The primary operator and government feeds beneath Solar Analytica's grid record, with access, interval, reuse and derivation boundaries stated before the data is used.
Freshness, comparison and serving are separate gates.
A current operator file can still remain in shadow comparison. This register exposes the latest aggregate batch receipt, comparison result and promotion state without redistributing private interval records.
Generated 21 Aug 2026
Australian Energy Market Operator
aemo-nem
Degraded
Five National Electricity Market regions
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
Observed
21 Aug 2026
0 day lag / SLA 3
Batch
Complete
26 inserted / 0 rejected
Comparison
32.5% pass
40 metrics
Serving
Legacy primary
Shadow
Promotion gate0/30 passing days
Australian Energy Market Operator
aemo-wem
Blocked
South West Interconnected System, Western Australia
The latest batch or comparison gate contains a blocking result.
Observed
21 Aug 2026
0 day lag / SLA 3
Batch
Complete
1 inserted / 0 rejected
Comparison
37.5% pass
8 metrics
Serving
Legacy primary
Shadow
Promotion gate0/30 passing days
U.S. Energy Information Administration
eia-930
Degraded
Selected United States balancing authorities and US48
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
Observed
18 Aug 2026
3 day lag / SLA 4
Batch
Complete
122 inserted / 0 rejected
Comparison
97.6% pass
123 metrics
Serving
Legacy primary
Shadow
Promotion gate1/30 passing days
ENTSO-E Transparency Platform
entsoe-transparency
Degraded
Germany-Luxembourg, France and Spain bidding zones
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
Observed
16 Aug 2026
5 day lag / SLA 3
Batch
Complete
5472 inserted / 0 rejected
Comparison
84.2% pass
76 metrics
Serving
Legacy primary
Shadow
Promotion gate0/30 passing days
Elexon
elexon-bmrs
Blocked
Great Britain
The latest batch or comparison gate contains a blocking result.
Observed
19 Aug 2026
2 day lag / SLA 3
Batch
Complete
1102 inserted / 0 rejected
Comparison
93.8% pass
16 metrics
Serving
Legacy primary
Blocked
Promotion gate0/30 passing days
Source
Health
Observation
Latest batch
Comparison
Promotion
Serving
Australian Energy Market Operator
aemo-nem
Five National Electricity Market regions
Degraded
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
21 Aug 2026
0 day lag / SLA 3
Complete
26 inserted / 0 rejected
21 Aug 2026
32.5% pass
40 metrics / 0 failed
4 Aug 2026
Shadow
0/30
Complete passing days
Legacy primary
Canonical feed remains shadowed
Australian Energy Market Operator
aemo-wem
South West Interconnected System, Western Australia
Blocked
The latest batch or comparison gate contains a blocking result.
21 Aug 2026
0 day lag / SLA 3
Complete
1 inserted / 0 rejected
21 Aug 2026
37.5% pass
8 metrics / 1 failed
31 July 2026
Shadow
0/30
Complete passing days
Legacy primary
Canonical feed remains shadowed
U.S. Energy Information Administration
eia-930
Selected United States balancing authorities and US48
Degraded
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
18 Aug 2026
3 day lag / SLA 4
Complete
122 inserted / 0 rejected
20 Aug 2026
97.6% pass
123 metrics / 0 failed
5 Aug 2026
Shadow
1/30
Complete passing days
Legacy primary
Canonical feed remains shadowed
ENTSO-E Transparency Platform
entsoe-transparency
Germany-Luxembourg, France and Spain bidding zones
Degraded
The latest batch or comparison gate contains partial, rejected, warning or unavailable records.
16 Aug 2026
5 day lag / SLA 3
Complete
5472 inserted / 0 rejected
17 Aug 2026
84.2% pass
76 metrics / 0 failed
4 Aug 2026
Shadow
0/30
Complete passing days
Legacy primary
Canonical feed remains shadowed
Elexon
elexon-bmrs
Great Britain
Blocked
The latest batch or comparison gate contains a blocking result.
19 Aug 2026
2 day lag / SLA 3
Complete
1102 inserted / 0 rejected
20 Aug 2026
93.8% pass
16 metrics / 1 failed
6 Aug 2026
Blocked
0/30
Complete passing days
Legacy primary
Canonical feed remains shadowed
Freshness
3 to 4 calendar-day operational SLA, depending on provider.
Comparison
Same metric, unit and declared calculation basis within tolerance.
Promotion
30 complete passing dates followed by manual review.
Serving
Legacy tables remain primary until explicit promotion.
Source landscape
Coverage, reuse and health in one read.
Public availability and redistribution permission remain separate. Operational health is live where the ledger is available; source terms and method boundaries remain fixed in the registry.
Primary feeds
5
Operator and government sources in the current registry.
Operationally current
0/5
Current against each source-specific freshness SLA.
Open reuse
1
Raw downstream reuse confirmed without a source-specific review gate.
Canonical serving
0
Feeds explicitly promoted after comparison and manual review.
Inspect access, credentials and redistribution boundaries
Australian Energy Market Operator
Public file download / None
Primary operator observations and raw rooftop PV report archives are retained privately. The Rooftop Forecast Record remains explicitly unavailable until a dataset-specific review approves the attributed interval values and derived comparisons in its public contract.
These sources are candidates, not live coverage. The score ranks implementation priority; every candidate still requires a reuse decision, canonical adapter, reconciliation proof and monitored production run before it can serve public observations.
Closest international comparison for a renewable-rich isolated national system, with direct relevance to Australian flexibility and market-design research.
Next gate: Record dataset-specific reuse terms, select the first interval series and run a 30-day adapter proof.
A large, low-carbon system with nuclear, hydro, variable renewables and interties that broadens the transition comparison beyond thermal-heavy markets.
Next gate: Confirm file-level terms and stable identifiers, then prove demand, generation and price reconciliation over 30 days.
A fast-changing energy-only market with thermal generation, wind, solar and storage relevance that can test the portability of NEM market-shape methods.
Next gate: Complete API registration and terms review, then map pool price and generation series into the canonical observation contract.
Priority21/30
Each criterion is scored 0 to 5. Total is unweighted out of 30. This is a Solar Analytica implementation-priority assessment, not a source quality ranking. A candidate remains outside canonical serving until licensing, adapter and reconciliation gates pass.
Retention contract
Source history remains inspectable.
01
Raw payload
Private source files are content-hashed and retained with their retrieval URL.
02
Canonical row
Market, zone, interval, metric, category, unit and evidence type follow one contract.
03
Revision
A changed source value creates another value hash. The prior observation is not overwritten.
04
Derived layer
Lifecycle carbon publishes only above the declared generation-factor coverage threshold.
Lifecycle factor register
Carbon is derived, not observed.
The production mix is weighted with IPCC lifecycle medians. This is not plant telemetry, marginal emissions, or consumption-based carbon accounting. Storage and imports are excluded; unmapped generation reduces coverage.