value":"30.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"519","AssetID":"E - NURS - 17","map___license_area":"England / SEPD","Substation":"Western Esplanade Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.84","minimum_observed_gross_demand__mva_":"5.14","contracted_demand_excl_bess__mva_":"6.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"30.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.85","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 18","name":"Woodmill Lane Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 6.6","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Main) BSP","demand":{"raw":"13.41","value":"13.41","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"520","AssetID":"E - NURS - 18","map___license_area":"England / SEPD","Substation":"Woodmill Lane Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Main) BSP","Substation Type":"Primary","voltage__kv_":"33 / 6.6","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.13","minimum_observed_gross_demand__mva_":"1.79","contracted_demand_excl_bess__mva_":"3.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.41","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 19","name":"Bevois Valley Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 6.6","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"521","AssetID":"E - NURS - 19","map___license_area":"England / SEPD","Substation":"Bevois Valley Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 6.6","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.52","minimum_observed_gross_demand__mva_":"3.62","contracted_demand_excl_bess__mva_":"3.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 20","name":"Central Bridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"522","AssetID":"E - NURS - 20","map___license_area":"England / SEPD","Substation":"Central Bridge Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x  20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.32","minimum_observed_gross_demand__mva_":"2.99","contracted_demand_excl_bess__mva_":"2.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.97","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 21","name":"Chapel Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 6.6","upstreamGsp":"Nursling GSP","upstreamBsp":"Southampton (Reserve) BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"523","AssetID":"E - NURS - 21","map___license_area":"England / SEPD","Substation":"Chapel Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Southampton (Reserve) BSP","Substation Type":"Primary","voltage__kv_":"33 / 6.6","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.58","minimum_observed_gross_demand__mva_":"1.98","contracted_demand_excl_bess__mva_":"3.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-26"}},{"id":"E - NURS - 22","name":"Bassett Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"524","AssetID":"E - NURS - 22","map___license_area":"England / SEPD","Substation":"Bassett Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.26","minimum_observed_gross_demand__mva_":"2.95","contracted_demand_excl_bess__mva_":"4.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"13.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 23","name":"Bishopstoke Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"525","AssetID":"E - NURS - 23","map___license_area":"England / SEPD","Substation":"Bishopstoke Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.51","minimum_observed_gross_demand__mva_":"0.79","contracted_demand_excl_bess__mva_":"3.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 24","name":"Chandlers Ford Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"526","AssetID":"E - NURS - 24","map___license_area":"England / SEPD","Substation":"Chandlers Ford Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.00","minimum_observed_gross_demand__mva_":"2.91","contracted_demand_excl_bess__mva_":"4.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.95","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 25","name":"Eastleigh North Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"527","AssetID":"E - NURS - 25","map___license_area":"England / SEPD","Substation":"Eastleigh North Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.75","minimum_observed_gross_demand__mva_":"5.81","contracted_demand_excl_bess__mva_":"5.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.03","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"12.81","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 26","name":"Hedge End Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"528","AssetID":"E - NURS - 26","map___license_area":"England / SEPD","Substation":"Hedge End Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.08","minimum_observed_gross_demand__mva_":"1.73","contracted_demand_excl_bess__mva_":"17.93","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 27","name":"Velmore Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Velmore BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"529","AssetID":"E - NURS - 27","map___license_area":"England / SEPD","Substation":"Velmore Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Velmore BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.27","minimum_observed_gross_demand__mva_":"7.33","contracted_demand_excl_bess__mva_":"3.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 28","name":"Dunbridge Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Winchester BSP","demand":{"raw":"2.65","value":"2.65","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"530","AssetID":"E - NURS - 28","map___license_area":"England / SEPD","Substation":"Dunbridge Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Winchester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5MVA + 1 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.40","minimum_observed_gross_demand__mva_":"0.92","contracted_demand_excl_bess__mva_":"1.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.65","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Apr-28"}},{"id":"E - NURS - 29","name":"Gordon Road Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Winchester BSP","demand":{"raw":"7.28","value":"7.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"531","AssetID":"E - NURS - 29","map___license_area":"England / SEPD","Substation":"Gordon Road Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Winchester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"20.02","minimum_observed_gross_demand__mva_":"3.34","contracted_demand_excl_bess__mva_":"4.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 30","name":"Harestock Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Winchester BSP","demand":{"raw":"10.52","value":"10.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"532","AssetID":"E - NURS - 30","map___license_area":"England / SEPD","Substation":"Harestock Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Winchester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.93","minimum_observed_gross_demand__mva_":"4.00","contracted_demand_excl_bess__mva_":"6.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.80","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 31","name":"Houghton Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Winchester BSP","demand":{"raw":"9.45","value":"9.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"533","AssetID":"E - NURS - 31","map___license_area":"England / SEPD","Substation":"Houghton Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Winchester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.24","minimum_observed_gross_demand__mva_":"0.90","contracted_demand_excl_bess__mva_":"1.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"5MW","connected_generation__mw_":"0.42","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.81","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - NURS - 32","name":"St Cross Primary","area":"England / SEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nursling GSP","upstreamBsp":"Winchester BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"534","AssetID":"E - NURS - 32","map___license_area":"England / SEPD","Substation":"St Cross Primary","Upstream GSP":"Nursling GSP","Upstream BSP":"Winchester BSP","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.26","minimum_observed_gross_demand__mva_":"4.99","contracted_demand_excl_bess__mva_":"2.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"14.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity & Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 01","name":"Willesden GSP","area":"England / SEPD","level":"GSP","voltageKv":"275 / 66","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"535","AssetID":"E - WISD - 01","map___license_area":"England / SEPD","Substation":"Willesden GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 66","Transformer Nameplate Ratings":"3 x 180MVA (Shared with UKPN)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"139.12","minimum_observed_gross_demand__mva_":"59.15","contracted_demand_excl_bess__mva_":"107.39","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.76","contracted_generation__mw_":"0.18","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"21.90","unsafe_3_phase_break_fault_level__ka_":"10.02","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-26","Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 02","name":"Acton Lane BSP","area":"England / SEPD","level":"BSP","voltageKv":"66 / 22","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"84.19","value":"84.19","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"536","AssetID":"E - WISD - 02","map___license_area":"England / SEPD","Substation":"Acton Lane BSP","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"BSP","voltage__kv_":"66 / 22","Transformer Nameplate Ratings":"4 x 40MVA (Shared with UKPN)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"35.67","minimum_observed_gross_demand__mva_":"8.19","contracted_demand_excl_bess__mva_":"17.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"84.19","unsafe_3_phase_break_fault_rating__ka_":"19.70","unsafe_3_phase_break_fault_level__ka_":"14.12","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-29"}},{"id":"E - WISD - 03","name":"Canal Bank 11kV Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"62.93","value":"62.93","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"537","AssetID":"E - WISD - 03","map___license_area":"England / SEPD","Substation":"Canal Bank 11kV Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"31.54","minimum_observed_gross_demand__mva_":"8.62","contracted_demand_excl_bess__mva_":"22.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"2.69","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"62.93","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.58","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 04","name":"Greenford Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"69.59","value":"69.59","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"538","AssetID":"E - WISD - 04","map___license_area":"England / SEPD","Substation":"Greenford Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"35.40","minimum_observed_gross_demand__mva_":"12.59","contracted_demand_excl_bess__mva_":"31.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"69.59","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"11.30","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 05","name":"Perivale Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"78.22","value":"78.22","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"539","AssetID":"E - WISD - 05","map___license_area":"England / SEPD","Substation":"Perivale Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.29","minimum_observed_gross_demand__mva_":"6.09","contracted_demand_excl_bess__mva_":"16.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.18","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"78.22","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.60","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 06","name":"Volt Avenue Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"76.81","value":"76.81","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"540","AssetID":"E - WISD - 06","map___license_area":"England / SEPD","Substation":"Volt Avenue Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.95","minimum_observed_gross_demand__mva_":"19.81","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"76.81","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.23","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 07","name":"Wesley Avenue Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"60.32","value":"60.32","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"541","AssetID":"E - WISD - 07","map___license_area":"England / SEPD","Substation":"Wesley Avenue Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"2 x 30 / 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.49","minimum_observed_gross_demand__mva_":"3.32","contracted_demand_excl_bess__mva_":"18.77","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"60.32","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.38","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-26"}},{"id":"E - WISD - 08","name":"Canal Bank 6.6kV Primary","area":"England / SEPD","level":"Primary","voltageKv":"66 / 11","upstreamGsp":"Willesden GSP","upstreamBsp":"Acton Lane BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"22.53","value":"22.53","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"542","AssetID":"E - WISD - 08","map___license_area":"England / SEPD","Substation":"Canal Bank 6.6kV Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"Acton Lane BSP","Substation Type":"Primary","voltage__kv_":"66 / 11","Transformer Nameplate Ratings":"3 x 10 / 12.5 MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.74","minimum_observed_gross_demand__mva_":"0.68","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"22.53","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.86","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-26","Substation Reinforcement Completion Date":"Mar-26"}},{"id":"E - WISD - 09","name":"Goldsmiths Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Willesden GSP","upstreamBsp":"Acton Lane BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"13.30","value":"13.30","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"543","AssetID":"E - WISD - 09","map___license_area":"England / SEPD","Substation":"Goldsmiths Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"Acton Lane BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"1 x 11.5MVA + 1 x 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.27","minimum_observed_gross_demand__mva_":"2.38","contracted_demand_excl_bess__mva_":"2.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"13.30","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.57","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"E - WISD - 10","name":"Leamington Park Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Willesden GSP","upstreamBsp":"Acton Lane BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"32.46","value":"32.46","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"544","AssetID":"E - WISD - 10","map___license_area":"England / SEPD","Substation":"Leamington Park Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"Acton Lane BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.01","minimum_observed_gross_demand__mva_":"2.06","contracted_demand_excl_bess__mva_":"7.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"32.46","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.70","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-27"}},{"id":"E - WISD - 11","name":"Park Royal Primary","area":"England / SEPD","level":"Primary","voltageKv":"22 / 6.6","upstreamGsp":"Willesden GSP","upstreamBsp":"Acton Lane BSP","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"12.33","value":"12.33","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"545","AssetID":"E - WISD - 11","map___license_area":"England / SEPD","Substation":"Park Royal Primary","Upstream GSP":"Willesden GSP","Upstream BSP":"Acton Lane BSP","Substation Type":"Primary","voltage__kv_":"22 / 6.6","Transformer Nameplate Ratings":"2 x 10 / 11.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.78","minimum_observed_gross_demand__mva_":"1.41","contracted_demand_excl_bess__mva_":"4.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"5MW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"12.33","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"12.90","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - ABNE - 01","name":"Abernethy GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"338.22","technicalLimits":"Yes","rawSource":{"_id":"546","AssetID":"S - ABNE - 01","map___license_area":"Scotland / SHEPD","Substation":"Abernethy GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"75.31","minimum_observed_gross_demand__mva_":"14.30","contracted_demand_excl_bess__mva_":"16.41","contracted_bess_demand__mva_":"338.22","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"79.63","contracted_generation__mw_":"456.87","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.94","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 02","name":"Abernethy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"1.05","value":"1.05","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"547","AssetID":"S - ABNE - 02","map___license_area":"Scotland / SHEPD","Substation":"Abernethy Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.83","minimum_observed_gross_demand__mva_":"0.26","contracted_demand_excl_bess__mva_":"0.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.05","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.93","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 03","name":"Balbeggie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"4.49","value":"4.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"548","AssetID":"S - ABNE - 03","map___license_area":"Scotland / SHEPD","Substation":"Balbeggie Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.91","minimum_observed_gross_demand__mva_":"0.56","contracted_demand_excl_bess__mva_":"0.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.00","unsafe_3_phase_break_fault_level__ka_":"3.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 04","name":"Bridge of Earn Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"10.81","value":"10.81","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"549","AssetID":"S - ABNE - 04","map___license_area":"Scotland / SHEPD","Substation":"Bridge of Earn Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.29","minimum_observed_gross_demand__mva_":"0.47","contracted_demand_excl_bess__mva_":"0.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.81","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"7.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 05","name":"Errol Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"550","AssetID":"S - ABNE - 05","map___license_area":"Scotland / SHEPD","Substation":"Errol Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.74","minimum_observed_gross_demand__mva_":"0.94","contracted_demand_excl_bess__mva_":"0.71","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.43","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.54","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 06","name":"Glendevon Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"551","AssetID":"S - ABNE - 06","map___license_area":"Scotland / SHEPD","Substation":"Glendevon Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.11","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"1.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.52","contracted_generation__mw_":"0.14","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-29","Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 07","name":"Milnathort Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"552","AssetID":"S - ABNE - 07","map___license_area":"Scotland / SHEPD","Substation":"Milnathort Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.93","minimum_observed_gross_demand__mva_":"1.72","contracted_demand_excl_bess__mva_":"6.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.13","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-29","Substation Reinforcement Completion Date":"Dec-29"}},{"id":"S - ABNE - 08","name":"Harbour Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"11.17","value":"11.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"553","AssetID":"S - ABNE - 08","map___license_area":"Scotland / SHEPD","Substation":"Harbour Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 9.5 / 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.62","minimum_observed_gross_demand__mva_":"2.24","contracted_demand_excl_bess__mva_":"2.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ABNE - 09","name":"Scone Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Abernethy GSP","upstreamBsp":"N/A","demand":{"raw":"7.99","value":"7.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"554","AssetID":"S - ABNE - 09","map___license_area":"Scotland / SHEPD","Substation":"Scone Primary","Upstream GSP":"Abernethy GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.96","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"3.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.13","contracted_generation__mw_":"1.58","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-26"}},{"id":"S - ALNE - 01","name":"Alness GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"178.05","technicalLimits":"No","rawSource":{"_id":"555","AssetID":"S - ALNE - 01","map___license_area":"Scotland / SHEPD","Substation":"Alness GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"30.49","minimum_observed_gross_demand__mva_":"13.44","contracted_demand_excl_bess__mva_":"26.51","contracted_bess_demand__mva_":"178.05","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"157.62","contracted_generation__mw_":"279.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.78","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 02","name":"Balaldie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"1.87","value":"1.87","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"556","AssetID":"S - ALNE - 02","map___license_area":"Scotland / SHEPD","Substation":"Balaldie Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.78","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"0.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.87","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 03","name":"Blackstand Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"4.07","value":"4.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"557","AssetID":"S - ALNE - 03","map___license_area":"Scotland / SHEPD","Substation":"Blackstand Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.92","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"0.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 04","name":"Contullich Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"0.09","value":"0.09","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"558","AssetID":"S - ALNE - 04","map___license_area":"Scotland / SHEPD","Substation":"Contullich Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.03","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.09","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 05","name":"Crosshills Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"3.98","value":"3.98","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"559","AssetID":"S - ALNE - 05","map___license_area":"Scotland / SHEPD","Substation":"Crosshills Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.51","minimum_observed_gross_demand__mva_":"1.62","contracted_demand_excl_bess__mva_":"4.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.98","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 06","name":"Glastullich Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"560","AssetID":"S - ALNE - 06","map___license_area":"Scotland / SHEPD","Substation":"Glastullich Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.41","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"0.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"26.20","unsafe_3_phase_break_fault_level__ka_":"3.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 07","name":"Invergordon Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"4.97","value":"4.97","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"561","AssetID":"S - ALNE - 07","map___license_area":"Scotland / SHEPD","Substation":"Invergordon Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.20","minimum_observed_gross_demand__mva_":"1.04","contracted_demand_excl_bess__mva_":"3.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.97","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"7.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.41","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 08","name":"Muirend Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"0.15","value":"0.15","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"562","AssetID":"S - ALNE - 08","map___license_area":"Scotland / SHEPD","Substation":"Muirend Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.65","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.15","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.15","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 09","name":"Nigg Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"0.33","value":"0.33","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"563","AssetID":"S - ALNE - 09","map___license_area":"Scotland / SHEPD","Substation":"Nigg Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.72","minimum_observed_gross_demand__mva_":"0.25","contracted_demand_excl_bess__mva_":"8.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.33","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 10","name":"Peddieston Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"1.65","value":"1.65","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"564","AssetID":"S - ALNE - 10","map___license_area":"Scotland / SHEPD","Substation":"Peddieston Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.58","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"0.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.65","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ALNE - 11","name":"Tain Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Alness GSP","upstreamBsp":"N/A","demand":{"raw":"5.78","value":"5.78","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"565","AssetID":"S - ALNE - 11","map___license_area":"Scotland / SHEPD","Substation":"Tain Primary","Upstream GSP":"Alness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.69","minimum_observed_gross_demand__mva_":"1.39","contracted_demand_excl_bess__mva_":"4.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.78","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - ARBR - 01","name":"Arbroath GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"258.79","technicalLimits":"No","rawSource":{"_id":"566","AssetID":"S - ARBR - 01","map___license_area":"Scotland / SHEPD","Substation":"Arbroath GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"58.78","minimum_observed_gross_demand__mva_":"12.86","contracted_demand_excl_bess__mva_":"6.20","contracted_bess_demand__mva_":"258.79","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"58.31","contracted_generation__mw_":"357.78","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.40","unsafe_3_phase_break_fault_level__ka_":"7.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":null}},{"id":"S - ARBR - 02","name":"Carnoustie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Arbroath GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"567","AssetID":"S - ARBR - 02","map___license_area":"Scotland / SHEPD","Substation":"Carnoustie Primary","Upstream GSP":"Arbroath GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.05","minimum_observed_gross_demand__mva_":"1.67","contracted_demand_excl_bess__mva_":"1.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.18","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARBR - 03","name":"Charles Avenue Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Arbroath GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"568","AssetID":"S - ARBR - 03","map___license_area":"Scotland / SHEPD","Substation":"Charles Avenue Primary","Upstream GSP":"Arbroath GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.68","minimum_observed_gross_demand__mva_":"1.73","contracted_demand_excl_bess__mva_":"1.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARBR - 04","name":"Elliot Depot Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Arbroath GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"569","AssetID":"S - ARBR - 04","map___license_area":"Scotland / SHEPD","Substation":"Elliot Depot Primary","Upstream GSP":"Arbroath GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"5.81","minimum_observed_gross_demand__mva_":"1.40","contracted_demand_excl_bess__mva_":"2.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARBR - 05","name":"Hume Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Arbroath GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"570","AssetID":"S - ARBR - 05","map___license_area":"Scotland / SHEPD","Substation":"Hume Street Primary","Upstream GSP":"Arbroath GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.82","minimum_observed_gross_demand__mva_":"2.06","contracted_demand_excl_bess__mva_":"0.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARBR - 06","name":"Redford Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Arbroath GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"571","AssetID":"S - ARBR - 06","map___license_area":"Scotland / SHEPD","Substation":"Redford Primary","Upstream GSP":"Arbroath GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.65","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARDK - 01","name":"Ardkinglas GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"572","AssetID":"S - ARDK - 01","map___license_area":"Scotland / SHEPD","Substation":"Ardkinglas GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"24.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.66","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 01","name":"Ardmore GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"25.00","technicalLimits":"No","rawSource":{"_id":"573","AssetID":"S - ARMO - 01","map___license_area":"Scotland / SHEPD","Substation":"Ardmore GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"36.17","minimum_observed_gross_demand__mva_":"12.98","contracted_demand_excl_bess__mva_":"11.80","contracted_bess_demand__mva_":"25.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"88.40","contracted_generation__mw_":"175.80","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.21","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Oct-28"}},{"id":"S - ARMO - 02","name":"Harris GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"574","AssetID":"S - ARMO - 02","map___license_area":"Scotland / SHEPD","Substation":"Harris GSP","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.71","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"0.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"2.76","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"10.00","unsafe_3_phase_break_fault_level__ka_":"2.78","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Nov-26"}},{"id":"S - ARMO - 03","name":"Stornoway GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"25.00","technicalLimits":"No","rawSource":{"_id":"575","AssetID":"S - ARMO - 03","map___license_area":"Scotland / SHEPD","Substation":"Stornoway GSP","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"21.64","minimum_observed_gross_demand__mva_":"7.93","contracted_demand_excl_bess__mva_":"8.09","contracted_bess_demand__mva_":"25.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"62.78","contracted_generation__mw_":"168.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.15","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 04","name":"Aird Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"4.06","value":"4.06","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"576","AssetID":"S - ARMO - 04","map___license_area":"Scotland / SHEPD","Substation":"Aird Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.15","minimum_observed_gross_demand__mva_":"0.45","contracted_demand_excl_bess__mva_":"0.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.06","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.11","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 05","name":"Barvas Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.64","value":"0.64","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"577","AssetID":"S - ARMO - 05","map___license_area":"Scotland / SHEPD","Substation":"Barvas Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.52","minimum_observed_gross_demand__mva_":"0.36","contracted_demand_excl_bess__mva_":"0.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.64","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"2.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":"Jun-28"}},{"id":"S - ARMO - 06","name":"Battery Point Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"578","AssetID":"S - ARMO - 06","map___license_area":"Scotland / SHEPD","Substation":"Battery Point Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.38","minimum_observed_gross_demand__mva_":"1.88","contracted_demand_excl_bess__mva_":"5.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"50kW","connected_generation__mw_":"25.35","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.92","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jul-27"}},{"id":"S - ARMO - 07","name":"Callanish Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"579","AssetID":"S - ARMO - 07","map___license_area":"Scotland / SHEPD","Substation":"Callanish Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.43","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"0.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"50kW","connected_generation__mw_":"0.86","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 08","name":"Clachan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"4.70","value":"4.70","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"580","AssetID":"S - ARMO - 08","map___license_area":"Scotland / SHEPD","Substation":"Clachan Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.91","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"1.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.70","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"1.80","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-28","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 09","name":"Coll Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.50","value":"0.50","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"581","AssetID":"S - ARMO - 09","map___license_area":"Scotland / SHEPD","Substation":"Coll Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.41","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"0.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.50","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.86","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.60","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-28","Substation Reinforcement Completion Date":"Jun-28"}},{"id":"S - ARMO - 10","name":"Drimore Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"1.38","value":"1.38","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"582","AssetID":"S - ARMO - 10","map___license_area":"Scotland / SHEPD","Substation":"Drimore Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.10","minimum_observed_gross_demand__mva_":"0.16","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.38","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 11","name":"Gisla Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"583","AssetID":"S - ARMO - 11","map___license_area":"Scotland / SHEPD","Substation":"Gisla Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.68","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"0.10","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"50kW","connected_generation__mw_":"0.67","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"0.82","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-28","Substation Reinforcement Completion Date":"Oct-28"}},{"id":"S - ARMO - 12","name":"Laxay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"1.21","value":"1.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"584","AssetID":"S - ARMO - 12","map___license_area":"Scotland / SHEPD","Substation":"Laxay Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.70","minimum_observed_gross_demand__mva_":"0.28","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-29","Substation Reinforcement Completion Date":"Sep-29"}},{"id":"S - ARMO - 13","name":"Loch Carnan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"18.81","value":"18.81","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"585","AssetID":"S - ARMO - 13","map___license_area":"Scotland / SHEPD","Substation":"Loch Carnan Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 6.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.57","minimum_observed_gross_demand__mva_":"0.51","contracted_demand_excl_bess__mva_":"0.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.81","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"11.40","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.14","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 14","name":"Maaruig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"0.04","value":"0.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"586","AssetID":"S - ARMO - 14","map___license_area":"Scotland / SHEPD","Substation":"Maaruig Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.19","minimum_observed_gross_demand__mva_":"0.03","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 15","name":"Pollachar Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"1.20","value":"1.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"587","AssetID":"S - ARMO - 15","map___license_area":"Scotland / SHEPD","Substation":"Pollachar Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 3.9MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.18","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"1.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.86","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.67","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 16","name":"Stockinish Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"2.06","value":"2.06","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"588","AssetID":"S - ARMO - 16","map___license_area":"Scotland / SHEPD","Substation":"Stockinish Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.76","minimum_observed_gross_demand__mva_":"0.11","contracted_demand_excl_bess__mva_":"0.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.06","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"1.78","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-28","Substation Reinforcement Completion Date":null}},{"id":"S - ARMO - 17","name":"Tarbert Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Ardmore GSP","upstreamBsp":"N/A","demand":{"raw":"2.27","value":"2.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"589","AssetID":"S - ARMO - 17","map___license_area":"Scotland / SHEPD","Substation":"Tarbert Primary","Upstream GSP":"Ardmore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"0.86","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"2.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-28","Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 01","name":"Beauly GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"49.99","technicalLimits":"Yes","rawSource":{"_id":"590","AssetID":"S - BEAU - 01","map___license_area":"Scotland / SHEPD","Substation":"Beauly GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.64","minimum_observed_gross_demand__mva_":"12.40","contracted_demand_excl_bess__mva_":"58.84","contracted_bess_demand__mva_":"49.99","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"24.43","contracted_generation__mw_":"106.82","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"11.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 02","name":"Aigas Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"591","AssetID":"S - BEAU - 02","map___license_area":"Scotland / SHEPD","Substation":"Aigas Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.10","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 03","name":"Comrie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"592","AssetID":"S - BEAU - 03","map___license_area":"Scotland / SHEPD","Substation":"Comrie Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.05MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 04","name":"Conon Bridge Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"593","AssetID":"S - BEAU - 04","map___license_area":"Scotland / SHEPD","Substation":"Conon Bridge Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.05","minimum_observed_gross_demand__mva_":"0.58","contracted_demand_excl_bess__mva_":"1.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"5.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":"Dec-28"}},{"id":"S - BEAU - 05","name":"Conon Falls Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"594","AssetID":"S - BEAU - 05","map___license_area":"Scotland / SHEPD","Substation":"Conon Falls Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.27","minimum_observed_gross_demand__mva_":"0.04","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.25","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 06","name":"Dingwall Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"595","AssetID":"S - BEAU - 06","map___license_area":"Scotland / SHEPD","Substation":"Dingwall Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5/15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.88","minimum_observed_gross_demand__mva_":"1.42","contracted_demand_excl_bess__mva_":"2.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"3.58","contracted_generation__mw_":"0.72","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 07","name":"Kiltarlity Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"596","AssetID":"S - BEAU - 07","map___license_area":"Scotland / SHEPD","Substation":"Kiltarlity Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.10","minimum_observed_gross_demand__mva_":"0.16","contracted_demand_excl_bess__mva_":"0.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 08","name":"Marybank Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"597","AssetID":"S - BEAU - 08","map___license_area":"Scotland / SHEPD","Substation":"Marybank Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.35","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"1.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"2.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 09","name":"Muir of Ord Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"598","AssetID":"S - BEAU - 09","map___license_area":"Scotland / SHEPD","Substation":"Muir of Ord Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.35","minimum_observed_gross_demand__mva_":"3.42","contracted_demand_excl_bess__mva_":"5.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - BEAU - 10","name":"North Kessock Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Beauly GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"599","AssetID":"S - BEAU - 10","map___license_area":"Scotland / SHEPD","Substation":"North Kessock Primary","Upstream GSP":"Beauly GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.50","minimum_observed_gross_demand__mva_":"0.22","contracted_demand_excl_bess__mva_":"1.50","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - BERB - 01","name":"Berryburn GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"104.53","technicalLimits":"No","rawSource":{"_id":"600","AssetID":"S - BERB - 01","map___license_area":"Scotland / SHEPD","Substation":"Berryburn GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"1 x 120MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"104.53","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"95.10","contracted_generation__mw_":"242.70","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.63","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-27","Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 01","name":"Boat of Garten GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"84.90","technicalLimits":"No","rawSource":{"_id":"601","AssetID":"S - BOAG - 01","map___license_area":"Scotland / SHEPD","Substation":"Boat of Garten GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"26.50","minimum_observed_gross_demand__mva_":"6.32","contracted_demand_excl_bess__mva_":"12.31","contracted_bess_demand__mva_":"84.90","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"45.46","contracted_generation__mw_":"85.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.48","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 02","name":"Aviemore Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"1.26","value":"1.26","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"602","AssetID":"S - BOAG - 02","map___license_area":"Scotland / SHEPD","Substation":"Aviemore Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.17","minimum_observed_gross_demand__mva_":"2.15","contracted_demand_excl_bess__mva_":"5.98","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.26","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 03","name":"Ballindalloch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"6.62","value":"6.62","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"603","AssetID":"S - BOAG - 03","map___license_area":"Scotland / SHEPD","Substation":"Ballindalloch Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.72","minimum_observed_gross_demand__mva_":"0.71","contracted_demand_excl_bess__mva_":"1.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.62","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"3.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 04","name":"Boat of Garten Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"7.19","value":"7.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"604","AssetID":"S - BOAG - 04","map___license_area":"Scotland / SHEPD","Substation":"Boat of Garten Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.98","minimum_observed_gross_demand__mva_":"0.43","contracted_demand_excl_bess__mva_":"0.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 05","name":"Dalwhinnie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"0.44","value":"0.44","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"605","AssetID":"S - BOAG - 05","map___license_area":"Scotland / SHEPD","Substation":"Dalwhinnie Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.71","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.44","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.89","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 06","name":"Grantown Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"8.08","value":"8.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"606","AssetID":"S - BOAG - 06","map___license_area":"Scotland / SHEPD","Substation":"Grantown Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.01","minimum_observed_gross_demand__mva_":"0.87","contracted_demand_excl_bess__mva_":"0.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.18","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.42","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 07","name":"Kingussie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"607","AssetID":"S - BOAG - 07","map___license_area":"Scotland / SHEPD","Substation":"Kingussie Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.24","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"1.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.82","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BOAG - 08","name":"Tomatin Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Boat of Garten GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"608","AssetID":"S - BOAG - 08","map___license_area":"Scotland / SHEPD","Substation":"Tomatin Primary","Upstream GSP":"Boat of Garten GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.87","minimum_observed_gross_demand__mva_":"0.12","contracted_demand_excl_bess__mva_":"1.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"1.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 01","name":"Braco West GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"205.59","technicalLimits":"No","rawSource":{"_id":"609","AssetID":"S - BRAC - 01","map___license_area":"Scotland / SHEPD","Substation":"Braco West GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"46.98","minimum_observed_gross_demand__mva_":"24.29","contracted_demand_excl_bess__mva_":"7.36","contracted_bess_demand__mva_":"205.59","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"109.47","contracted_generation__mw_":"359.15","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"16.90","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 02","name":"Callander Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"610","AssetID":"S - BRAC - 02","map___license_area":"Scotland / SHEPD","Substation":"Callander Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.28","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"0.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"2.76","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-27","Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 03","name":"Crieff Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"5.04","value":"5.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"611","AssetID":"S - BRAC - 03","map___license_area":"Scotland / SHEPD","Substation":"Crieff Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.23","minimum_observed_gross_demand__mva_":"1.60","contracted_demand_excl_bess__mva_":"2.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.18","contracted_generation__mw_":"0.23","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"5.37","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - BRAC - 04","name":"Dunblane Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"612","AssetID":"S - BRAC - 04","map___license_area":"Scotland / SHEPD","Substation":"Dunblane Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5 MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.36","minimum_observed_gross_demand__mva_":"2.22","contracted_demand_excl_bess__mva_":"2.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.16","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 05","name":"Forteviot Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"4.23","value":"4.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"613","AssetID":"S - BRAC - 05","map___license_area":"Scotland / SHEPD","Substation":"Forteviot Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.95","minimum_observed_gross_demand__mva_":"0.28","contracted_demand_excl_bess__mva_":"0.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.00","contracted_generation__mw_":"1.80","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"2.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 06","name":"Gleneagles Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"1.82","value":"1.82","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"614","AssetID":"S - BRAC - 06","map___license_area":"Scotland / SHEPD","Substation":"Gleneagles Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.16","minimum_observed_gross_demand__mva_":"3.02","contracted_demand_excl_bess__mva_":"1.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.82","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"2.06","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRAC - 07","name":"Kippen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Braco West GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"615","AssetID":"S - BRAC - 07","map___license_area":"Scotland / SHEPD","Substation":"Kippen Primary","Upstream GSP":"Braco West GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.27","minimum_observed_gross_demand__mva_":"2.61","contracted_demand_excl_bess__mva_":"0.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-27","Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 01","name":"Bridge of Dun GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"102.52","technicalLimits":"No","rawSource":{"_id":"616","AssetID":"S - BRID - 01","map___license_area":"Scotland / SHEPD","Substation":"Bridge of Dun GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"30.43","minimum_observed_gross_demand__mva_":"12.66","contracted_demand_excl_bess__mva_":"5.91","contracted_bess_demand__mva_":"102.52","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"9.06","contracted_generation__mw_":"227.13","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"9.06","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 02","name":"Brechin Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"3.82","value":"3.82","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"617","AssetID":"S - BRID - 02","map___license_area":"Scotland / SHEPD","Substation":"Brechin Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5 MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.81","minimum_observed_gross_demand__mva_":"0.98","contracted_demand_excl_bess__mva_":"2.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.82","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.05","contracted_generation__mw_":"0.41","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.34","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 03","name":"Bridge of Dun Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"1.49","value":"1.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"618","AssetID":"S - BRID - 03","map___license_area":"Scotland / SHEPD","Substation":"Bridge of Dun Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.98","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.57","contracted_generation__mw_":"0.66","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.03","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 04","name":"Inchbare Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"1.56","value":"1.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"619","AssetID":"S - BRID - 04","map___license_area":"Scotland / SHEPD","Substation":"Inchbare Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.17","minimum_observed_gross_demand__mva_":"0.25","contracted_demand_excl_bess__mva_":"0.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.18","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"1.74","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 05","name":"Logie Pert Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"3.61","value":"3.61","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"620","AssetID":"S - BRID - 05","map___license_area":"Scotland / SHEPD","Substation":"Logie Pert Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.44","minimum_observed_gross_demand__mva_":"0.21","contracted_demand_excl_bess__mva_":"1.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.61","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.45","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 06","name":"Mill Road Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"621","AssetID":"S - BRID - 06","map___license_area":"Scotland / SHEPD","Substation":"Mill Road Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x  10/12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.27","minimum_observed_gross_demand__mva_":"1.30","contracted_demand_excl_bess__mva_":"0.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.20","contracted_generation__mw_":"0.75","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-29","Substation Reinforcement Completion Date":null}},{"id":"S - BRID - 07","name":"Montrose North Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"622","AssetID":"S - BRID - 07","map___license_area":"Scotland / SHEPD","Substation":"Montrose North Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.76","minimum_observed_gross_demand__mva_":"1.78","contracted_demand_excl_bess__mva_":"0.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-29","Substation Reinforcement Completion Date":"Aug-29"}},{"id":"S - BRID - 08","name":"St Cyrus Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Bridge of Dun GSP","upstreamBsp":"N/A","demand":{"raw":"4.88","value":"4.88","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"623","AssetID":"S - BRID - 08","map___license_area":"Scotland / SHEPD","Substation":"St Cyrus Primary","Upstream GSP":"Bridge of Dun GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4 / 8MVA + 1 x 6MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.48","minimum_observed_gross_demand__mva_":"0.36","contracted_demand_excl_bess__mva_":"0.68","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.88","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"3.28","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"4.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 01","name":"Broadford GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"624","AssetID":"S - BROA - 01","map___license_area":"Scotland / SHEPD","Substation":"Broadford GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 30MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"18.62","minimum_observed_gross_demand__mva_":"4.64","contracted_demand_excl_bess__mva_":"19.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.89","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"4.10","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Apr-29","Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 02","name":"Broadford Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"4.85","value":"4.85","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"625","AssetID":"S - BROA - 02","map___license_area":"Scotland / SHEPD","Substation":"Broadford Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.50","minimum_observed_gross_demand__mva_":"0.37","contracted_demand_excl_bess__mva_":"2.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.01","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"4.85","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"3.33","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 03","name":"Drynoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.68","value":"0.68","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"626","AssetID":"S - BROA - 03","map___license_area":"Scotland / SHEPD","Substation":"Drynoch Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.61","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"1.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.72","contracted_generation__mw_":"1.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.68","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.31","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-29","Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 04","name":"Kalnakil Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"1.10","value":"1.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"627","AssetID":"S - BROA - 04","map___license_area":"Scotland / SHEPD","Substation":"Kalnakil Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.40","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"1.10","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"0.95","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 05","name":"Kishornhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.67","value":"0.67","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"628","AssetID":"S - BROA - 05","map___license_area":"Scotland / SHEPD","Substation":"Kishornhill Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.79","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.43","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.67","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"1.12","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 06","name":"Kyle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"4.85","value":"4.85","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"629","AssetID":"S - BROA - 06","map___license_area":"Scotland / SHEPD","Substation":"Kyle Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.00","minimum_observed_gross_demand__mva_":"0.74","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"4.85","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"3.64","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - BROA - 07","name":"Lower Ollach Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"1.01","value":"1.01","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"630","AssetID":"S - BROA - 07","map___license_area":"Scotland / SHEPD","Substation":"Lower Ollach Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.90","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"1.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"1.01","unsafe_3_phase_break_fault_rating__ka_":"18.00","unsafe_3_phase_break_fault_level__ka_":"0.89","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-29","Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 08","name":"Nostie Bridge Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"1.18","value":"1.18","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"631","AssetID":"S - BROA - 08","map___license_area":"Scotland / SHEPD","Substation":"Nostie Bridge Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.23","minimum_observed_gross_demand__mva_":"0.32","contracted_demand_excl_bess__mva_":"0.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"1.18","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.17","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Aug-28","Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 09","name":"Shieldaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"1.04","value":"1.04","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"632","AssetID":"S - BROA - 09","map___license_area":"Scotland / SHEPD","Substation":"Shieldaig Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.61","minimum_observed_gross_demand__mva_":"0.09","contracted_demand_excl_bess__mva_":"0.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"1.04","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.76","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROA - 10","name":"Skulamus Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Broadford GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"1.41","value":"1.41","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"633","AssetID":"S - BROA - 10","map___license_area":"Scotland / SHEPD","Substation":"Skulamus Primary","Upstream GSP":"Broadford GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.52","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"5.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"1.41","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.60","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-28","Substation Reinforcement Completion Date":"Sep-28"}},{"id":"S - BROR - 01","name":"Brora GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"634","AssetID":"S - BROR - 01","map___license_area":"Scotland / SHEPD","Substation":"Brora GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"10.73","minimum_observed_gross_demand__mva_":"2.85","contracted_demand_excl_bess__mva_":"2.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"116.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.30","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-29","Substation Reinforcement Completion Date":null}},{"id":"S - BROR - 02","name":"Brora Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Brora GSP","upstreamBsp":"N/A","demand":{"raw":"3.96","value":"3.96","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"635","AssetID":"S - BROR - 02","map___license_area":"Scotland / SHEPD","Substation":"Brora Primary","Upstream GSP":"Brora GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.02","minimum_observed_gross_demand__mva_":"0.33","contracted_demand_excl_bess__mva_":"0.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.96","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.18","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROR - 03","name":"Dornoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Brora GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"636","AssetID":"S - BROR - 03","map___license_area":"Scotland / SHEPD","Substation":"Dornoch Primary","Upstream GSP":"Brora GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.26","minimum_observed_gross_demand__mva_":"0.83","contracted_demand_excl_bess__mva_":"1.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - BROR - 04","name":"Golspie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Brora GSP","upstreamBsp":"N/A","demand":{"raw":"0.84","value":"0.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"637","AssetID":"S - BROR - 04","map___license_area":"Scotland / SHEPD","Substation":"Golspie Primary","Upstream GSP":"Brora GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.92","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.25","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BROR - 05","name":"Helmsdale Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Brora GSP","upstreamBsp":"N/A","demand":{"raw":"0.28","value":"0.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"638","AssetID":"S - BROR - 05","map___license_area":"Scotland / SHEPD","Substation":"Helmsdale Primary","Upstream GSP":"Brora GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.06","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BUMU - 01","name":"Burghmuir GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"118.29","technicalLimits":"No","rawSource":{"_id":"639","AssetID":"S - BUMU - 01","map___license_area":"Scotland / SHEPD","Substation":"Burghmuir GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"42.37","minimum_observed_gross_demand__mva_":"18.00","contracted_demand_excl_bess__mva_":"35.31","contracted_bess_demand__mva_":"118.29","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"2.51","contracted_generation__mw_":"325.36","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.53","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - BUMU - 02","name":"Burghmuir Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Burghmuir GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"640","AssetID":"S - BUMU - 02","map___license_area":"Scotland / SHEPD","Substation":"Burghmuir Primary","Upstream GSP":"Burghmuir GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.12","minimum_observed_gross_demand__mva_":"1.31","contracted_demand_excl_bess__mva_":"13.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.39","contracted_generation__mw_":"1.39","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.06","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BUMU - 03","name":"Goodlyburn Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Burghmuir GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"641","AssetID":"S - BUMU - 03","map___license_area":"Scotland / SHEPD","Substation":"Goodlyburn Primary","Upstream GSP":"Burghmuir GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.24","minimum_observed_gross_demand__mva_":"2.13","contracted_demand_excl_bess__mva_":"1.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - BUMU - 04","name":"Inveralmond Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Burghmuir GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"642","AssetID":"S - BUMU - 04","map___license_area":"Scotland / SHEPD","Substation":"Inveralmond Primary","Upstream GSP":"Burghmuir GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.89","minimum_observed_gross_demand__mva_":"1.02","contracted_demand_excl_bess__mva_":"14.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-28","Substation Reinforcement Completion Date":null}},{"id":"S - BUMU - 05","name":"Redgorton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Burghmuir GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"643","AssetID":"S - BUMU - 05","map___license_area":"Scotland / SHEPD","Substation":"Redgorton Primary","Upstream GSP":"Burghmuir GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.43","minimum_observed_gross_demand__mva_":"1.00","contracted_demand_excl_bess__mva_":"4.25","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.12","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-28","Substation Reinforcement Completion Date":null}},{"id":"S - BUMU - 06","name":"Thimblerow Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Burghmuir GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"644","AssetID":"S - BUMU - 06","map___license_area":"Scotland / SHEPD","Substation":"Thimblerow Primary","Upstream GSP":"Burghmuir GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.10","minimum_observed_gross_demand__mva_":"2.99","contracted_demand_excl_bess__mva_":"1.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 01","name":"Carradale 1 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"645","AssetID":"S - CAAD (1) - 01","map___license_area":"Scotland / SHEPD","Substation":"Carradale 1 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.30","minimum_observed_gross_demand__mva_":"10.17","contracted_demand_excl_bess__mva_":"4.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"103.21","contracted_generation__mw_":"261.56","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.99","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 02","name":"Balliekine Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"646","AssetID":"S - CAAD (1) - 02","map___license_area":"Scotland / SHEPD","Substation":"Balliekine Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.51","minimum_observed_gross_demand__mva_":"0.07","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"10.00","unsafe_3_phase_break_fault_level__ka_":"1.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 03","name":"Ballure Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"1.59","value":"1.59","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"647","AssetID":"S - CAAD (1) - 03","map___license_area":"Scotland / SHEPD","Substation":"Ballure Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.27","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.59","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.18","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 04","name":"Brodick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"648","AssetID":"S - CAAD (1) - 04","map___license_area":"Scotland / SHEPD","Substation":"Brodick Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.90","minimum_observed_gross_demand__mva_":"0.78","contracted_demand_excl_bess__mva_":"0.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.67","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.00","unsafe_3_phase_break_fault_level__ka_":"4.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 05","name":"Campbeltown Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"8.33","value":"8.33","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"649","AssetID":"S - CAAD (1) - 05","map___license_area":"Scotland / SHEPD","Substation":"Campbeltown Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.93","minimum_observed_gross_demand__mva_":"0.85","contracted_demand_excl_bess__mva_":"0.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.33","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.32","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 06","name":"Claonaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.28","value":"0.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"650","AssetID":"S - CAAD (1) - 06","map___license_area":"Scotland / SHEPD","Substation":"Claonaig Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.09","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 07","name":"Dippen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.73","value":"0.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"651","AssetID":"S - CAAD (1) - 07","map___license_area":"Scotland / SHEPD","Substation":"Dippen Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.44","minimum_observed_gross_demand__mva_":"0.06","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"5.20","unsafe_3_phase_break_fault_level__ka_":"1.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (1) - 08","name":"Machrie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"652","AssetID":"S - CAAD (1) - 08","map___license_area":"Scotland / SHEPD","Substation":"Machrie Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.70","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"1.89","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - CAAD (1) - 09","name":"Whiting Bay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Carradale 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"653","AssetID":"S - CAAD (1) - 09","map___license_area":"Scotland / SHEPD","Substation":"Whiting Bay Primary","Upstream GSP":"Carradale 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 8MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.15","minimum_observed_gross_demand__mva_":"0.31","contracted_demand_excl_bess__mva_":"0.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"2.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CAAD (2) - 01","name":"Carradale 2 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"105.05","technicalLimits":"No","rawSource":{"_id":"654","AssetID":"S - CAAD (2) - 01","map___license_area":"Scotland / SHEPD","Substation":"Carradale 2 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"105.05","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"86.41","contracted_generation__mw_":"152.70","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.60","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - CAIN - 01","name":"Cairnford GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"51.96","technicalLimits":"No","rawSource":{"_id":"655","AssetID":"S - CAIN - 01","map___license_area":"Scotland / SHEPD","Substation":"Cairnford GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"1 x 120MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"51.96","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"37.00","contracted_generation__mw_":"222.70","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.05","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CASS - 01","name":"Cassley GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"656","AssetID":"S - CASS - 01","map___license_area":"Scotland / SHEPD","Substation":"Cassley GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 30MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.97","minimum_observed_gross_demand__mva_":"1.35","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"16.51","contracted_generation__mw_":"94.60","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.77","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":null}},{"id":"S - CASS - 02","name":"Overscaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cassley GSP","upstreamBsp":"N/A","demand":{"raw":"0.16","value":"0.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"657","AssetID":"S - CASS - 02","map___license_area":"Scotland / SHEPD","Substation":"Overscaig Primary","Upstream GSP":"Cassley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CASS - 03","name":"Rhiconich Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Cassley GSP","upstreamBsp":"N/A","demand":{"raw":"2.84","value":"2.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"658","AssetID":"S - CASS - 03","map___license_area":"Scotland / SHEPD","Substation":"Rhiconich Primary","Upstream GSP":"Cassley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 3.9MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.66","minimum_observed_gross_demand__mva_":"0.29","contracted_demand_excl_bess__mva_":"0.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CEAN - 01","name":"Ceannacroc GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"659","AssetID":"S - CEAN - 01","map___license_area":"Scotland / SHEPD","Substation":"Ceannacroc GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 30MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"7.39","minimum_observed_gross_demand__mva_":"1.00","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"17.85","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"15.62","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CHAR - 01","name":"Charleston GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"52.53","technicalLimits":"Yes","rawSource":{"_id":"660","AssetID":"S - CHAR - 01","map___license_area":"Scotland / SHEPD","Substation":"Charleston GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"67.64","minimum_observed_gross_demand__mva_":"10.71","contracted_demand_excl_bess__mva_":"11.00","contracted_bess_demand__mva_":"52.53","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"51.55","contracted_generation__mw_":"116.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"13.99","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-31","Substation Reinforcement Completion Date":null}},{"id":"S - CHAR - 02","name":"Charleston Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Charleston GSP","upstreamBsp":"N/A","demand":{"raw":"4.03","value":"4.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"661","AssetID":"S - CHAR - 02","map___license_area":"Scotland / SHEPD","Substation":"Charleston Primary","Upstream GSP":"Charleston GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.20","minimum_observed_gross_demand__mva_":"1.51","contracted_demand_excl_bess__mva_":"1.96","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CHAR - 03","name":"Gourdie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Charleston GSP","upstreamBsp":"N/A","demand":{"raw":"2.21","value":"2.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"662","AssetID":"S - CHAR - 03","map___license_area":"Scotland / SHEPD","Substation":"Gourdie Primary","Upstream GSP":"Charleston GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.71","minimum_observed_gross_demand__mva_":"0.39","contracted_demand_excl_bess__mva_":"3.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CHAR - 04","name":"Menzieshill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Charleston GSP","upstreamBsp":"N/A","demand":{"raw":"10.35","value":"10.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"663","AssetID":"S - CHAR - 04","map___license_area":"Scotland / SHEPD","Substation":"Menzieshill Primary","Upstream GSP":"Charleston GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 18 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.53","minimum_observed_gross_demand__mva_":"1.51","contracted_demand_excl_bess__mva_":"2.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CHAR - 05","name":"Ninewells Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Charleston GSP","upstreamBsp":"N/A","demand":{"raw":"7.57","value":"7.57","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"664","AssetID":"S - CHAR - 05","map___license_area":"Scotland / SHEPD","Substation":"Ninewells Primary","Upstream GSP":"Charleston GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.72","minimum_observed_gross_demand__mva_":"1.65","contracted_demand_excl_bess__mva_":"3.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.57","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"4.14","contracted_generation__mw_":"0.85","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.27","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAC - 01","name":"Clachan GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"665","AssetID":"S - CLAC - 01","map___license_area":"Scotland / SHEPD","Substation":"Clachan GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.39","minimum_observed_gross_demand__mva_":"0.39","contracted_demand_excl_bess__mva_":"1.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"10.25","contracted_generation__mw_":"39.71","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"21.97","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAC - 02","name":"Butterbridge Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clachan GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.10","value":"0.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"666","AssetID":"S - CLAC - 02","map___license_area":"Scotland / SHEPD","Substation":"Butterbridge Primary","Upstream GSP":"Clachan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.10","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAC - 03","name":"Douglas Pier Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clachan GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"1.20","value":"1.20","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"667","AssetID":"S - CLAC - 03","map___license_area":"Scotland / SHEPD","Substation":"Douglas Pier Primary","Upstream GSP":"Clachan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.01","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"1.20","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"1.32","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAC - 04","name":"Inveraray Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clachan GSP","upstreamBsp":"N/A","demand":{"raw":"1.96","value":"1.96","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"2.55","value":"2.55","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"668","AssetID":"S - CLAC - 04","map___license_area":"Scotland / SHEPD","Substation":"Inveraray Primary","Upstream GSP":"Clachan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.99","minimum_observed_gross_demand__mva_":"0.17","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.96","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"2.55","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.38","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"S - CLAC - 05","name":"Lochgoilhead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clachan GSP","upstreamBsp":"N/A","demand":{"raw":"1.88","value":"1.88","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"669","AssetID":"S - CLAC - 05","map___license_area":"Scotland / SHEPD","Substation":"Lochgoilhead Primary","Upstream GSP":"Clachan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.03","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.88","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.28","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.39","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAC - 06","name":"Strachur Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clachan GSP","upstreamBsp":"N/A","demand":{"raw":"0.33","value":"0.33","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.59","value":"0.59","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"670","AssetID":"S - CLAC - 06","map___license_area":"Scotland / SHEPD","Substation":"Strachur Primary","Upstream GSP":"Clachan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.78","minimum_observed_gross_demand__mva_":"0.11","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.33","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.59","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.83","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAY - 01","name":"Clayhills GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"671","AssetID":"S - CLAY - 01","map___license_area":"Scotland / SHEPD","Substation":"Clayhills GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"27.52","minimum_observed_gross_demand__mva_":"10.72","contracted_demand_excl_bess__mva_":"12.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.62","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"11.97","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAY - 02","name":"Balnagask Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clayhills GSP","upstreamBsp":"N/A","demand":{"raw":"8.47","value":"8.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"10.56","value":"10.56","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"672","AssetID":"S - CLAY - 02","map___license_area":"Scotland / SHEPD","Substation":"Balnagask Primary","Upstream GSP":"Clayhills GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 11.5 / 23MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.06","minimum_observed_gross_demand__mva_":"0.58","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.95","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"10.56","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.50","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAY - 03","name":"Clayhills Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clayhills GSP","upstreamBsp":"N/A","demand":{"raw":"4.23","value":"4.23","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"24.22","value":"24.22","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"673","AssetID":"S - CLAY - 03","map___license_area":"Scotland / SHEPD","Substation":"Clayhills Primary","Upstream GSP":"Clayhills GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.70","minimum_observed_gross_demand__mva_":"3.39","contracted_demand_excl_bess__mva_":"8.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.23","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"24.22","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.67","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CLAY - 04","name":"Commerce Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Clayhills GSP","upstreamBsp":"N/A","demand":{"raw":"7.26","value":"7.26","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"23.37","value":"23.37","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"674","AssetID":"S - CLAY - 04","map___license_area":"Scotland / SHEPD","Substation":"Commerce Street Primary","Upstream GSP":"Clayhills GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.53","minimum_observed_gross_demand__mva_":"3.27","contracted_demand_excl_bess__mva_":"4.47","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.26","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"23.37","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.58","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 01","name":"Coupar Angus GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"286.45","technicalLimits":"Yes","rawSource":{"_id":"675","AssetID":"S - COUA - 01","map___license_area":"Scotland / SHEPD","Substation":"Coupar Angus GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"64.50","minimum_observed_gross_demand__mva_":"4.38","contracted_demand_excl_bess__mva_":"12.10","contracted_bess_demand__mva_":"286.45","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"105.01","contracted_generation__mw_":"456.42","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"15.41","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 02","name":"Alyth Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"2.93","value":"2.93","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"676","AssetID":"S - COUA - 02","map___license_area":"Scotland / SHEPD","Substation":"Alyth Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.84","minimum_observed_gross_demand__mva_":"0.41","contracted_demand_excl_bess__mva_":"1.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.93","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 03","name":"Blairgowrie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"13.03","value":"13.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"677","AssetID":"S - COUA - 03","map___license_area":"Scotland / SHEPD","Substation":"Blairgowrie Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.11","minimum_observed_gross_demand__mva_":"1.17","contracted_demand_excl_bess__mva_":"2.03","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.36","contracted_generation__mw_":"0.63","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 04","name":"Caputh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"5.92","value":"5.92","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"678","AssetID":"S - COUA - 04","map___license_area":"Scotland / SHEPD","Substation":"Caputh Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.56","minimum_observed_gross_demand__mva_":"0.84","contracted_demand_excl_bess__mva_":"0.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.92","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"5.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 05","name":"Coupar Angus Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"679","AssetID":"S - COUA - 05","map___license_area":"Scotland / SHEPD","Substation":"Coupar Angus Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA + 1 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.06","minimum_observed_gross_demand__mva_":"1.08","contracted_demand_excl_bess__mva_":"7.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-26"}},{"id":"S - COUA - 06","name":"Dalrulzion Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"0.52","value":"0.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"680","AssetID":"S - COUA - 06","map___license_area":"Scotland / SHEPD","Substation":"Dalrulzion Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.39","minimum_observed_gross_demand__mva_":"0.34","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.35","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.00","unsafe_3_phase_break_fault_level__ka_":"3.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - COUA - 07","name":"Leoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Coupar Angus GSP","upstreamBsp":"N/A","demand":{"raw":"3.99","value":"3.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"681","AssetID":"S - COUA - 07","map___license_area":"Scotland / SHEPD","Substation":"Leoch Primary","Upstream GSP":"Coupar Angus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.14","minimum_observed_gross_demand__mva_":"0.45","contracted_demand_excl_bess__mva_":"0.52","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.69","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.50","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CRAI - 01","name":"Craigiebuckler GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"82.11","technicalLimits":"No","rawSource":{"_id":"682","AssetID":"S - CRAI - 01","map___license_area":"Scotland / SHEPD","Substation":"Craigiebuckler GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"22.75","minimum_observed_gross_demand__mva_":"11.04","contracted_demand_excl_bess__mva_":"8.05","contracted_bess_demand__mva_":"82.11","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.43","contracted_generation__mw_":"80.79","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.36","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CRAI - 02","name":"Craigiebuckler Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Craigiebuckler GSP","upstreamBsp":"N/A","demand":{"raw":"3.63","value":"3.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"683","AssetID":"S - CRAI - 02","map___license_area":"Scotland / SHEPD","Substation":"Craigiebuckler Primary","Upstream GSP":"Craigiebuckler GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.19","minimum_observed_gross_demand__mva_":"0.89","contracted_demand_excl_bess__mva_":"4.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.21","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CRAI - 03","name":"Craigton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Craigiebuckler GSP","upstreamBsp":"N/A","demand":{"raw":"3.63","value":"3.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"684","AssetID":"S - CRAI - 03","map___license_area":"Scotland / SHEPD","Substation":"Craigton Primary","Upstream GSP":"Craigiebuckler GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.09","minimum_observed_gross_demand__mva_":"1.75","contracted_demand_excl_bess__mva_":"1.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.95","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CRAI - 04","name":"Culter Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Craigiebuckler GSP","upstreamBsp":"N/A","demand":{"raw":"3.63","value":"3.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"685","AssetID":"S - CRAI - 04","map___license_area":"Scotland / SHEPD","Substation":"Culter Primary","Upstream GSP":"Craigiebuckler GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.91","minimum_observed_gross_demand__mva_":"0.85","contracted_demand_excl_bess__mva_":"1.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"3.89","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - CRAI - 05","name":"Ruthrieston Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Craigiebuckler GSP","upstreamBsp":"N/A","demand":{"raw":"3.63","value":"3.63","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"686","AssetID":"S - CRAI - 05","map___license_area":"Scotland / SHEPD","Substation":"Ruthrieston Primary","Upstream GSP":"Craigiebuckler GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.91","minimum_observed_gross_demand__mva_":"2.16","contracted_demand_excl_bess__mva_":"1.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.63","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.38","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.96","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DAAS - 01","name":"Dallas GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"687","AssetID":"S - DAAS - 01","map___license_area":"Scotland / SHEPD","Substation":"Dallas GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"1 x 120MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"96.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"87.40","contracted_generation__mw_":"23.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.69","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DOUN - 01","name":"Dounreay GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"229.67","technicalLimits":"No","rawSource":{"_id":"688","AssetID":"S - DOUN - 01","map___license_area":"Scotland / SHEPD","Substation":"Dounreay GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"53.80","minimum_observed_gross_demand__mva_":"3.95","contracted_demand_excl_bess__mva_":"0.25","contracted_bess_demand__mva_":"229.67","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"62.68","contracted_generation__mw_":"234.80","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.05","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-27","Substation Reinforcement Completion Date":null}},{"id":"S - DOUN - 02","name":"Bettyhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dounreay GSP","upstreamBsp":"N/A","demand":{"raw":"2.09","value":"2.09","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"689","AssetID":"S - DOUN - 02","map___license_area":"Scotland / SHEPD","Substation":"Bettyhill Primary","Upstream GSP":"Dounreay GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.78","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.09","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DOUN - 03","name":"Coldbackie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dounreay GSP","upstreamBsp":"N/A","demand":{"raw":"1.79","value":"1.79","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"690","AssetID":"S - DOUN - 03","map___license_area":"Scotland / SHEPD","Substation":"Coldbackie Primary","Upstream GSP":"Dounreay GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.81","minimum_observed_gross_demand__mva_":"0.28","contracted_demand_excl_bess__mva_":"0.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.79","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.12","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DOUN - 04","name":"Forss Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dounreay GSP","upstreamBsp":"N/A","demand":{"raw":"0.33","value":"0.33","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"691","AssetID":"S - DOUN - 04","map___license_area":"Scotland / SHEPD","Substation":"Forss Primary","Upstream GSP":"Dounreay GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.15","minimum_observed_gross_demand__mva_":"0.31","contracted_demand_excl_bess__mva_":"0.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.33","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.81","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DOUN - 05","name":"Melvich Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dounreay GSP","upstreamBsp":"N/A","demand":{"raw":"1.66","value":"1.66","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"692","AssetID":"S - DOUN - 05","map___license_area":"Scotland / SHEPD","Substation":"Melvich Primary","Upstream GSP":"Dounreay GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.76","minimum_observed_gross_demand__mva_":"0.12","contracted_demand_excl_bess__mva_":"0.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.66","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUBE - 01","name":"Dunbeath GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"693","AssetID":"S - DUBE - 01","map___license_area":"Scotland / SHEPD","Substation":"Dunbeath GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"14.25","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.74","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUDH - 01","name":"Dudhope GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"42.00","technicalLimits":"No","rawSource":{"_id":"694","AssetID":"S - DUDH - 01","map___license_area":"Scotland / SHEPD","Substation":"Dudhope GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"38.14","minimum_observed_gross_demand__mva_":"16.72","contracted_demand_excl_bess__mva_":"10.90","contracted_bess_demand__mva_":"42.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"80.25","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.54","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUDH - 02","name":"Constable Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dudhope GSP","upstreamBsp":"N/A","demand":{"raw":"12.99","value":"12.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"28.05","value":"28.05","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"695","AssetID":"S - DUDH - 02","map___license_area":"Scotland / SHEPD","Substation":"Constable Street Primary","Upstream GSP":"Dudhope GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.68","minimum_observed_gross_demand__mva_":"1.83","contracted_demand_excl_bess__mva_":"4.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"28.05","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.68","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUDH - 03","name":"Overgate Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dudhope GSP","upstreamBsp":"N/A","demand":{"raw":"8.35","value":"8.35","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"35.83","value":"35.83","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"696","AssetID":"S - DUDH - 03","map___license_area":"Scotland / SHEPD","Substation":"Overgate Primary","Upstream GSP":"Dudhope GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.57","minimum_observed_gross_demand__mva_":"2.66","contracted_demand_excl_bess__mva_":"3.99","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.35","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"35.83","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.65","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-26"}},{"id":"S - DUDH - 04","name":"Rosebank Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dudhope GSP","upstreamBsp":"N/A","demand":{"raw":"10.20","value":"10.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"21.71","value":"21.71","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"697","AssetID":"S - DUDH - 04","map___license_area":"Scotland / SHEPD","Substation":"Rosebank Street Primary","Upstream GSP":"Dudhope GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.61","minimum_observed_gross_demand__mva_":"2.01","contracted_demand_excl_bess__mva_":"1.88","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.40","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"21.71","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.58","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUDH - 05","name":"Walton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dudhope GSP","upstreamBsp":"N/A","demand":{"raw":"16.16","value":"16.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"21.96","value":"21.96","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"698","AssetID":"S - DUDH - 05","map___license_area":"Scotland / SHEPD","Substation":"Walton Primary","Upstream GSP":"Dudhope GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.89","minimum_observed_gross_demand__mva_":"0.98","contracted_demand_excl_bess__mva_":"0.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"21.96","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.25","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUGR - 01","name":"Dunvegan GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"699","AssetID":"S - DUGR - 01","map___license_area":"Scotland / SHEPD","Substation":"Dunvegan GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.05","minimum_observed_gross_demand__mva_":"3.86","contracted_demand_excl_bess__mva_":"5.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"28.75","contracted_generation__mw_":"52.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.46","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-31"}},{"id":"S - DUGR - 02","name":"Dunvegan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunvegan GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"700","AssetID":"S - DUGR - 02","map___license_area":"Scotland / SHEPD","Substation":"Dunvegan Primary","Upstream GSP":"Dunvegan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.02","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.83","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"2.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUGR - 03","name":"Portree Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunvegan GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"701","AssetID":"S - DUGR - 03","map___license_area":"Scotland / SHEPD","Substation":"Portree Primary","Upstream GSP":"Dunvegan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4 / 8MVA + 1 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.41","minimum_observed_gross_demand__mva_":"1.05","contracted_demand_excl_bess__mva_":"1.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.21","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":null}},{"id":"S - DUGR - 04","name":"Uig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunvegan GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"702","AssetID":"S - DUGR - 04","map___license_area":"Scotland / SHEPD","Substation":"Uig Primary","Upstream GSP":"Dunvegan GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.33","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"1.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-31","Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 01","name":"Dunoon GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"47.89","technicalLimits":"No","rawSource":{"_id":"703","AssetID":"S - DUNO - 01","map___license_area":"Scotland / SHEPD","Substation":"Dunoon GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.84","minimum_observed_gross_demand__mva_":"9.72","contracted_demand_excl_bess__mva_":"3.55","contracted_bess_demand__mva_":"47.89","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"38.41","contracted_generation__mw_":"93.14","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.80","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-30","Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 02","name":"Bruchag Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"2.89","technicalLimits":"No","rawSource":{"_id":"704","AssetID":"S - DUNO - 02","map___license_area":"Scotland / SHEPD","Substation":"Bruchag Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.61","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.50","contracted_bess_demand__mva_":"2.89","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"3.50","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.94","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-29","Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 03","name":"Colintraive Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.45","value":"0.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"705","AssetID":"S - DUNO - 03","map___license_area":"Scotland / SHEPD","Substation":"Colintraive Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.14","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 04","name":"Dunoon Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"706","AssetID":"S - DUNO - 04","map___license_area":"Scotland / SHEPD","Substation":"Dunoon Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.84","minimum_observed_gross_demand__mva_":"1.43","contracted_demand_excl_bess__mva_":"0.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 05","name":"Glendaruel Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.21","value":"0.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"707","AssetID":"S - DUNO - 05","map___license_area":"Scotland / SHEPD","Substation":"Glendaruel Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.15","minimum_observed_gross_demand__mva_":"0.05","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 06","name":"Innellan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"708","AssetID":"S - DUNO - 06","map___license_area":"Scotland / SHEPD","Substation":"Innellan Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.13","minimum_observed_gross_demand__mva_":"0.22","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.93","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 07","name":"Kames Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"1.77","value":"1.77","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"709","AssetID":"S - DUNO - 07","map___license_area":"Scotland / SHEPD","Substation":"Kames Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.05","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.77","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.38","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 08","name":"Newton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.17","value":"0.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"710","AssetID":"S - DUNO - 08","map___license_area":"Scotland / SHEPD","Substation":"Newton Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.14","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.31","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 09","name":"Otter Ferry Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"1.51","value":"1.51","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"711","AssetID":"S - DUNO - 09","map___license_area":"Scotland / SHEPD","Substation":"Otter Ferry Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.27","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.51","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.36","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.61","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 10","name":"Rothesay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"712","AssetID":"S - DUNO - 10","map___license_area":"Scotland / SHEPD","Substation":"Rothesay Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.64","minimum_observed_gross_demand__mva_":"0.94","contracted_demand_excl_bess__mva_":"0.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-29","Substation Reinforcement Completion Date":null}},{"id":"S - DUNO - 11","name":"Sandbank Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dunoon GSP","upstreamBsp":"N/A","demand":{"raw":"4.09","value":"4.09","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"713","AssetID":"S - DUNO - 11","map___license_area":"Scotland / SHEPD","Substation":"Sandbank Primary","Upstream GSP":"Dunoon GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.42","minimum_observed_gross_demand__mva_":"0.59","contracted_demand_excl_bess__mva_":"0.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.09","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.09","contracted_generation__mw_":"0.19","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DYCE - 01","name":"Dyce GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"232.69","technicalLimits":"Yes","rawSource":{"_id":"714","AssetID":"S - DYCE - 01","map___license_area":"Scotland / SHEPD","Substation":"Dyce GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"34.78","minimum_observed_gross_demand__mva_":"11.40","contracted_demand_excl_bess__mva_":"6.14","contracted_bess_demand__mva_":"232.69","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"32.32","contracted_generation__mw_":"259.50","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.58","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DYCE - 02","name":"Balmedie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"8.85","value":"8.85","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"715","AssetID":"S - DYCE - 02","map___license_area":"Scotland / SHEPD","Substation":"Balmedie Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.28","minimum_observed_gross_demand__mva_":"0.47","contracted_demand_excl_bess__mva_":"1.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.85","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"6.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DYCE - 03","name":"Dyce North Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"10.22","value":"10.22","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"716","AssetID":"S - DYCE - 03","map___license_area":"Scotland / SHEPD","Substation":"Dyce North Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.33","minimum_observed_gross_demand__mva_":"3.02","contracted_demand_excl_bess__mva_":"0.73","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.22","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"S - DYCE - 04","name":"Ellon Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"717","AssetID":"S - DYCE - 04","map___license_area":"Scotland / SHEPD","Substation":"Ellon Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.91","minimum_observed_gross_demand__mva_":"1.81","contracted_demand_excl_bess__mva_":"2.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.38","contracted_generation__mw_":"0.85","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Aug-27"}},{"id":"S - DYCE - 05","name":"Harvest Avenue Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"19.49","value":"19.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"718","AssetID":"S - DYCE - 05","map___license_area":"Scotland / SHEPD","Substation":"Harvest Avenue Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.75","minimum_observed_gross_demand__mva_":"0.54","contracted_demand_excl_bess__mva_":"0.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"19.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.00","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-26"}},{"id":"S - DYCE - 06","name":"Kingseat Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"1.28","value":"1.28","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"719","AssetID":"S - DYCE - 06","map___license_area":"Scotland / SHEPD","Substation":"Kingseat Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.14","minimum_observed_gross_demand__mva_":"0.60","contracted_demand_excl_bess__mva_":"1.80","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.28","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.02","contracted_generation__mw_":"1.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.00","unsafe_3_phase_break_fault_level__ka_":"7.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - DYCE - 07","name":"Stoneywood (T3) Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Dyce GSP","upstreamBsp":"N/A","demand":{"raw":"19.47","value":"19.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"720","AssetID":"S - DYCE - 07","map___license_area":"Scotland / SHEPD","Substation":"Stoneywood (T3) Primary","Upstream GSP":"Dyce GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.53","minimum_observed_gross_demand__mva_":"0.71","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"19.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"9.50","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 01","name":"Elgin GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"253.24","technicalLimits":"No","rawSource":{"_id":"721","AssetID":"S - ELGI - 01","map___license_area":"Scotland / SHEPD","Substation":"Elgin GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"45.42","minimum_observed_gross_demand__mva_":"18.92","contracted_demand_excl_bess__mva_":"22.33","contracted_bess_demand__mva_":"253.24","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.19","contracted_generation__mw_":"302.16","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.69","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-30","Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 02","name":"Ashgrove Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"722","AssetID":"S - ELGI - 02","map___license_area":"Scotland / SHEPD","Substation":"Ashgrove Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 10 / 12.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"6.88","minimum_observed_gross_demand__mva_":"1.47","contracted_demand_excl_bess__mva_":"4.63","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jul-28","Substation Reinforcement Completion Date":"Jul-28"}},{"id":"S - ELGI - 03","name":"Bilbohall Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"6.97","value":"6.97","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"723","AssetID":"S - ELGI - 03","map___license_area":"Scotland / SHEPD","Substation":"Bilbohall Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.30","minimum_observed_gross_demand__mva_":"0.48","contracted_demand_excl_bess__mva_":"5.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.97","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.07","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-28","Substation Reinforcement Completion Date":"May-28"}},{"id":"S - ELGI - 04","name":"Burghead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"724","AssetID":"S - ELGI - 04","map___license_area":"Scotland / SHEPD","Substation":"Burghead Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.78","minimum_observed_gross_demand__mva_":"1.62","contracted_demand_excl_bess__mva_":"2.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 05","name":"Cumming Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"7.47","value":"7.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"725","AssetID":"S - ELGI - 05","map___license_area":"Scotland / SHEPD","Substation":"Cumming Street Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.71","minimum_observed_gross_demand__mva_":"2.60","contracted_demand_excl_bess__mva_":"4.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.11","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.36","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 06","name":"Elgin Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"7.20","value":"7.20","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"726","AssetID":"S - ELGI - 06","map___license_area":"Scotland / SHEPD","Substation":"Elgin Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.67","minimum_observed_gross_demand__mva_":"0.67","contracted_demand_excl_bess__mva_":"1.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.20","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.82","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 07","name":"Fochabers Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"727","AssetID":"S - ELGI - 07","map___license_area":"Scotland / SHEPD","Substation":"Fochabers Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.54","minimum_observed_gross_demand__mva_":"1.17","contracted_demand_excl_bess__mva_":"3.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 08","name":"Kinloss Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"728","AssetID":"S - ELGI - 08","map___license_area":"Scotland / SHEPD","Substation":"Kinloss Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.35","minimum_observed_gross_demand__mva_":"0.48","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.95","contracted_generation__mw_":"2.08","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-32","Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 09","name":"Lhanbryde Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"729","AssetID":"S - ELGI - 09","map___license_area":"Scotland / SHEPD","Substation":"Lhanbryde Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.52","minimum_observed_gross_demand__mva_":"0.22","contracted_demand_excl_bess__mva_":"0.36","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.24","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ELGI - 10","name":"Lossiemouth Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Elgin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"730","AssetID":"S - ELGI - 10","map___license_area":"Scotland / SHEPD","Substation":"Lossiemouth Primary","Upstream GSP":"Elgin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.81","minimum_observed_gross_demand__mva_":"0.55","contracted_demand_excl_bess__mva_":"0.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"6.67","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - FASN - 01","name":"Fasnakyle GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"49.90","technicalLimits":"No","rawSource":{"_id":"731","AssetID":"S - FASN - 01","map___license_area":"Scotland / SHEPD","Substation":"Fasnakyle GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"0.52","minimum_observed_gross_demand__mva_":"0.05","contracted_demand_excl_bess__mva_":"0.18","contracted_bess_demand__mva_":"49.90","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"86.50","contracted_generation__mw_":"112.30","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.70","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FASN - 02","name":"Fasnakyle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fasnakyle GSP","upstreamBsp":"N/A","demand":{"raw":"0.64","value":"0.64","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.93","value":"0.93","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"732","AssetID":"S - FASN - 02","map___license_area":"Scotland / SHEPD","Substation":"Fasnakyle Primary","Upstream GSP":"Fasnakyle GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.49","minimum_observed_gross_demand__mva_":"0.07","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.64","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.93","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"1.04","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 01","name":"Fort Augustus GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"5.79","technicalLimits":"Yes","rawSource":{"_id":"733","AssetID":"S - FAUG - 01","map___license_area":"Scotland / SHEPD","Substation":"Fort Augustus GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 90MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.51","minimum_observed_gross_demand__mva_":"1.96","contracted_demand_excl_bess__mva_":"38.32","contracted_bess_demand__mva_":"5.79","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"58.09","contracted_generation__mw_":"121.50","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.97","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 02","name":"Aberchalder Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"734","AssetID":"S - FAUG - 02","map___license_area":"Scotland / SHEPD","Substation":"Aberchalder Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.05","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 03","name":"Ardochy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"735","AssetID":"S - FAUG - 03","map___license_area":"Scotland / SHEPD","Substation":"Ardochy Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 04","name":"Bunoich Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"1.80","value":"1.80","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"736","AssetID":"S - FAUG - 04","map___license_area":"Scotland / SHEPD","Substation":"Bunoich Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.20","minimum_observed_gross_demand__mva_":"0.03","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.80","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"1.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 05","name":"Drumnadrochit Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"1.96","value":"1.96","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"737","AssetID":"S - FAUG - 05","map___license_area":"Scotland / SHEPD","Substation":"Drumnadrochit Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.89","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"1.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.96","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 06","name":"Glen Laogh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"738","AssetID":"S - FAUG - 06","map___license_area":"Scotland / SHEPD","Substation":"Glen Laogh Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 07","name":"Glendoe Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.71","value":"0.71","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"739","AssetID":"S - FAUG - 07","map___license_area":"Scotland / SHEPD","Substation":"Glendoe Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5/15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.99","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.71","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 08","name":"Invergarry Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.87","value":"0.87","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"740","AssetID":"S - FAUG - 08","map___license_area":"Scotland / SHEPD","Substation":"Invergarry Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.29","minimum_observed_gross_demand__mva_":"0.07","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.87","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"5.20","unsafe_3_phase_break_fault_level__ka_":"0.94","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FAUG - 09","name":"Wester Drummond Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort Augustus GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"741","AssetID":"S - FAUG - 09","map___license_area":"Scotland / SHEPD","Substation":"Wester Drummond Primary","Upstream GSP":"Fort Augustus GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"6.00","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FETT - 01","name":"Fetteresso GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"275 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"50.00","technicalLimits":"No","rawSource":{"_id":"742","AssetID":"S - FETT - 01","map___license_area":"Scotland / SHEPD","Substation":"Fetteresso GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"275 / 33","Transformer Nameplate Ratings":"1 x 120MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"50.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"71.25","contracted_generation__mw_":"178.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.12","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":null}},{"id":"S - FIDD - 01","name":"Fiddes GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"157.79","technicalLimits":"Yes","rawSource":{"_id":"743","AssetID":"S - FIDD - 01","map___license_area":"Scotland / SHEPD","Substation":"Fiddes GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.23","minimum_observed_gross_demand__mva_":"2.14","contracted_demand_excl_bess__mva_":"10.88","contracted_bess_demand__mva_":"157.79","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"97.85","contracted_generation__mw_":"308.93","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":null}},{"id":"S - FIDD - 02","name":"Edzell Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fiddes GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"744","AssetID":"S - FIDD - 02","map___license_area":"Scotland / SHEPD","Substation":"Edzell Primary","Upstream GSP":"Fiddes GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.44","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"1.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"2.98","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FIDD - 03","name":"Inverbervie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fiddes GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"745","AssetID":"S - FIDD - 03","map___license_area":"Scotland / SHEPD","Substation":"Inverbervie Primary","Upstream GSP":"Fiddes GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.49","minimum_observed_gross_demand__mva_":"0.50","contracted_demand_excl_bess__mva_":"0.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"3.80","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"4.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FIDD - 04","name":"Laurencekirk Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fiddes GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"746","AssetID":"S - FIDD - 04","map___license_area":"Scotland / SHEPD","Substation":"Laurencekirk Primary","Upstream GSP":"Fiddes GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.89","minimum_observed_gross_demand__mva_":"0.70","contracted_demand_excl_bess__mva_":"2.74","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"1.52","contracted_generation__mw_":"0.17","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.97","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FIDD - 05","name":"Stonehaven Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fiddes GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"747","AssetID":"S - FIDD - 05","map___license_area":"Scotland / SHEPD","Substation":"Stonehaven Primary","Upstream GSP":"Fiddes GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.30","minimum_observed_gross_demand__mva_":"1.97","contracted_demand_excl_bess__mva_":"6.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"3.94","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FRAS - 01","name":"Fraserburgh GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"154.76","technicalLimits":"Yes","rawSource":{"_id":"748","AssetID":"S - FRAS - 01","map___license_area":"Scotland / SHEPD","Substation":"Fraserburgh GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.71","minimum_observed_gross_demand__mva_":"7.21","contracted_demand_excl_bess__mva_":"4.60","contracted_bess_demand__mva_":"154.76","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"4.10","contracted_generation__mw_":"246.19","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.48","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FRAS - 02","name":"Fraserburgh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fraserburgh GSP","upstreamBsp":"N/A","demand":{"raw":"16.99","value":"16.99","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"749","AssetID":"S - FRAS - 02","map___license_area":"Scotland / SHEPD","Substation":"Fraserburgh Primary","Upstream GSP":"Fraserburgh GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.92","minimum_observed_gross_demand__mva_":"3.54","contracted_demand_excl_bess__mva_":"4.60","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"16.99","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"4.10","contracted_generation__mw_":"1.69","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 01","name":"Fort William GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"750","AssetID":"S - FWIL - 01","map___license_area":"Scotland / SHEPD","Substation":"Fort William GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"72.97","minimum_observed_gross_demand__mva_":"16.49","contracted_demand_excl_bess__mva_":"11.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"33.39","contracted_generation__mw_":"1.77","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.96","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 02","name":"Annat Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"6.34","value":"6.34","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"751","AssetID":"S - FWIL - 02","map___license_area":"Scotland / SHEPD","Substation":"Annat Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.66","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"6.34","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.14","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 03","name":"Arisaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"2.50","value":"2.50","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"752","AssetID":"S - FWIL - 03","map___license_area":"Scotland / SHEPD","Substation":"Arisaig Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.66","minimum_observed_gross_demand__mva_":"0.12","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"2.50","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.32","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 04","name":"Bunarkaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.24","value":"0.24","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"753","AssetID":"S - FWIL - 04","map___license_area":"Scotland / SHEPD","Substation":"Bunarkaig Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.24","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 05","name":"Corran Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.93","value":"0.93","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"754","AssetID":"S - FWIL - 05","map___license_area":"Scotland / SHEPD","Substation":"Corran Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.26","minimum_observed_gross_demand__mva_":"0.25","contracted_demand_excl_bess__mva_":"0.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.27","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.93","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.77","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-28","Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 06","name":"Fishnish Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.22","value":"0.22","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.20","value":"0.20","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"755","AssetID":"S - FWIL - 06","map___license_area":"Scotland / SHEPD","Substation":"Fishnish Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.22","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.20","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 07","name":"Glenuig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.08","value":"0.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.10","value":"0.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"756","AssetID":"S - FWIL - 07","map___license_area":"Scotland / SHEPD","Substation":"Glenuig Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.04","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.10","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 08","name":"Inverlochy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"12.21","value":"12.21","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"757","AssetID":"S - FWIL - 08","map___license_area":"Scotland / SHEPD","Substation":"Inverlochy Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.98","minimum_observed_gross_demand__mva_":"2.44","contracted_demand_excl_bess__mva_":"6.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"3.14","contracted_generation__mw_":"0.20","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"12.21","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.81","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-28","Substation Reinforcement Completion Date":"Sep-28"}},{"id":"S - FWIL - 09","name":"Kingairloch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.04","value":"0.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.02","value":"0.02","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"758","AssetID":"S - FWIL - 09","map___license_area":"Scotland / SHEPD","Substation":"Kingairloch Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.05","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.02","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 10","name":"Kinlochmoidart Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"2.32","value":"2.32","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.06","value":"0.06","unit":"MW","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"759","AssetID":"S - FWIL - 10","map___license_area":"Scotland / SHEPD","Substation":"Kinlochmoidart Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.04","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.32","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.90","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.06","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"1.24","Substation Generation RAG Status":"Amber","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 11","name":"Liddesdale Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.10","value":"0.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"760","AssetID":"S - FWIL - 11","map___license_area":"Scotland / SHEPD","Substation":"Liddesdale Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.10","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 12","name":"Lochaline Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"4.21","value":"4.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.66","value":"0.66","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"761","AssetID":"S - FWIL - 12","map___license_area":"Scotland / SHEPD","Substation":"Lochaline Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.25","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.74","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.66","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"1.74","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 13","name":"Mallaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"1.33","value":"1.33","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"762","AssetID":"S - FWIL - 13","map___license_area":"Scotland / SHEPD","Substation":"Mallaig Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.34","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.76","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"1.33","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.94","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 14","name":"Pinegrove Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"12.03","value":"12.03","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"763","AssetID":"S - FWIL - 14","map___license_area":"Scotland / SHEPD","Substation":"Pinegrove Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.00","minimum_observed_gross_demand__mva_":"1.54","contracted_demand_excl_bess__mva_":"0.54","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"12.03","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.07","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Sep-28","Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 15","name":"Poor House Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.10","value":"0.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"764","AssetID":"S - FWIL - 15","map___license_area":"Scotland / SHEPD","Substation":"Poor House Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.10","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 16","name":"Rahoy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"1.17","value":"1.17","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.67","value":"0.67","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"765","AssetID":"S - FWIL - 16","map___license_area":"Scotland / SHEPD","Substation":"Rahoy Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.17","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.29","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.67","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"0.72","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 17","name":"Salen, Mull Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.20","value":"0.20","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"2.75","value":"2.75","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"766","AssetID":"S - FWIL - 17","map___license_area":"Scotland / SHEPD","Substation":"Salen, Mull Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.58","minimum_observed_gross_demand__mva_":"0.37","contracted_demand_excl_bess__mva_":"0.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.20","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"2.75","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.56","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Dec-28","Substation Reinforcement Completion Date":"Dec-28"}},{"id":"S - FWIL - 18","name":"Shona Beg Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.10","value":"0.10","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"767","AssetID":"S - FWIL - 18","map___license_area":"Scotland / SHEPD","Substation":"Shona Beg Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.10","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - FWIL - 19","name":"Strontian Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Fort William GSP","upstreamBsp":"N/A","demand":{"raw":"2.02","value":"2.02","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.98","value":"0.98","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"768","AssetID":"S - FWIL - 19","map___license_area":"Scotland / SHEPD","Substation":"Strontian Primary","Upstream GSP":"Fort William GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.89","minimum_observed_gross_demand__mva_":"0.13","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.02","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.98","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.55","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GLAG - 01","name":"Glenagnes GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"769","AssetID":"S - GLAG - 01","map___license_area":"Scotland / SHEPD","Substation":"Glenagnes GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GLEF - 01","name":"Glenfarclas GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"770","AssetID":"S - GLEF - 01","map___license_area":"Scotland / SHEPD","Substation":"Glenfarclas GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 90MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"66.50","contracted_generation__mw_":"21.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.49","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 01","name":"Shetland / Gremista","area":"Scotland / SHEPD","level":"GSP","voltageKv":"11 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"97.23","technicalLimits":"No","rawSource":{"_id":"771","AssetID":"S - GREM - 01","map___license_area":"Scotland / SHEPD","Substation":"Shetland / Gremista","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"11 / 33","Transformer Nameplate Ratings":"N/A","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"30.79","minimum_observed_gross_demand__mva_":"4.53","contracted_demand_excl_bess__mva_":"29.10","contracted_bess_demand__mva_":"97.23","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"82.21","contracted_generation__mw_":"224.81","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"7.42","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Nov-26","Substation Reinforcement Completion Date":"Nov-26"}},{"id":"S - GREM - 02","name":"Brae Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"772","AssetID":"S - GREM - 02","map___license_area":"Scotland / SHEPD","Substation":"Brae Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.30","minimum_observed_gross_demand__mva_":"0.39","contracted_demand_excl_bess__mva_":"1.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"2.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 03","name":"Firth Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"773","AssetID":"S - GREM - 03","map___license_area":"Scotland / SHEPD","Substation":"Firth Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.32","minimum_observed_gross_demand__mva_":"0.25","contracted_demand_excl_bess__mva_":"0.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.67","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 04","name":"Lerwick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"6.19","value":"6.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"774","AssetID":"S - GREM - 04","map___license_area":"Scotland / SHEPD","Substation":"Lerwick Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"3 x 12 / 18MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.47","minimum_observed_gross_demand__mva_":"3.86","contracted_demand_excl_bess__mva_":"2.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"50kW","connected_generation__mw_":"56.68","contracted_generation__mw_":"22.11","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"7.42","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 05","name":"Gutcher Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"775","AssetID":"S - GREM - 05","map___license_area":"Scotland / SHEPD","Substation":"Gutcher Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.63","minimum_observed_gross_demand__mva_":"0.09","contracted_demand_excl_bess__mva_":"0.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.53","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - GREM - 06","name":"Mid Yell Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"776","AssetID":"S - GREM - 06","map___license_area":"Scotland / SHEPD","Substation":"Mid Yell Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.06","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.06","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 07","name":"Scalloway Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"777","AssetID":"S - GREM - 07","map___license_area":"Scotland / SHEPD","Substation":"Scalloway Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.70","minimum_observed_gross_demand__mva_":"0.83","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - GREM - 08","name":"Sandwick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"778","AssetID":"S - GREM - 08","map___license_area":"Scotland / SHEPD","Substation":"Sandwick Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.54","minimum_observed_gross_demand__mva_":"0.37","contracted_demand_excl_bess__mva_":"0.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"6.00","unsafe_3_phase_break_fault_level__ka_":"1.99","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - GREM - 09","name":"Sumburgh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"779","AssetID":"S - GREM - 09","map___license_area":"Scotland / SHEPD","Substation":"Sumburgh Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.60","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"0.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.50","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 10","name":"Tumblin Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"780","AssetID":"S - GREM - 10","map___license_area":"Scotland / SHEPD","Substation":"Tumblin Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.07","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"2.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 11","name":"Unst Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"781","AssetID":"S - GREM - 11","map___license_area":"Scotland / SHEPD","Substation":"Unst Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.13","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"0.64","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GREM - 12","name":"Voe Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shetland / Gremista","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"782","AssetID":"S - GREM - 12","map___license_area":"Scotland / SHEPD","Substation":"Voe Primary","Upstream GSP":"Shetland / Gremista","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 8MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.24","minimum_observed_gross_demand__mva_":"0.47","contracted_demand_excl_bess__mva_":"0.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"50kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-27","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 01","name":"Grudie Bridge GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"201.83","technicalLimits":"Yes","rawSource":{"_id":"783","AssetID":"S - GRUB - 01","map___license_area":"Scotland / SHEPD","Substation":"Grudie Bridge GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.32","minimum_observed_gross_demand__mva_":"3.79","contracted_demand_excl_bess__mva_":"3.85","contracted_bess_demand__mva_":"201.83","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"54.74","contracted_generation__mw_":"206.20","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 02","name":"Achiltibuie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"784","AssetID":"S - GRUB - 02","map___license_area":"Scotland / SHEPD","Substation":"Achiltibuie Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.90","minimum_observed_gross_demand__mva_":"0.13","contracted_demand_excl_bess__mva_":"0.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"8.00","unsafe_3_phase_break_fault_level__ka_":"0.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 03","name":"Aultbea Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"5.47","value":"5.47","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"785","AssetID":"S - GRUB - 03","map___license_area":"Scotland / SHEPD","Substation":"Aultbea Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.48","minimum_observed_gross_demand__mva_":"0.23","contracted_demand_excl_bess__mva_":"0.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.47","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.28","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.09","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 04","name":"Biden Clan Raonaild Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"786","AssetID":"S - GRUB - 04","map___license_area":"Scotland / SHEPD","Substation":"Biden Clan Raonaild Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 05","name":"Drumrunie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"787","AssetID":"S - GRUB - 05","map___license_area":"Scotland / SHEPD","Substation":"Drumrunie Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.16","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 06","name":"Garbat Forest Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"788","AssetID":"S - GRUB - 06","map___license_area":"Scotland / SHEPD","Substation":"Garbat Forest Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 07","name":"Inverbroom Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"789","AssetID":"S - GRUB - 07","map___license_area":"Scotland / SHEPD","Substation":"Inverbroom Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.12","minimum_observed_gross_demand__mva_":"0.03","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 08","name":"Kerry Falls Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"1.54","value":"1.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"790","AssetID":"S - GRUB - 08","map___license_area":"Scotland / SHEPD","Substation":"Kerry Falls Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.82","minimum_observed_gross_demand__mva_":"0.26","contracted_demand_excl_bess__mva_":"0.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.43","contracted_generation__mw_":"2.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"2.48","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 09","name":"Kinlochewe Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.27","value":"0.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"791","AssetID":"S - GRUB - 09","map___license_area":"Scotland / SHEPD","Substation":"Kinlochewe Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.82","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"0.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.94","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 10","name":"Letterewe Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"792","AssetID":"S - GRUB - 10","map___license_area":"Scotland / SHEPD","Substation":"Letterewe Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 11","name":"Loch Glascarnoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.56","value":"0.56","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"793","AssetID":"S - GRUB - 11","map___license_area":"Scotland / SHEPD","Substation":"Loch Glascarnoch Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.56","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 12","name":"Lochcarron Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"1.84","value":"1.84","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"794","AssetID":"S - GRUB - 12","map___license_area":"Scotland / SHEPD","Substation":"Lochcarron Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.09","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.84","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"1.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 13","name":"Lochinver Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"795","AssetID":"S - GRUB - 13","map___license_area":"Scotland / SHEPD","Substation":"Lochinver Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.25","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.23","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - GRUB - 14","name":"Ullapool Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Grudie Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"1.10","value":"1.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"796","AssetID":"S - GRUB - 14","map___license_area":"Scotland / SHEPD","Substation":"Ullapool Primary","Upstream GSP":"Grudie Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA + 1 x 4MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.07","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"0.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - INNE - 01","name":"Inverness GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"97.27","technicalLimits":"Yes","rawSource":{"_id":"797","AssetID":"S - INNE - 01","map___license_area":"Scotland / SHEPD","Substation":"Inverness GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA + 1 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"63.91","minimum_observed_gross_demand__mva_":"30.99","contracted_demand_excl_bess__mva_":"92.67","contracted_bess_demand__mva_":"97.27","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"74.19","contracted_generation__mw_":"116.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"17.12","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 02","name":"Culloden Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"798","AssetID":"S - INNE - 02","map___license_area":"Scotland / SHEPD","Substation":"Culloden Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.80","minimum_observed_gross_demand__mva_":"1.81","contracted_demand_excl_bess__mva_":"3.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.23","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-25","Substation Reinforcement Completion Date":"Jul-28"}},{"id":"S - INNE - 03","name":"Dalneigh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"799","AssetID":"S - INNE - 03","map___license_area":"Scotland / SHEPD","Substation":"Dalneigh Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 12 / 24MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.46","minimum_observed_gross_demand__mva_":"2.05","contracted_demand_excl_bess__mva_":"2.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.28","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 04","name":"Errogie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"800","AssetID":"S - INNE - 04","map___license_area":"Scotland / SHEPD","Substation":"Errogie Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.13","minimum_observed_gross_demand__mva_":"0.04","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.19","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.23","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 05","name":"Foyers Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"801","AssetID":"S - INNE - 05","map___license_area":"Scotland / SHEPD","Substation":"Foyers Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.36","minimum_observed_gross_demand__mva_":"0.05","contracted_demand_excl_bess__mva_":"0.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.39","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 06","name":"Hilton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"802","AssetID":"S - INNE - 06","map___license_area":"Scotland / SHEPD","Substation":"Hilton Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.17","minimum_observed_gross_demand__mva_":"2.66","contracted_demand_excl_bess__mva_":"6.82","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.53","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.88","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 07","name":"Inverarnie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"803","AssetID":"S - INNE - 07","map___license_area":"Scotland / SHEPD","Substation":"Inverarnie Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.95","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 08","name":"Inverness Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"804","AssetID":"S - INNE - 08","map___license_area":"Scotland / SHEPD","Substation":"Inverness Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.23","minimum_observed_gross_demand__mva_":"1.19","contracted_demand_excl_bess__mva_":"4.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 09","name":"Longman Drive Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"805","AssetID":"S - INNE - 09","map___license_area":"Scotland / SHEPD","Substation":"Longman Drive Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.30","minimum_observed_gross_demand__mva_":"1.63","contracted_demand_excl_bess__mva_":"3.85","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 10","name":"Raigmore Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"806","AssetID":"S - INNE - 10","map___license_area":"Scotland / SHEPD","Substation":"Raigmore Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.34","minimum_observed_gross_demand__mva_":"4.07","contracted_demand_excl_bess__mva_":"4.99","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.51","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-29","Substation Reinforcement Completion Date":null}},{"id":"S - INNE - 11","name":"Waterloo Place Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Inverness GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"807","AssetID":"S - INNE - 11","map___license_area":"Scotland / SHEPD","Substation":"Waterloo Place Primary","Upstream GSP":"Inverness GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"16.42","minimum_observed_gross_demand__mva_":"2.64","contracted_demand_excl_bess__mva_":"4.97","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"9.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-27"}},{"id":"S - KEIT (1) - 01","name":"Keith 1 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"271.65","technicalLimits":"No","rawSource":{"_id":"808","AssetID":"S - KEIT (1) - 01","map___license_area":"Scotland / SHEPD","Substation":"Keith 1 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"23.84","minimum_observed_gross_demand__mva_":"11.47","contracted_demand_excl_bess__mva_":"17.81","contracted_bess_demand__mva_":"271.65","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"86.88","contracted_generation__mw_":"291.47","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"12.26","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (1) - 02","name":"Buckie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"809","AssetID":"S - KEIT (1) - 02","map___license_area":"Scotland / SHEPD","Substation":"Buckie Primary","Upstream GSP":"Keith 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.92","minimum_observed_gross_demand__mva_":"2.17","contracted_demand_excl_bess__mva_":"3.57","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"2.37","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (1) - 03","name":"Cullen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"810","AssetID":"S - KEIT (1) - 03","map___license_area":"Scotland / SHEPD","Substation":"Cullen Primary","Upstream GSP":"Keith 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.52","minimum_observed_gross_demand__mva_":"0.36","contracted_demand_excl_bess__mva_":"0.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"4.04","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (1) - 04","name":"Limehillocks Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 1 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"811","AssetID":"S - KEIT (1) - 04","map___license_area":"Scotland / SHEPD","Substation":"Limehillocks Primary","Upstream GSP":"Keith 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.81","minimum_observed_gross_demand__mva_":"0.26","contracted_demand_excl_bess__mva_":"0.10","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"2.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (1) - 05","name":"Marnoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 1 GSP","upstreamBsp":"N/A","demand":{"raw":"1.54","value":"1.54","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"812","AssetID":"S - KEIT (1) - 05","map___license_area":"Scotland / SHEPD","Substation":"Marnoch Primary","Upstream GSP":"Keith 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA + 1 x 6MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.49","minimum_observed_gross_demand__mva_":"0.65","contracted_demand_excl_bess__mva_":"0.79","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.54","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"5.39","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.66","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (2) - 01","name":"Keith 2 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"312.33","technicalLimits":"No","rawSource":{"_id":"813","AssetID":"S - KEIT (2) - 01","map___license_area":"Scotland / SHEPD","Substation":"Keith 2 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"31.08","minimum_observed_gross_demand__mva_":"16.21","contracted_demand_excl_bess__mva_":"9.48","contracted_bess_demand__mva_":"312.33","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"72.71","contracted_generation__mw_":"376.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.59","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - KEIT (2) - 02","name":"Aberlour Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"814","AssetID":"S - KEIT (2) - 02","map___license_area":"Scotland / SHEPD","Substation":"Aberlour Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.20","minimum_observed_gross_demand__mva_":"0.75","contracted_demand_excl_bess__mva_":"2.92","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.60","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (2) - 03","name":"Dufftown Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"0.07","value":"0.07","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"815","AssetID":"S - KEIT (2) - 03","map___license_area":"Scotland / SHEPD","Substation":"Dufftown Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.37","minimum_observed_gross_demand__mva_":"0.96","contracted_demand_excl_bess__mva_":"1.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.07","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.61","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"S - KEIT (2) - 04","name":"Huntly Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"8.08","value":"8.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"816","AssetID":"S - KEIT (2) - 04","map___license_area":"Scotland / SHEPD","Substation":"Huntly Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.87","minimum_observed_gross_demand__mva_":"0.85","contracted_demand_excl_bess__mva_":"1.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"8.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.31","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (2) - 05","name":"Insch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"0.53","value":"0.53","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"817","AssetID":"S - KEIT (2) - 05","map___license_area":"Scotland / SHEPD","Substation":"Insch Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.42","minimum_observed_gross_demand__mva_":"0.93","contracted_demand_excl_bess__mva_":"0.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.53","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.85","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.94","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - KEIT (2) - 06","name":"Keith Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"6.42","value":"6.42","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"818","AssetID":"S - KEIT (2) - 06","map___license_area":"Scotland / SHEPD","Substation":"Keith Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.45","minimum_observed_gross_demand__mva_":"1.63","contracted_demand_excl_bess__mva_":"1.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.42","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.12","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KEIT (2) - 07","name":"Rothes Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Keith 2 GSP","upstreamBsp":"N/A","demand":{"raw":"0.51","value":"0.51","unit":"MVA","availability":"reported-numeric","rag":"Amber","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"819","AssetID":"S - KEIT (2) - 07","map___license_area":"Scotland / SHEPD","Substation":"Rothes Primary","Upstream GSP":"Keith 2 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.00","minimum_observed_gross_demand__mva_":"0.81","contracted_demand_excl_bess__mva_":"1.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.51","Substation Demand RAG Status":"Amber","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.06","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - KIIN - 01","name":"Killin GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"102.34","technicalLimits":"No","rawSource":{"_id":"820","AssetID":"S - KIIN - 01","map___license_area":"Scotland / SHEPD","Substation":"Killin GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.43","minimum_observed_gross_demand__mva_":"3.54","contracted_demand_excl_bess__mva_":"15.43","contracted_bess_demand__mva_":"102.34","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"27.14","contracted_generation__mw_":"92.50","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.33","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 02","name":"Ardchyle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"821","AssetID":"S - KIIN - 02","map___license_area":"Scotland / SHEPD","Substation":"Ardchyle Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 03","name":"Cashlie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"1.04","value":"1.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"822","AssetID":"S - KIIN - 03","map___license_area":"Scotland / SHEPD","Substation":"Cashlie Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.13","minimum_observed_gross_demand__mva_":"0.03","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.89","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 04","name":"Chaorach Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"823","AssetID":"S - KIIN - 04","map___license_area":"Scotland / SHEPD","Substation":"Chaorach Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.23","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"3.52","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"2.49","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 05","name":"Killin Town Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"824","AssetID":"S - KIIN - 05","map___license_area":"Scotland / SHEPD","Substation":"Killin Town Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.19","minimum_observed_gross_demand__mva_":"0.17","contracted_demand_excl_bess__mva_":"0.13","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 06","name":"Lochearnhead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"825","AssetID":"S - KIIN - 06","map___license_area":"Scotland / SHEPD","Substation":"Lochearnhead Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.64","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"2.02","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.68","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KIIN - 07","name":"Lubnaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Killin GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"826","AssetID":"S - KIIN - 07","map___license_area":"Scotland / SHEPD","Substation":"Lubnaig Primary","Upstream GSP":"Killin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINL - 01","name":"Kinlochleven GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"827","AssetID":"S - KINL - 01","map___license_area":"Scotland / SHEPD","Substation":"Kinlochleven GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 45MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"26.45","minimum_observed_gross_demand__mva_":"4.27","contracted_demand_excl_bess__mva_":"0.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"5.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.94","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINL - 02","name":"Glencoe Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kinlochleven GSP","upstreamBsp":"N/A","demand":{"raw":"1.12","value":"1.12","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"2.72","value":"2.72","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"828","AssetID":"S - KINL - 02","map___license_area":"Scotland / SHEPD","Substation":"Glencoe Primary","Upstream GSP":"Kinlochleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.9MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.09","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"0.10","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.12","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.67","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"2.72","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.18","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINL - 03","name":"Glenetive Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kinlochleven GSP","upstreamBsp":"N/A","demand":{"raw":"0.34","value":"0.34","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.29","value":"0.29","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"829","AssetID":"S - KINL - 03","map___license_area":"Scotland / SHEPD","Substation":"Glenetive Primary","Upstream GSP":"Kinlochleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.34","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.29","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.29","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINL - 04","name":"Kinlochleven Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kinlochleven GSP","upstreamBsp":"N/A","demand":{"raw":"2.03","value":"2.03","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.54","value":"0.54","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"830","AssetID":"S - KINL - 04","map___license_area":"Scotland / SHEPD","Substation":"Kinlochleven Primary","Upstream GSP":"Kinlochleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.18","minimum_observed_gross_demand__mva_":"0.17","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.03","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.54","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"2.20","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 01","name":"Kintore GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"213.48","technicalLimits":"Yes","rawSource":{"_id":"831","AssetID":"S - KINT - 01","map___license_area":"Scotland / SHEPD","Substation":"Kintore GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA + 1 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"101.39","minimum_observed_gross_demand__mva_":"19.15","contracted_demand_excl_bess__mva_":"14.66","contracted_bess_demand__mva_":"213.48","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"80.88","contracted_generation__mw_":"352.67","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"20.77","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - KINT - 02","name":"Banchory Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"832","AssetID":"S - KINT - 02","map___license_area":"Scotland / SHEPD","Substation":"Banchory Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7 / 14MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.34","minimum_observed_gross_demand__mva_":"1.58","contracted_demand_excl_bess__mva_":"4.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"2.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"6.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-29","Substation Reinforcement Completion Date":"Oct-29"}},{"id":"S - KINT - 03","name":"Fyvie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"833","AssetID":"S - KINT - 03","map___license_area":"Scotland / SHEPD","Substation":"Fyvie Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4 / 8MVA + 1 x 6MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.56","minimum_observed_gross_demand__mva_":"0.66","contracted_demand_excl_bess__mva_":"0.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"5.99","contracted_generation__mw_":"0.18","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"5.75","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-27","Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 04","name":"Inverurie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"12.21","value":"12.21","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"834","AssetID":"S - KINT - 04","map___license_area":"Scotland / SHEPD","Substation":"Inverurie Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA + 2 x 14 / 17MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.93","minimum_observed_gross_demand__mva_":"2.01","contracted_demand_excl_bess__mva_":"3.21","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.21","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.75","contracted_generation__mw_":"0.16","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.40","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 05","name":"Kemnay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"10.76","value":"10.76","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"835","AssetID":"S - KINT - 05","map___license_area":"Scotland / SHEPD","Substation":"Kemnay Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.67","minimum_observed_gross_demand__mva_":"0.53","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.76","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.27","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 06","name":"Methlick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"836","AssetID":"S - KINT - 06","map___license_area":"Scotland / SHEPD","Substation":"Methlick Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA + 1 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.95","minimum_observed_gross_demand__mva_":"0.31","contracted_demand_excl_bess__mva_":"0.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.12","contracted_generation__mw_":"0.11","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-28","Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - KINT - 07","name":"Midmar Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"3.09","value":"3.09","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"837","AssetID":"S - KINT - 07","map___license_area":"Scotland / SHEPD","Substation":"Midmar Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.56","minimum_observed_gross_demand__mva_":"0.37","contracted_demand_excl_bess__mva_":"0.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.09","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.50","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.00","unsafe_3_phase_break_fault_level__ka_":"2.84","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"S - KINT - 08","name":"Oldmeldrum Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"838","AssetID":"S - KINT - 08","map___license_area":"Scotland / SHEPD","Substation":"Oldmeldrum Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.51","minimum_observed_gross_demand__mva_":"0.79","contracted_demand_excl_bess__mva_":"1.10","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"1.52","contracted_generation__mw_":"0.22","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.70","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - KINT - 09","name":"Park Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"4.91","value":"4.91","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"839","AssetID":"S - KINT - 09","map___license_area":"Scotland / SHEPD","Substation":"Park Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.06","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"0.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.91","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"4.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Oct-29","Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 10","name":"Skene Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"13.43","value":"13.43","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"840","AssetID":"S - KINT - 10","map___license_area":"Scotland / SHEPD","Substation":"Skene Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.13","minimum_observed_gross_demand__mva_":"2.79","contracted_demand_excl_bess__mva_":"2.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"13.43","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.43","contracted_generation__mw_":"0.04","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.43","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - KINT - 11","name":"Torryburn Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Kintore GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"841","AssetID":"S - KINT - 11","map___license_area":"Scotland / SHEPD","Substation":"Torryburn Primary","Upstream GSP":"Kintore GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.56","minimum_observed_gross_demand__mva_":"1.38","contracted_demand_excl_bess__mva_":"2.42","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"1.05","contracted_generation__mw_":"0.81","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LAIR - 01","name":"Lairg GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"104.78","technicalLimits":"No","rawSource":{"_id":"842","AssetID":"S - LAIR - 01","map___license_area":"Scotland / SHEPD","Substation":"Lairg GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 90MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.11","minimum_observed_gross_demand__mva_":"1.30","contracted_demand_excl_bess__mva_":"0.14","contracted_bess_demand__mva_":"104.78","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"58.29","contracted_generation__mw_":"134.77","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"5.91","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LAIR - 02","name":"Lairg Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lairg GSP","upstreamBsp":"N/A","demand":{"raw":"1.59","value":"1.59","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"843","AssetID":"S - LAIR - 02","map___license_area":"Scotland / SHEPD","Substation":"Lairg Primary","Upstream GSP":"Lairg GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.28","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"0.14","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.59","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - LAIR - 03","name":"Torboll Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lairg GSP","upstreamBsp":"N/A","demand":{"raw":"0.11","value":"0.11","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"844","AssetID":"S - LAIR - 03","map___license_area":"Scotland / SHEPD","Substation":"Torboll Primary","Upstream GSP":"Lairg GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.11","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LAIR - 04","name":"Tressady Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lairg GSP","upstreamBsp":"N/A","demand":{"raw":"0.25","value":"0.25","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"845","AssetID":"S - LAIR - 04","map___license_area":"Scotland / SHEPD","Substation":"Tressady Primary","Upstream GSP":"Lairg GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.34","minimum_observed_gross_demand__mva_":"0.08","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.25","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.49","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-29","Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 01","name":"Lunanhead GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"250.13","technicalLimits":"Yes","rawSource":{"_id":"846","AssetID":"S - LUNA - 01","map___license_area":"Scotland / SHEPD","Substation":"Lunanhead GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"51.32","minimum_observed_gross_demand__mva_":"1.79","contracted_demand_excl_bess__mva_":"4.70","contracted_bess_demand__mva_":"250.13","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"12.92","contracted_generation__mw_":"477.90","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.68","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-26","Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 02","name":"Friockheim Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lunanhead GSP","upstreamBsp":"N/A","demand":{"raw":"2.52","value":"2.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"847","AssetID":"S - LUNA - 02","map___license_area":"Scotland / SHEPD","Substation":"Friockheim Primary","Upstream GSP":"Lunanhead GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.25","minimum_observed_gross_demand__mva_":"0.47","contracted_demand_excl_bess__mva_":"0.22","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.80","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"3.71","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 03","name":"Inverarity Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lunanhead GSP","upstreamBsp":"N/A","demand":{"raw":"2.26","value":"2.26","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"848","AssetID":"S - LUNA - 03","map___license_area":"Scotland / SHEPD","Substation":"Inverarity Primary","Upstream GSP":"Lunanhead GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.69","minimum_observed_gross_demand__mva_":"0.10","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.26","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.69","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 04","name":"Lochside Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lunanhead GSP","upstreamBsp":"N/A","demand":{"raw":"7.52","value":"7.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"849","AssetID":"S - LUNA - 04","map___license_area":"Scotland / SHEPD","Substation":"Lochside Primary","Upstream GSP":"Lunanhead GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.03","minimum_observed_gross_demand__mva_":"3.99","contracted_demand_excl_bess__mva_":"2.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.22","contracted_generation__mw_":"5.98","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 05","name":"Lunanhead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lunanhead GSP","upstreamBsp":"N/A","demand":{"raw":"7.15","value":"7.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"850","AssetID":"S - LUNA - 05","map___license_area":"Scotland / SHEPD","Substation":"Lunanhead Primary","Upstream GSP":"Lunanhead GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.84","minimum_observed_gross_demand__mva_":"0.99","contracted_demand_excl_bess__mva_":"0.93","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"3.73","contracted_generation__mw_":"0.97","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LUNA - 06","name":"Maryton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lunanhead GSP","upstreamBsp":"N/A","demand":{"raw":"7.41","value":"7.41","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"851","AssetID":"S - LUNA - 06","map___license_area":"Scotland / SHEPD","Substation":"Maryton Primary","Upstream GSP":"Lunanhead GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.64","minimum_observed_gross_demand__mva_":"0.96","contracted_demand_excl_bess__mva_":"1.12","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.41","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.66","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.02","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LYND - 01","name":"Lyndhurst GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"52.53","technicalLimits":"No","rawSource":{"_id":"852","AssetID":"S - LYND - 01","map___license_area":"Scotland / SHEPD","Substation":"Lyndhurst GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"68.39","minimum_observed_gross_demand__mva_":"6.78","contracted_demand_excl_bess__mva_":"7.87","contracted_bess_demand__mva_":"52.53","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"47.41","contracted_generation__mw_":"210.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"15.28","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-31","Substation Reinforcement Completion Date":null}},{"id":"S - LYND - 02","name":"Lochee Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lyndhurst GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"853","AssetID":"S - LYND - 02","map___license_area":"Scotland / SHEPD","Substation":"Lochee Primary","Upstream GSP":"Lyndhurst GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.70","minimum_observed_gross_demand__mva_":"1.08","contracted_demand_excl_bess__mva_":"0.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.52","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LYND - 03","name":"Lyndhurst Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lyndhurst GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"854","AssetID":"S - LYND - 03","map___license_area":"Scotland / SHEPD","Substation":"Lyndhurst Primary","Upstream GSP":"Lyndhurst GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.82","minimum_observed_gross_demand__mva_":"1.31","contracted_demand_excl_bess__mva_":"2.90","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LYND - 04","name":"MacAlpine Road Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lyndhurst GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"855","AssetID":"S - LYND - 04","map___license_area":"Scotland / SHEPD","Substation":"MacAlpine Road Primary","Upstream GSP":"Lyndhurst GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.87","minimum_observed_gross_demand__mva_":"1.18","contracted_demand_excl_bess__mva_":"1.20","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - LYND - 05","name":"West Kirkton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Lyndhurst GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"856","AssetID":"S - LYND - 05","map___license_area":"Scotland / SHEPD","Substation":"West Kirkton Primary","Upstream GSP":"Lyndhurst GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.39","minimum_observed_gross_demand__mva_":"1.06","contracted_demand_excl_bess__mva_":"2.86","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.57","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MACD - 01","name":"Macduff GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"175.06","technicalLimits":"Yes","rawSource":{"_id":"857","AssetID":"S - MACD - 01","map___license_area":"Scotland / SHEPD","Substation":"Macduff GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.97","minimum_observed_gross_demand__mva_":"6.22","contracted_demand_excl_bess__mva_":"2.24","contracted_bess_demand__mva_":"175.06","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"93.92","contracted_generation__mw_":"328.17","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.15","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MACD - 02","name":"Macduff Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Macduff GSP","upstreamBsp":"N/A","demand":{"raw":"12.77","value":"12.77","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"858","AssetID":"S - MACD - 02","map___license_area":"Scotland / SHEPD","Substation":"Macduff Primary","Upstream GSP":"Macduff GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.85","minimum_observed_gross_demand__mva_":"1.42","contracted_demand_excl_bess__mva_":"1.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"12.77","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"5.83","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.57","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MACD - 03","name":"Portsoy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Macduff GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"859","AssetID":"S - MACD - 03","map___license_area":"Scotland / SHEPD","Substation":"Portsoy Primary","Upstream GSP":"Macduff GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.85","minimum_observed_gross_demand__mva_":"0.41","contracted_demand_excl_bess__mva_":"0.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.42","contracted_generation__mw_":"0.35","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"4.17","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MACD - 04","name":"Turriff Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Macduff GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"860","AssetID":"S - MACD - 04","map___license_area":"Scotland / SHEPD","Substation":"Turriff Primary","Upstream GSP":"Macduff GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.03","minimum_observed_gross_demand__mva_":"1.45","contracted_demand_excl_bess__mva_":"0.93","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"9.25","contracted_generation__mw_":"0.11","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.54","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 01","name":"Milton of Craigie GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"99.90","technicalLimits":"No","rawSource":{"_id":"861","AssetID":"S - MILC - 01","map___license_area":"Scotland / SHEPD","Substation":"Milton of Craigie GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"44.33","minimum_observed_gross_demand__mva_":"19.36","contracted_demand_excl_bess__mva_":"17.22","contracted_bess_demand__mva_":"99.90","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"23.86","contracted_generation__mw_":"168.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"12.40","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 02","name":"Ashludie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"862","AssetID":"S - MILC - 02","map___license_area":"Scotland / SHEPD","Substation":"Ashludie Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.88","minimum_observed_gross_demand__mva_":"2.00","contracted_demand_excl_bess__mva_":"1.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.13","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.99","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - MILC - 03","name":"Baldovie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"7.55","value":"7.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"863","AssetID":"S - MILC - 03","map___license_area":"Scotland / SHEPD","Substation":"Baldovie Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.82","minimum_observed_gross_demand__mva_":"1.27","contracted_demand_excl_bess__mva_":"0.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"4.34","contracted_generation__mw_":"0.03","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 04","name":"Broughty Ferry Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"5.52","value":"5.52","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"864","AssetID":"S - MILC - 04","map___license_area":"Scotland / SHEPD","Substation":"Broughty Ferry Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.60","minimum_observed_gross_demand__mva_":"1.34","contracted_demand_excl_bess__mva_":"1.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.52","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"9.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 05","name":"Edzell Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"7.55","value":"7.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"865","AssetID":"S - MILC - 05","map___license_area":"Scotland / SHEPD","Substation":"Edzell Street Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 10MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.69","minimum_observed_gross_demand__mva_":"0.39","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 06","name":"Longhaugh Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"7.55","value":"7.55","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"866","AssetID":"S - MILC - 06","map___license_area":"Scotland / SHEPD","Substation":"Longhaugh Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.33","minimum_observed_gross_demand__mva_":"1.97","contracted_demand_excl_bess__mva_":"5.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.55","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"5.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 07","name":"Milton of Craigie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"0.32","value":"0.32","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"867","AssetID":"S - MILC - 07","map___license_area":"Scotland / SHEPD","Substation":"Milton of Craigie Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.52","minimum_observed_gross_demand__mva_":"1.37","contracted_demand_excl_bess__mva_":"6.76","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.32","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"8.27","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"9.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MILC - 08","name":"Old Craigie Road Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Milton of Craigie GSP","upstreamBsp":"N/A","demand":{"raw":"6.86","value":"6.86","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"868","AssetID":"S - MILC - 08","map___license_area":"Scotland / SHEPD","Substation":"Old Craigie Road Primary","Upstream GSP":"Milton of Craigie GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.38","minimum_observed_gross_demand__mva_":"0.85","contracted_demand_excl_bess__mva_":"1.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.86","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.14","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MYBS (1) - 01","name":"Mybster 1 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"89.73","technicalLimits":"Yes","rawSource":{"_id":"869","AssetID":"S - MYBS (1) - 01","map___license_area":"Scotland / SHEPD","Substation":"Mybster 1 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"21.12","minimum_observed_gross_demand__mva_":"5.16","contracted_demand_excl_bess__mva_":"4.34","contracted_bess_demand__mva_":"89.73","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"84.93","contracted_generation__mw_":"287.39","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.68","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MYBS (1) - 02","name":"Latheron Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mybster 1 GSP","upstreamBsp":"N/A","demand":{"raw":"1.12","value":"1.12","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"870","AssetID":"S - MYBS (1) - 02","map___license_area":"Scotland / SHEPD","Substation":"Latheron Primary","Upstream GSP":"Mybster 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.84","minimum_observed_gross_demand__mva_":"0.33","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.12","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.26","contracted_generation__mw_":"0.08","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"2.25","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MYBS (1) - 03","name":"Wick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Mybster 1 GSP","upstreamBsp":"N/A","demand":{"raw":"5.05","value":"5.05","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"871","AssetID":"S - MYBS (1) - 03","map___license_area":"Scotland / SHEPD","Substation":"Wick Primary","Upstream GSP":"Mybster 1 GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.26","minimum_observed_gross_demand__mva_":"1.19","contracted_demand_excl_bess__mva_":"2.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.05","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.57","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.79","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - MYBS (2) - 01","name":"Mybster 2 GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"76.35","technicalLimits":"No","rawSource":{"_id":"872","AssetID":"S - MYBS (2) - 01","map___license_area":"Scotland / SHEPD","Substation":"Mybster 2 GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"76.35","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"106.00","contracted_generation__mw_":"215.90","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.60","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - NAIR - 01","name":"Nairn GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"181.91","technicalLimits":"No","rawSource":{"_id":"873","AssetID":"S - NAIR - 01","map___license_area":"Scotland / SHEPD","Substation":"Nairn GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.35","minimum_observed_gross_demand__mva_":"17.32","contracted_demand_excl_bess__mva_":"75.03","contracted_bess_demand__mva_":"181.91","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.64","contracted_generation__mw_":"180.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.32","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-27","Substation Reinforcement Completion Date":null}},{"id":"S - NAIR - 02","name":"Ardersier Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nairn GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"874","AssetID":"S - NAIR - 02","map___license_area":"Scotland / SHEPD","Substation":"Ardersier Primary","Upstream GSP":"Nairn GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.29","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"0.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - NAIR - 03","name":"Dalcross Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nairn GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"875","AssetID":"S - NAIR - 03","map___license_area":"Scotland / SHEPD","Substation":"Dalcross Primary","Upstream GSP":"Nairn GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.41","minimum_observed_gross_demand__mva_":"0.49","contracted_demand_excl_bess__mva_":"3.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.47","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"5.41","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-26","Substation Reinforcement Completion Date":null}},{"id":"S - NAIR - 04","name":"Forres Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nairn GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"876","AssetID":"S - NAIR - 04","map___license_area":"Scotland / SHEPD","Substation":"Forres Primary","Upstream GSP":"Nairn GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.14","minimum_observed_gross_demand__mva_":"1.80","contracted_demand_excl_bess__mva_":"2.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.07","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.91","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-32","Substation Reinforcement Completion Date":"Jun-32"}},{"id":"S - NAIR - 05","name":"Lethen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nairn GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"877","AssetID":"S - NAIR - 05","map___license_area":"Scotland / SHEPD","Substation":"Lethen Primary","Upstream GSP":"Nairn GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.72","minimum_observed_gross_demand__mva_":"0.26","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.09","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.67","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-32","Substation Reinforcement Completion Date":null}},{"id":"S - NAIR - 06","name":"Nairn Central Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Nairn GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"878","AssetID":"S - NAIR - 06","map___license_area":"Scotland / SHEPD","Substation":"Nairn Central Primary","Upstream GSP":"Nairn GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.60","minimum_observed_gross_demand__mva_":"2.13","contracted_demand_excl_bess__mva_":"3.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.71","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.13","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ORRI - 01","name":"Orrin GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"879","AssetID":"S - ORRI - 01","map___license_area":"Scotland / SHEPD","Substation":"Orrin GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"1 x 60MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"40.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.25","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PEHG - 01","name":"Peterhead Grange GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"100.69","technicalLimits":"Yes","rawSource":{"_id":"880","AssetID":"S - PEHG - 01","map___license_area":"Scotland / SHEPD","Substation":"Peterhead Grange GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 45MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.80","minimum_observed_gross_demand__mva_":"8.03","contracted_demand_excl_bess__mva_":"117.15","contracted_bess_demand__mva_":"100.69","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"29.31","contracted_generation__mw_":"201.28","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.59","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PEHG - 02","name":"Peterhead Grange Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Peterhead Grange GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"881","AssetID":"S - PEHG - 02","map___license_area":"Scotland / SHEPD","Substation":"Peterhead Grange Primary","Upstream GSP":"Peterhead Grange GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.09","minimum_observed_gross_demand__mva_":"2.54","contracted_demand_excl_bess__mva_":"6.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.81","contracted_generation__mw_":"0.91","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PEHG - 03","name":"Peterhead North Street Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Peterhead Grange GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"882","AssetID":"S - PEHG - 03","map___license_area":"Scotland / SHEPD","Substation":"Peterhead North Street Primary","Upstream GSP":"Peterhead Grange GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.33","minimum_observed_gross_demand__mva_":"2.21","contracted_demand_excl_bess__mva_":"4.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.53","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PEHS - 01","name":"Peterhead Shell GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"883","AssetID":"S - PEHS - 01","map___license_area":"Scotland / SHEPD","Substation":"Peterhead Shell GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"8.88","minimum_observed_gross_demand__mva_":"6.05","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"11.85","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PEHS - 02","name":"Boddam Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Peterhead Shell GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"7.30","value":"7.30","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"884","AssetID":"S - PEHS - 02","map___license_area":"Scotland / SHEPD","Substation":"Boddam Primary","Upstream GSP":"Peterhead Shell GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"7.14","minimum_observed_gross_demand__mva_":"1.17","contracted_demand_excl_bess__mva_":"1.41","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"7.30","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.76","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 01","name":"Persley GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"885","AssetID":"S - PERS - 01","map___license_area":"Scotland / SHEPD","Substation":"Persley GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"41.36","minimum_observed_gross_demand__mva_":"18.34","contracted_demand_excl_bess__mva_":"17.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"5.89","contracted_generation__mw_":"113.88","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"26.20","unsafe_3_phase_break_fault_level__ka_":"11.82","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 02","name":"Bridge of Don Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Persley GSP","upstreamBsp":"N/A","demand":{"raw":"5.08","value":"5.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"11.46","value":"11.46","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"886","AssetID":"S - PERS - 02","map___license_area":"Scotland / SHEPD","Substation":"Bridge of Don Primary","Upstream GSP":"Persley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.50","minimum_observed_gross_demand__mva_":"2.50","contracted_demand_excl_bess__mva_":"6.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"3.89","contracted_generation__mw_":"0.26","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"11.46","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.71","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Feb-29","Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 03","name":"Haudagain Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Persley GSP","upstreamBsp":"N/A","demand":{"raw":"10.31","value":"10.31","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"18.94","value":"18.94","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"887","AssetID":"S - PERS - 03","map___license_area":"Scotland / SHEPD","Substation":"Haudagain Primary","Upstream GSP":"Persley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 20MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.51","minimum_observed_gross_demand__mva_":"1.59","contracted_demand_excl_bess__mva_":"3.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.31","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.13","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"18.94","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.23","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 04","name":"St Machar Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Persley GSP","upstreamBsp":"N/A","demand":{"raw":"15.14","value":"15.14","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"19.89","value":"19.89","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"888","AssetID":"S - PERS - 04","map___license_area":"Scotland / SHEPD","Substation":"St Machar Primary","Upstream GSP":"Persley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.65","minimum_observed_gross_demand__mva_":"1.10","contracted_demand_excl_bess__mva_":"0.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"15.14","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.00","contracted_generation__mw_":"0.19","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"19.89","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.35","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 05","name":"Stoneywood (T1 & T2) Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Persley GSP","upstreamBsp":"N/A","demand":{"raw":"14.05","value":"14.05","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"22.27","value":"22.27","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"889","AssetID":"S - PERS - 05","map___license_area":"Scotland / SHEPD","Substation":"Stoneywood (T1 & T2) Primary","Upstream GSP":"Persley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.95","minimum_observed_gross_demand__mva_":"1.29","contracted_demand_excl_bess__mva_":"0.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"14.05","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"22.27","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"10.00","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"S - PERS - 06","name":"Whitestripes Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Persley GSP","upstreamBsp":"N/A","demand":{"raw":"2.27","value":"2.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"14.62","value":"14.62","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"890","AssetID":"S - PERS - 06","map___license_area":"Scotland / SHEPD","Substation":"Whitestripes Primary","Upstream GSP":"Persley GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"7.00","minimum_observed_gross_demand__mva_":"1.51","contracted_demand_excl_bess__mva_":"6.67","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"14.62","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.16","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 01","name":"Port Ann GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"891","AssetID":"S - PORA - 01","map___license_area":"Scotland / SHEPD","Substation":"Port Ann GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.63","minimum_observed_gross_demand__mva_":"11.71","contracted_demand_excl_bess__mva_":"9.91","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"35.69","contracted_generation__mw_":"105.77","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"9.48","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-28","Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - PORA - 02","name":"Airigh-Na-Brodaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"892","AssetID":"S - PORA - 02","map___license_area":"Scotland / SHEPD","Substation":"Airigh-Na-Brodaig Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.03","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 03","name":"Bowmore Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"893","AssetID":"S - PORA - 03","map___license_area":"Scotland / SHEPD","Substation":"Bowmore Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.86","minimum_observed_gross_demand__mva_":"0.41","contracted_demand_excl_bess__mva_":"0.84","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"5.70","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 04","name":"Crinan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"894","AssetID":"S - PORA - 04","map___license_area":"Scotland / SHEPD","Substation":"Crinan Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.89","minimum_observed_gross_demand__mva_":"0.13","contracted_demand_excl_bess__mva_":"0.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"8.00","unsafe_3_phase_break_fault_level__ka_":"1.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 05","name":"Cromalt Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"895","AssetID":"S - PORA - 05","map___license_area":"Scotland / SHEPD","Substation":"Cromalt Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.80","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-30"}},{"id":"S - PORA - 06","name":"Inverneil Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"896","AssetID":"S - PORA - 06","map___license_area":"Scotland / SHEPD","Substation":"Inverneil Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.74","minimum_observed_gross_demand__mva_":"0.11","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.33","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 07","name":"Lochgilphead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"897","AssetID":"S - PORA - 07","map___license_area":"Scotland / SHEPD","Substation":"Lochgilphead Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.48","minimum_observed_gross_demand__mva_":"0.93","contracted_demand_excl_bess__mva_":"1.28","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.17","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"7.29","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 08","name":"Lussagiven Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"898","AssetID":"S - PORA - 08","map___license_area":"Scotland / SHEPD","Substation":"Lussagiven Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.06","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 09","name":"Port Askaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"899","AssetID":"S - PORA - 09","map___license_area":"Scotland / SHEPD","Substation":"Port Askaig Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.21","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"1.16","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"1.38","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-32","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 10","name":"Port Ellen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"900","AssetID":"S - PORA - 10","map___license_area":"Scotland / SHEPD","Substation":"Port Ellen Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.49","minimum_observed_gross_demand__mva_":"0.60","contracted_demand_excl_bess__mva_":"3.19","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.31","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.14","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 11","name":"Stonefield Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"901","AssetID":"S - PORA - 11","map___license_area":"Scotland / SHEPD","Substation":"Stonefield Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 12","name":"Tarbert, Jura Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"902","AssetID":"S - PORA - 12","map___license_area":"Scotland / SHEPD","Substation":"Tarbert, Jura Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.01","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - PORA - 13","name":"Tarbert, Loch Fyne Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Port Ann GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"903","AssetID":"S - PORA - 13","map___license_area":"Scotland / SHEPD","Substation":"Tarbert, Loch Fyne Primary","Upstream GSP":"Port Ann GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.09","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"1.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Dec-27","Substation Reinforcement Completion Date":null}},{"id":"S - QUOI - 01","name":"Quoich GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"904","AssetID":"S - QUOI - 01","map___license_area":"Scotland / SHEPD","Substation":"Quoich GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 30MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.90","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"21.85","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"13.68","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - RANN - 01","name":"Rannoch GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"905","AssetID":"S - RANN - 01","map___license_area":"Scotland / SHEPD","Substation":"Rannoch GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.27","minimum_observed_gross_demand__mva_":"2.46","contracted_demand_excl_bess__mva_":"0.75","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"62.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.21","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - RANN - 02","name":"Blackmount Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Rannoch GSP","upstreamBsp":"N/A","demand":{"raw":"0.04","value":"0.04","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.05","value":"0.05","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"906","AssetID":"S - RANN - 02","map___license_area":"Scotland / SHEPD","Substation":"Blackmount Primary","Upstream GSP":"Rannoch GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.05MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.04","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.05","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - RANN - 03","name":"Bridge of Gaur Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Rannoch GSP","upstreamBsp":"N/A","demand":{"raw":"0.94","value":"0.94","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"1.01","value":"1.01","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"907","AssetID":"S - RANN - 03","map___license_area":"Scotland / SHEPD","Substation":"Bridge of Gaur Primary","Upstream GSP":"Rannoch GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.20","minimum_observed_gross_demand__mva_":"0.06","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.94","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"1.01","unsafe_3_phase_break_fault_rating__ka_":"6.00","unsafe_3_phase_break_fault_level__ka_":"0.85","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - RANN - 04","name":"Kinloch Rannoch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Rannoch GSP","upstreamBsp":"N/A","demand":{"raw":"1.89","value":"1.89","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.48","value":"0.48","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"908","AssetID":"S - RANN - 04","map___license_area":"Scotland / SHEPD","Substation":"Kinloch Rannoch Primary","Upstream GSP":"Rannoch GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.00","minimum_observed_gross_demand__mva_":"0.14","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.89","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.62","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.48","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"1.92","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - RANN - 05","name":"Tyndrum Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Rannoch GSP","upstreamBsp":"N/A","demand":{"raw":"0.39","value":"0.39","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"1.20","value":"1.20","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"909","AssetID":"S - RANN - 05","map___license_area":"Scotland / SHEPD","Substation":"Tyndrum Primary","Upstream GSP":"Rannoch GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.04","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.48","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.39","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.56","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"1.20","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"1.34","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - REDM - 01","name":"Redmoss GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"110.96","technicalLimits":"No","rawSource":{"_id":"910","AssetID":"S - REDM - 01","map___license_area":"Scotland / SHEPD","Substation":"Redmoss GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"53.55","minimum_observed_gross_demand__mva_":"3.88","contracted_demand_excl_bess__mva_":"30.14","contracted_bess_demand__mva_":"110.96","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"77.55","contracted_generation__mw_":"132.12","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"12.73","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-31","Substation Reinforcement Completion Date":null}},{"id":"S - REDM - 02","name":"Craiginches Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Redmoss GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"911","AssetID":"S - REDM - 02","map___license_area":"Scotland / SHEPD","Substation":"Craiginches Primary","Upstream GSP":"Redmoss GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"11.79","minimum_observed_gross_demand__mva_":"1.93","contracted_demand_excl_bess__mva_":"1.90","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.54","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"21.90","unsafe_3_phase_break_fault_level__ka_":"8.60","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - REDM - 03","name":"Kincorth Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Redmoss GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"4.75","technicalLimits":"No","rawSource":{"_id":"912","AssetID":"S - REDM - 03","map___license_area":"Scotland / SHEPD","Substation":"Kincorth Primary","Upstream GSP":"Redmoss GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.48","minimum_observed_gross_demand__mva_":"1.18","contracted_demand_excl_bess__mva_":"6.72","contracted_bess_demand__mva_":"4.75","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"5.08","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"8.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - REDM - 04","name":"Newtonhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Redmoss GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"913","AssetID":"S - REDM - 04","map___license_area":"Scotland / SHEPD","Substation":"Newtonhill Primary","Upstream GSP":"Redmoss GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"10.02","minimum_observed_gross_demand__mva_":"2.28","contracted_demand_excl_bess__mva_":"6.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"3.26","contracted_generation__mw_":"0.30","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.58","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - REDM - 05","name":"Redmoss Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Redmoss GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"914","AssetID":"S - REDM - 05","map___license_area":"Scotland / SHEPD","Substation":"Redmoss Primary","Upstream GSP":"Redmoss GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 20 / 40MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"17.36","minimum_observed_gross_demand__mva_":"3.67","contracted_demand_excl_bess__mva_":"14.70","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.50","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"11.08","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - ROTI - 01","name":"Rothienorman GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"400 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"224.80","technicalLimits":"No","rawSource":{"_id":"915","AssetID":"S - ROTI - 01","map___license_area":"Scotland / SHEPD","Substation":"Rothienorman GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"400 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.34","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"224.80","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"16.80","contracted_generation__mw_":"230.80","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.95","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Mar-28"}},{"id":"S - SFEG - 01","name":"St Fergus GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Fault Level"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"916","AssetID":"S - SFEG - 01","map___license_area":"Scotland / SHEPD","Substation":"St Fergus GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.11","minimum_observed_gross_demand__mva_":"4.91","contracted_demand_excl_bess__mva_":"1.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"27.84","contracted_generation__mw_":"19.33","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"24.56","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Fault Level","Upstream Reinforcement Completion Date":"Nov-27","Substation Reinforcement Completion Date":"Nov-27"}},{"id":"S - SFIL - 01","name":"St Fillans GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"917","AssetID":"S - SFIL - 01","map___license_area":"Scotland / SHEPD","Substation":"St Fillans GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"1 x 25MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"5.82","minimum_observed_gross_demand__mva_":"0.76","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"26.98","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"31.50","unsafe_3_phase_break_fault_level__ka_":"13.30","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SFIL - 02","name":"Dalchonzie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"St Fillans GSP","upstreamBsp":"N/A","demand":{"raw":"4.44","value":"4.44","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"918","AssetID":"S - SFIL - 02","map___license_area":"Scotland / SHEPD","Substation":"Dalchonzie Primary","Upstream GSP":"St Fillans GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.25","minimum_observed_gross_demand__mva_":"0.32","contracted_demand_excl_bess__mva_":"0.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.44","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.28","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SHIN - 01","name":"Shin GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"919","AssetID":"S - SHIN - 01","map___license_area":"Scotland / SHEPD","Substation":"Shin GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.76","minimum_observed_gross_demand__mva_":"1.33","contracted_demand_excl_bess__mva_":"0.40","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"41.69","contracted_generation__mw_":"167.60","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.68","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-31","Substation Reinforcement Completion Date":null}},{"id":"S - SHIN - 02","name":"Gledfield Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shin GSP","upstreamBsp":"N/A","demand":{"raw":"1.73","value":"1.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"920","AssetID":"S - SHIN - 02","map___license_area":"Scotland / SHEPD","Substation":"Gledfield Primary","Upstream GSP":"Shin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.99","minimum_observed_gross_demand__mva_":"0.18","contracted_demand_excl_bess__mva_":"0.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SHIN - 03","name":"Shin Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Shin GSP","upstreamBsp":"N/A","demand":{"raw":"2.49","value":"2.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"921","AssetID":"S - SHIN - 03","map___license_area":"Scotland / SHEPD","Substation":"Shin Primary","Upstream GSP":"Shin GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.45","minimum_observed_gross_demand__mva_":"0.06","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"2.07","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SLOY - 01","name":"Sloy GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"922","AssetID":"S - SLOY - 01","map___license_area":"Scotland / SHEPD","Substation":"Sloy GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 50MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.29","minimum_observed_gross_demand__mva_":"2.05","contracted_demand_excl_bess__mva_":"1.62","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"79.47","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"40.00","unsafe_3_phase_break_fault_level__ka_":"30.31","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SPD- 01","name":"Strathleven GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"33 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"923","AssetID":"S - SPD- 01","map___license_area":"Scotland / SHEPD","Substation":"Strathleven GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 90MVA (Shared with SPEN)","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"24.16","minimum_observed_gross_demand__mva_":"8.03","contracted_demand_excl_bess__mva_":"2.61","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"29.84","contracted_generation__mw_":"29.95","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"10.88","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - SPD- 02","name":"Aberfoyle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strathleven GSP","upstreamBsp":"N/A","demand":{"raw":"3.46","value":"3.46","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"924","AssetID":"S - SPD- 02","map___license_area":"Scotland / SHEPD","Substation":"Aberfoyle Primary","Upstream GSP":"Strathleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.24","minimum_observed_gross_demand__mva_":"0.32","contracted_demand_excl_bess__mva_":"0.38","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.46","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.60","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.15","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"S - SPD- 03","name":"Blairlinnans Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strathleven GSP","upstreamBsp":"N/A","demand":{"raw":"2.37","value":"2.37","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"925","AssetID":"S - SPD- 03","map___license_area":"Scotland / SHEPD","Substation":"Blairlinnans Primary","Upstream GSP":"Strathleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.54","minimum_observed_gross_demand__mva_":"0.08","contracted_demand_excl_bess__mva_":"0.07","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.37","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.19","contracted_generation__mw_":"0.93","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.90","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":null}},{"id":"S - SPD- 04","name":"Drymen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strathleven GSP","upstreamBsp":"N/A","demand":{"raw":"4.15","value":"4.15","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"926","AssetID":"S - SPD- 04","map___license_area":"Scotland / SHEPD","Substation":"Drymen Primary","Upstream GSP":"Strathleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 6MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.62","minimum_observed_gross_demand__mva_":"0.38","contracted_demand_excl_bess__mva_":"0.53","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.15","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.24","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.74","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-27"}},{"id":"S - SPD- 05","name":"Kepculloch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strathleven GSP","upstreamBsp":"N/A","demand":{"raw":"2.31","value":"2.31","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"927","AssetID":"S - SPD- 05","map___license_area":"Scotland / SHEPD","Substation":"Kepculloch Primary","Upstream GSP":"Strathleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.09","minimum_observed_gross_demand__mva_":"0.44","contracted_demand_excl_bess__mva_":"1.18","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.31","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.56","contracted_generation__mw_":"0.02","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.22","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Mar-30"}},{"id":"S - SPD- 06","name":"Killearn Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strathleven GSP","upstreamBsp":"N/A","demand":{"raw":"3.67","value":"3.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"928","AssetID":"S - SPD- 06","map___license_area":"Scotland / SHEPD","Substation":"Killearn Primary","Upstream GSP":"Strathleven GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.96","minimum_observed_gross_demand__mva_":"0.28","contracted_demand_excl_bess__mva_":"0.46","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.69","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Mar-30","Substation Reinforcement Completion Date":"Jun-27"}},{"id":"S - SPD- 07","name":"Dumfin 11kV Network","area":"Scotland / SHEPD","level":"Primary","voltageKv":"11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"4.19","value":"4.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.49","value":"0.49","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"929","AssetID":"S - SPD- 07","map___license_area":"Scotland / SHEPD","Substation":"Dumfin 11kV Network","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"11","Transformer Nameplate Ratings":"N/A","Single Transformer Site":"N/A","maximum_observed_gross_demand__mva_":"1.29","minimum_observed_gross_demand__mva_":"0.49","contracted_demand_excl_bess__mva_":"0.35","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"4.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.49","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 01","name":"Strichen GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"103.20","technicalLimits":"Yes","rawSource":{"_id":"930","AssetID":"S - STRI - 01","map___license_area":"Scotland / SHEPD","Substation":"Strichen GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"19.28","minimum_observed_gross_demand__mva_":"1.41","contracted_demand_excl_bess__mva_":"52.72","contracted_bess_demand__mva_":"103.20","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"35.60","contracted_generation__mw_":"188.05","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"10.80","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 02","name":"Hatton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"931","AssetID":"S - STRI - 02","map___license_area":"Scotland / SHEPD","Substation":"Hatton Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.18","minimum_observed_gross_demand__mva_":"0.46","contracted_demand_excl_bess__mva_":"0.24","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.49","contracted_generation__mw_":"0.36","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 03","name":"Maud Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"932","AssetID":"S - STRI - 03","map___license_area":"Scotland / SHEPD","Substation":"Maud Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.24","minimum_observed_gross_demand__mva_":"0.47","contracted_demand_excl_bess__mva_":"0.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"1.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-30","Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 04","name":"Mintlaw Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"933","AssetID":"S - STRI - 04","map___license_area":"Scotland / SHEPD","Substation":"Mintlaw Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.39","minimum_observed_gross_demand__mva_":"0.92","contracted_demand_excl_bess__mva_":"2.23","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"3.47","contracted_generation__mw_":"0.09","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"6.53","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"May-30","Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 05","name":"New Pitsligo Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"1.10","value":"1.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"934","AssetID":"S - STRI - 05","map___license_area":"Scotland / SHEPD","Substation":"New Pitsligo Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"2.09","minimum_observed_gross_demand__mva_":"0.30","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.74","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-26"}},{"id":"S - STRI - 06","name":"Stoneyhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"3.75","value":"3.75","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"935","AssetID":"S - STRI - 06","map___license_area":"Scotland / SHEPD","Substation":"Stoneyhill Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.15","minimum_observed_gross_demand__mva_":"0.31","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.75","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.94","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"3.07","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - STRI - 07","name":"Strichen Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Strichen GSP","upstreamBsp":"N/A","demand":{"raw":"5.68","value":"5.68","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"Yes","rawSource":{"_id":"936","AssetID":"S - STRI - 07","map___license_area":"Scotland / SHEPD","Substation":"Strichen Primary","Upstream GSP":"Strichen GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.03","minimum_observed_gross_demand__mva_":"0.58","contracted_demand_excl_bess__mva_":"0.49","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"5.68","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"7.03","contracted_generation__mw_":"0.65","Technical Limits Agreed at GSP":"Yes","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"10.31","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TARL - 01","name":"Tarland GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"52.53","technicalLimits":"No","rawSource":{"_id":"937","AssetID":"S - TARL - 01","map___license_area":"Scotland / SHEPD","Substation":"Tarland GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 30MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"18.53","minimum_observed_gross_demand__mva_":"3.92","contracted_demand_excl_bess__mva_":"5.96","contracted_bess_demand__mva_":"52.53","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"28.65","contracted_generation__mw_":"102.30","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"7.13","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TARL - 02","name":"Aboyne Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tarland GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"938","AssetID":"S - TARL - 02","map___license_area":"Scotland / SHEPD","Substation":"Aboyne Primary","Upstream GSP":"Tarland GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"6.30","minimum_observed_gross_demand__mva_":"0.91","contracted_demand_excl_bess__mva_":"1.65","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"5.44","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-30","Substation Reinforcement Completion Date":null}},{"id":"S - TARL - 03","name":"Ballater Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tarland GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"939","AssetID":"S - TARL - 03","map___license_area":"Scotland / SHEPD","Substation":"Ballater Primary","Upstream GSP":"Tarland GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.83","minimum_observed_gross_demand__mva_":"0.84","contracted_demand_excl_bess__mva_":"0.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"2.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"4.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jan-30","Substation Reinforcement Completion Date":null}},{"id":"S - TARL - 04","name":"Mossat Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tarland GSP","upstreamBsp":"N/A","demand":{"raw":"0.14","value":"0.14","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"940","AssetID":"S - TARL - 04","map___license_area":"Scotland / SHEPD","Substation":"Mossat Primary","Upstream GSP":"Tarland GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.69","minimum_observed_gross_demand__mva_":"0.24","contracted_demand_excl_bess__mva_":"2.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.14","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.21","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"16.00","unsafe_3_phase_break_fault_level__ka_":"2.64","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-27","Substation Reinforcement Completion Date":"Mar-29"}},{"id":"S - TARL - 05","name":"Strathdon Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tarland GSP","upstreamBsp":"N/A","demand":{"raw":"1.92","value":"1.92","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"941","AssetID":"S - TARL - 05","map___license_area":"Scotland / SHEPD","Substation":"Strathdon Primary","Upstream GSP":"Tarland GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.93","minimum_observed_gross_demand__mva_":"0.13","contracted_demand_excl_bess__mva_":"0.17","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.92","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.08","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.62","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-27","Substation Reinforcement Completion Date":null}},{"id":"S - TARL - 06","name":"Whitehouse Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tarland GSP","upstreamBsp":"N/A","demand":{"raw":"2.76","value":"2.76","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"942","AssetID":"S - TARL - 06","map___license_area":"Scotland / SHEPD","Substation":"Whitehouse Primary","Upstream GSP":"Tarland GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"4.35","minimum_observed_gross_demand__mva_":"0.63","contracted_demand_excl_bess__mva_":"1.11","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.76","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"2.40","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.26","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 01","name":"Taynuilt GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"52.53","technicalLimits":"No","rawSource":{"_id":"943","AssetID":"S - TAYN - 01","map___license_area":"Scotland / SHEPD","Substation":"Taynuilt GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"33.15","minimum_observed_gross_demand__mva_":"8.03","contracted_demand_excl_bess__mva_":"13.16","contracted_bess_demand__mva_":"52.53","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"70.44","contracted_generation__mw_":"216.67","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.39","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 02","name":"Barcaldine Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"3.49","value":"3.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"944","AssetID":"S - TAYN - 02","map___license_area":"Scotland / SHEPD","Substation":"Barcaldine Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.86","minimum_observed_gross_demand__mva_":"1.18","contracted_demand_excl_bess__mva_":"2.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.90","contracted_generation__mw_":"0.52","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.57","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 03","name":"Connel Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"945","AssetID":"S - TAYN - 03","map___license_area":"Scotland / SHEPD","Substation":"Connel Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.56","minimum_observed_gross_demand__mva_":"0.22","contracted_demand_excl_bess__mva_":"0.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"4.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 04","name":"Dalmally Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"1.08","value":"1.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"946","AssetID":"S - TAYN - 04","map___license_area":"Scotland / SHEPD","Substation":"Dalmally Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.09","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.90","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 05","name":"Dalmally School Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.07","value":"0.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"947","AssetID":"S - TAYN - 05","map___license_area":"Scotland / SHEPD","Substation":"Dalmally School Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.315MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.31","minimum_observed_gross_demand__mva_":"0.04","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 06","name":"Dervaig Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"948","AssetID":"S - TAYN - 06","map___license_area":"Scotland / SHEPD","Substation":"Dervaig Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4 / 8MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.40","minimum_observed_gross_demand__mva_":"0.49","contracted_demand_excl_bess__mva_":"0.55","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"4.91","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.64","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Sep-31","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 07","name":"Eredine Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.19","value":"0.19","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"949","AssetID":"S - TAYN - 07","map___license_area":"Scotland / SHEPD","Substation":"Eredine Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.04","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.19","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.21","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 08","name":"Kenmore Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"1.64","value":"1.64","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"950","AssetID":"S - TAYN - 08","map___license_area":"Scotland / SHEPD","Substation":"Kenmore Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.13","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.64","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"1.42","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 09","name":"Kerrera Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"951","AssetID":"S - TAYN - 09","map___license_area":"Scotland / SHEPD","Substation":"Kerrera Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.3MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.06","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.30","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-26","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 10","name":"Kilchrenan Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.43","value":"0.43","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"952","AssetID":"S - TAYN - 10","map___license_area":"Scotland / SHEPD","Substation":"Kilchrenan Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.73","minimum_observed_gross_demand__mva_":"0.10","contracted_demand_excl_bess__mva_":"0.05","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.43","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.33","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.01","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 11","name":"Kilmelford Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"953","AssetID":"S - TAYN - 11","map___license_area":"Scotland / SHEPD","Substation":"Kilmelford Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.93","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"0.32","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.35","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"1.75","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-34","Substation Reinforcement Completion Date":"Apr-34"}},{"id":"S - TAYN - 12","name":"Kilninver Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.86","value":"0.86","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"954","AssetID":"S - TAYN - 12","map___license_area":"Scotland / SHEPD","Substation":"Kilninver Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.91","minimum_observed_gross_demand__mva_":"0.27","contracted_demand_excl_bess__mva_":"0.31","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.86","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.08","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"8.00","unsafe_3_phase_break_fault_level__ka_":"1.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 13","name":"Kinloch Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"955","AssetID":"S - TAYN - 13","map___license_area":"Scotland / SHEPD","Substation":"Kinloch Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.37","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.99","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.05","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-29","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 14","name":"Lochdonhead Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"956","AssetID":"S - TAYN - 14","map___license_area":"Scotland / SHEPD","Substation":"Lochdonhead Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.85","minimum_observed_gross_demand__mva_":"0.19","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"0.93","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-26","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 15","name":"Oban Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"957","AssetID":"S - TAYN - 15","map___license_area":"Scotland / SHEPD","Substation":"Oban Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.32","minimum_observed_gross_demand__mva_":"3.54","contracted_demand_excl_bess__mva_":"5.54","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity & Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"6.66","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-27","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 16","name":"Salen, Acharacle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"958","AssetID":"S - TAYN - 16","map___license_area":"Scotland / SHEPD","Substation":"Salen, Acharacle Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 6.3MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.97","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"1.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-26","Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 17","name":"Scammadale Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.06","value":"0.06","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"959","AssetID":"S - TAYN - 17","map___license_area":"Scotland / SHEPD","Substation":"Scammadale Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.05","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.06","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 18","name":"Taynuilt Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"1.48","value":"1.48","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"960","AssetID":"S - TAYN - 18","map___license_area":"Scotland / SHEPD","Substation":"Taynuilt Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 2.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"1.06","minimum_observed_gross_demand__mva_":"0.15","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.48","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"4.32","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TAYN - 19","name":"Tiroran Bridge Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Taynuilt GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Voltage Constraint"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"961","AssetID":"S - TAYN - 19","map___license_area":"Scotland / SHEPD","Substation":"Tiroran Bridge Primary","Upstream GSP":"Taynuilt GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.03","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Voltage Constraint","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.19","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Aug-26","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 01","name":"Thurso South GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"222.95","technicalLimits":"No","rawSource":{"_id":"962","AssetID":"S - THSO - 01","map___license_area":"Scotland / SHEPD","Substation":"Thurso South GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 120MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"45.30","minimum_observed_gross_demand__mva_":"19.41","contracted_demand_excl_bess__mva_":"52.27","contracted_bess_demand__mva_":"222.95","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"129.98","contracted_generation__mw_":"380.45","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"11.99","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - THSO - 02","name":"Burgar Hill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"963","AssetID":"S - THSO - 02","map___license_area":"Scotland / SHEPD","Substation":"Burgar Hill Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 8MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.86","minimum_observed_gross_demand__mva_":"0.41","contracted_demand_excl_bess__mva_":"0.09","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.47","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 03","name":"Eday Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"964","AssetID":"S - THSO - 03","map___license_area":"Scotland / SHEPD","Substation":"Eday Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.21","minimum_observed_gross_demand__mva_":"0.03","contracted_demand_excl_bess__mva_":"0.56","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.51","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 04","name":"Eday Tidal Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"965","AssetID":"S - THSO - 04","map___license_area":"Scotland / SHEPD","Substation":"Eday Tidal Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4 / 8MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.00","minimum_observed_gross_demand__mva_":"0.00","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"4.66","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.75","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 05","name":"Flotta Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"1.53","value":"1.53","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"966","AssetID":"S - THSO - 05","map___license_area":"Scotland / SHEPD","Substation":"Flotta Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.42","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.53","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.07","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.77","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 06","name":"Halkirk Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.04","value":"0.04","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"967","AssetID":"S - THSO - 06","map___license_area":"Scotland / SHEPD","Substation":"Halkirk Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.02","minimum_observed_gross_demand__mva_":"0.42","contracted_demand_excl_bess__mva_":"0.27","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.04","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"20.00","unsafe_3_phase_break_fault_level__ka_":"1.93","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - THSO - 07","name":"Hastigrow Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"968","AssetID":"S - THSO - 07","map___license_area":"Scotland / SHEPD","Substation":"Hastigrow Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.75","minimum_observed_gross_demand__mva_":"0.40","contracted_demand_excl_bess__mva_":"0.45","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.48","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.77","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 08","name":"Kirkwall Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"969","AssetID":"S - THSO - 08","map___license_area":"Scotland / SHEPD","Substation":"Kirkwall Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"15.18","minimum_observed_gross_demand__mva_":"2.84","contracted_demand_excl_bess__mva_":"2.95","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"16.57","contracted_generation__mw_":"7.50","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.92","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 09","name":"Lyness Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.25","value":"0.25","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"970","AssetID":"S - THSO - 09","map___license_area":"Scotland / SHEPD","Substation":"Lyness Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.93","minimum_observed_gross_demand__mva_":"0.13","contracted_demand_excl_bess__mva_":"0.01","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.25","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"0.92","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Nov-26"}},{"id":"S - THSO - 10","name":"Mount Pleasant Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"3.49","value":"3.49","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"971","AssetID":"S - THSO - 10","map___license_area":"Scotland / SHEPD","Substation":"Mount Pleasant Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.76","minimum_observed_gross_demand__mva_":"1.20","contracted_demand_excl_bess__mva_":"1.44","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.49","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.45","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"9.83","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-26"}},{"id":"S - THSO - 11","name":"North Hoy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.16","value":"0.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"972","AssetID":"S - THSO - 11","map___license_area":"Scotland / SHEPD","Substation":"North Hoy Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.2MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.08","minimum_observed_gross_demand__mva_":"0.02","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"0.20","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 12","name":"Ormlie Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"9.87","value":"9.87","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"973","AssetID":"S - THSO - 12","map___license_area":"Scotland / SHEPD","Substation":"Ormlie Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.20","minimum_observed_gross_demand__mva_":"0.61","contracted_demand_excl_bess__mva_":"0.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"9.87","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.21","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.06","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 13","name":"Rackwick Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.10","value":"0.10","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"974","AssetID":"S - THSO - 13","map___license_area":"Scotland / SHEPD","Substation":"Rackwick Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.02","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.10","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"N/A","unsafe_3_phase_break_fault_level__ka_":"N/A","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 14","name":"Rousay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"975","AssetID":"S - THSO - 14","map___license_area":"Scotland / SHEPD","Substation":"Rousay Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.74","minimum_observed_gross_demand__mva_":"0.11","contracted_demand_excl_bess__mva_":"0.02","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.86","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.65","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 15","name":"Sanday Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"976","AssetID":"S - THSO - 15","map___license_area":"Scotland / SHEPD","Substation":"Sanday Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.78","minimum_observed_gross_demand__mva_":"0.11","contracted_demand_excl_bess__mva_":"0.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"0.87","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":"Mar-26"}},{"id":"S - THSO - 16","name":"Shapinsay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"977","AssetID":"S - THSO - 16","map___license_area":"Scotland / SHEPD","Substation":"Shapinsay Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.32","minimum_observed_gross_demand__mva_":"0.05","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"1.73","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 17","name":"St Mary's Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"978","AssetID":"S - THSO - 17","map___license_area":"Scotland / SHEPD","Substation":"St Mary's Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"4.44","minimum_observed_gross_demand__mva_":"0.64","contracted_demand_excl_bess__mva_":"0.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.72","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 18","name":"Stromness Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"2.39","value":"2.39","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"979","AssetID":"S - THSO - 18","map___license_area":"Scotland / SHEPD","Substation":"Stromness Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 7.5 / 15MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.45","minimum_observed_gross_demand__mva_":"1.16","contracted_demand_excl_bess__mva_":"0.29","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.39","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"7.51","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"5.23","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 19","name":"Stronsay Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"980","AssetID":"S - THSO - 19","map___license_area":"Scotland / SHEPD","Substation":"Stronsay Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.36","minimum_observed_gross_demand__mva_":"0.05","contracted_demand_excl_bess__mva_":"0.04","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.16","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - THSO - 20","name":"Westray Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Thurso South GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity & Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"981","AssetID":"S - THSO - 20","map___license_area":"Scotland / SHEPD","Substation":"Westray Primary","Upstream GSP":"Thurso South GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 4MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.17","minimum_observed_gross_demand__mva_":"0.17","contracted_demand_excl_bess__mva_":"0.08","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Upstream Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"2.66","contracted_generation__mw_":"0.05","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"2.04","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity & Upstream Thermal Capacity","Upstream Reinforcement Completion Date":"Jun-29","Substation Reinforcement Completion Date":null}},{"id":"S - TUMB - 01","name":"Tummel Bridge GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 11","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Red","constraint":"Substation Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"982","AssetID":"S - TUMB - 01","map___license_area":"Scotland / SHEPD","Substation":"Tummel Bridge GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 11","Transformer Nameplate Ratings":"2 x 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"14.89","minimum_observed_gross_demand__mva_":"6.06","contracted_demand_excl_bess__mva_":"4.94","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"45.66","contracted_generation__mw_":"6.56","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"10.85","Substation Generation RAG Status":"Red","Generation Constraint":"Substation Thermal Capacity","Upstream Reinforcement Completion Date":"Apr-26","Substation Reinforcement Completion Date":"Sep-29"}},{"id":"S - TUMB - 02","name":"Aberfeldy Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"3.72","value":"3.72","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"983","AssetID":"S - TUMB - 02","map___license_area":"Scotland / SHEPD","Substation":"Aberfeldy Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 4 / 8MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.72","minimum_observed_gross_demand__mva_":"0.64","contracted_demand_excl_bess__mva_":"0.33","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"3.72","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.42","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.56","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TUMB - 03","name":"Bonskeid Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"2.38","value":"2.38","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"984","AssetID":"S - TUMB - 03","map___license_area":"Scotland / SHEPD","Substation":"Bonskeid Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"3.34","minimum_observed_gross_demand__mva_":"0.48","contracted_demand_excl_bess__mva_":"0.30","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.38","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.43","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"2.76","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TUMB - 04","name":"Calvine Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"1.16","value":"1.16","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"985","AssetID":"S - TUMB - 04","map___license_area":"Scotland / SHEPD","Substation":"Calvine Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.44","minimum_observed_gross_demand__mva_":"0.21","contracted_demand_excl_bess__mva_":"0.59","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.16","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.10","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.50","unsafe_3_phase_break_fault_level__ka_":"1.54","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Feb-27"}},{"id":"S - TUMB - 05","name":"Coshieville Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"986","AssetID":"S - TUMB - 05","map___license_area":"Scotland / SHEPD","Substation":"Coshieville Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"2.40","minimum_observed_gross_demand__mva_":"0.35","contracted_demand_excl_bess__mva_":"1.43","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"1.69","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.81","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Dec-27"}},{"id":"S - TUMB - 06","name":"Fincastle Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.08","value":"0.08","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"987","AssetID":"S - TUMB - 06","map___license_area":"Scotland / SHEPD","Substation":"Fincastle Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 0.1MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"0.04","minimum_observed_gross_demand__mva_":"0.01","contracted_demand_excl_bess__mva_":"0.00","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.08","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"12.00","unsafe_3_phase_break_fault_level__ka_":"0.10","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TUMB - 07","name":"Pitlochry Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"0.73","value":"0.73","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"988","AssetID":"S - TUMB - 07","map___license_area":"Scotland / SHEPD","Substation":"Pitlochry Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.89","minimum_observed_gross_demand__mva_":"0.56","contracted_demand_excl_bess__mva_":"2.06","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.73","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.64","contracted_generation__mw_":"0.10","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"3.59","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - TUMB - 08","name":"Tummel Bridge Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Tummel Bridge GSP","upstreamBsp":"N/A","demand":{"raw":"1.45","value":"1.45","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"0.00","value":"0.00","unit":"MW","availability":"reported-numeric","rag":"Red","constraint":"Upstream Thermal Capacity"},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"989","AssetID":"S - TUMB - 08","map___license_area":"Scotland / SHEPD","Substation":"Tummel Bridge Primary","Upstream GSP":"Tummel Bridge GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"1 x 2.5MVA","Single Transformer Site":"Yes","maximum_observed_gross_demand__mva_":"1.41","minimum_observed_gross_demand__mva_":"0.20","contracted_demand_excl_bess__mva_":"0.15","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"1.45","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"0.00","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"1.86","Substation Generation RAG Status":"Red","Generation Constraint":"Upstream Thermal Capacity","Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WIOW - 01","name":"Willowdale GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"2.22","technicalLimits":"No","rawSource":{"_id":"990","AssetID":"S - WIOW - 01","map___license_area":"Scotland / SHEPD","Substation":"Willowdale GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 60MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"25.08","minimum_observed_gross_demand__mva_":"11.74","contracted_demand_excl_bess__mva_":"6.30","contracted_bess_demand__mva_":"2.22","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.26","contracted_generation__mw_":"2.16","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"17.50","unsafe_3_phase_break_fault_level__ka_":"12.30","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WIOW - 02","name":"Denburn Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Willowdale GSP","upstreamBsp":"N/A","demand":{"raw":"7.87","value":"7.87","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"20.09","value":"20.09","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"991","AssetID":"S - WIOW - 02","map___license_area":"Scotland / SHEPD","Substation":"Denburn Primary","Upstream GSP":"Willowdale GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.06","minimum_observed_gross_demand__mva_":"1.74","contracted_demand_excl_bess__mva_":"0.78","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"7.87","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"20.09","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"8.60","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WIOW - 03","name":"Greyfriars Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Willowdale GSP","upstreamBsp":"N/A","demand":{"raw":"11.07","value":"11.07","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"21.61","value":"21.61","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"992","AssetID":"S - WIOW - 03","map___license_area":"Scotland / SHEPD","Substation":"Greyfriars Primary","Upstream GSP":"Willowdale GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"8.22","minimum_observed_gross_demand__mva_":"1.74","contracted_demand_excl_bess__mva_":"4.69","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"11.07","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.95","contracted_generation__mw_":"0.16","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"21.61","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.47","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WIOW - 04","name":"Hayton Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Willowdale GSP","upstreamBsp":"N/A","demand":{"raw":"18.67","value":"18.67","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"19.29","value":"19.29","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"993","AssetID":"S - WIOW - 04","map___license_area":"Scotland / SHEPD","Substation":"Hayton Primary","Upstream GSP":"Willowdale GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 11.5 / 23MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"3.49","minimum_observed_gross_demand__mva_":"0.50","contracted_demand_excl_bess__mva_":"0.26","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"18.67","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.32","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"19.29","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.00","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WIOW - 05","name":"St Nicholas Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Willowdale GSP","upstreamBsp":"N/A","demand":{"raw":"10.02","value":"10.02","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"16.69","value":"16.69","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"994","AssetID":"S - WIOW - 05","map___license_area":"Scotland / SHEPD","Substation":"St Nicholas Primary","Upstream GSP":"Willowdale GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"5.94","minimum_observed_gross_demand__mva_":"1.21","contracted_demand_excl_bess__mva_":"0.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"10.02","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"16.69","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.29","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WOHI - 01","name":"Woodhill GSP","area":"Scotland / SHEPD","level":"GSP","voltageKv":"132 / 33","upstreamGsp":"N/A","upstreamBsp":"N/A","demand":{"raw":"N/A","value":null,"unit":"MVA","availability":"source-not-available","rag":"Green","constraint":null},"generation":{"raw":"N/A","value":null,"unit":"MW","availability":"source-not-available","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"995","AssetID":"S - WOHI - 01","map___license_area":"Scotland / SHEPD","Substation":"Woodhill GSP","Upstream GSP":"N/A","Upstream BSP":"N/A","Substation Type":"GSP","voltage__kv_":"132 / 33","Transformer Nameplate Ratings":"2 x 90MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"34.84","minimum_observed_gross_demand__mva_":"15.74","contracted_demand_excl_bess__mva_":"12.58","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"N/A","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"2.16","contracted_generation__mw_":"0.21","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"N/A","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"11.55","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}},{"id":"S - WOHI - 02","name":"Queens Lane North Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Woodhill GSP","upstreamBsp":"N/A","demand":{"raw":"2.41","value":"2.41","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"13.18","value":"13.18","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"996","AssetID":"S - WOHI - 02","map___license_area":"Scotland / SHEPD","Substation":"Queens Lane North Primary","Upstream GSP":"Woodhill GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 10 / 12.5MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"9.19","minimum_observed_gross_demand__mva_":"2.25","contracted_demand_excl_bess__mva_":"0.89","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"2.41","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"0.00","contracted_generation__mw_":"0.00","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"13.18","unsafe_3_phase_break_fault_rating__ka_":"18.40","unsafe_3_phase_break_fault_level__ka_":"8.24","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Jun-29"}},{"id":"S - WOHI - 03","name":"Springhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Woodhill GSP","upstreamBsp":"N/A","demand":{"raw":"0.00","value":"0.00","unit":"MVA","availability":"reported-numeric","rag":"Red","constraint":"Substation Thermal Capacity"},"generation":{"raw":"22.01","value":"22.01","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"997","AssetID":"S - WOHI - 03","map___license_area":"Scotland / SHEPD","Substation":"Springhill Primary","Upstream GSP":"Woodhill GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 15 / 21MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"13.83","minimum_observed_gross_demand__mva_":"4.06","contracted_demand_excl_bess__mva_":"5.87","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"0.00","Substation Demand RAG Status":"Red","Demand Constraint":"Substation Thermal Capacity","TIA Threshold":"200kW","connected_generation__mw_":"0.26","contracted_generation__mw_":"0.15","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"22.01","unsafe_3_phase_break_fault_rating__ka_":"25.00","unsafe_3_phase_break_fault_level__ka_":"8.64","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":"Oct-27"}},{"id":"S - WOHI - 04","name":"Woodhill Primary","area":"Scotland / SHEPD","level":"Primary","voltageKv":"33 / 11","upstreamGsp":"Woodhill GSP","upstreamBsp":"N/A","demand":{"raw":"6.27","value":"6.27","unit":"MVA","availability":"reported-numeric","rag":"Green","constraint":null},"generation":{"raw":"20.87","value":"20.87","unit":"MW","availability":"reported-numeric","rag":"Green","constraint":null},"contractedBessDemandMva":"0.00","technicalLimits":"No","rawSource":{"_id":"998","AssetID":"S - WOHI - 04","map___license_area":"Scotland / SHEPD","Substation":"Woodhill Primary","Upstream GSP":"Woodhill GSP","Upstream BSP":"N/A","Substation Type":"Primary","voltage__kv_":"33 / 11","Transformer Nameplate Ratings":"2 x 12 / 24MVA","Single Transformer Site":"No","maximum_observed_gross_demand__mva_":"12.82","minimum_observed_gross_demand__mva_":"1.85","contracted_demand_excl_bess__mva_":"5.81","contracted_bess_demand__mva_":"0.00","estimated_demand_headroom__mva_":"6.27","Substation Demand RAG Status":"Green","Demand Constraint":null,"TIA Threshold":"200kW","connected_generation__mw_":"1.89","contracted_generation__mw_":"0.06","Technical Limits Agreed at GSP":"No","estimated_generation_headroom__mw_":"20.87","unsafe_3_phase_break_fault_rating__ka_":"13.10","unsafe_3_phase_break_fault_level__ka_":"8.69","Substation Generation RAG Status":"Green","Generation Constraint":null,"Upstream Reinforcement Completion Date":null,"Substation Reinforcement Completion Date":null}}]}