Loading Solar Analytica
Loading Solar Analytica
Trace solar from operating capacity through the project queue to the generation recorded in each electricity market.
Live source, read 21 September 2026 at 05:26 UTC.
Capacity to realised output
MWac != MWh
Operating solar capacity
38 GW
25 GW distributed · 13 GW utility-scale
Prospective utility-scale pipeline
117 GW
30 GW with a 2026-30 year tag · 87 GW without a named year
Named commissioning window · MWac
2026
9.0 GW
2027
7.7 GW
2028
6.5 GW
2029
3.4 GW
2030
3.8 GW
Annual solar share
19.7%
Scheduled 2026-30
30 GW
Operating capacity
38 GW
Pipeline without date
87 GW
GEM’s operating total includes distributed and utility-scale solar. Its prospective total is utility-scale announced, pre-construction and construction capacity; it is a project pipeline, not a forecast of generation or a promise of commissioning. The year tiles show only capacity with a named year.