Versioned small-area rooftop-solar and battery adoption evidence.
Select any two retained editions. Status labels come from the publisher or the Solar Analytica release boundary; rows are never silently rewritten into the latest state.
| Field | swis-der-cer-2026-05-c6b6ad39b658 | swis-der-cer-2026-05-c6b6ad39b658 | Read |
|---|---|---|---|
| Release status | snapshot | snapshot | Unchanged |
| Published | 2026-07-15 | 2026-07-15 | Unchanged |
| Rows | 581 | 581 | Unchanged |
| Recorded changes | Not recorded | Not recorded | Unchanged |
| Area Count | 246 | 246 | Unchanged |
| Latest Period | 2026-05-01 | 2026-05-01 | Unchanged |
| Postcode Count | 335 | 335 | Unchanged |
ABS 2021 POA to SA2 residential Mesh Block share. Postal Areas approximate Australia Post postcodes. Records are allocated fractionally by each SA2's share of residential Mesh Blocks in the POA, with total Mesh Block share used only when a POA has no residential Mesh Blocks. This is a screening estimate, not premises-level geocoding.
Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.
Receipt resolution and dependency health are separate. A complete lineage path cannot make a recovering source decision-ready.
Resolution: immutable hash release for source version.
swis-der / swis-der-cer-2026-05-c6b6ad39b658
Source release: sourceReleaseDate satisfies the source_release date basis.
Freshness records which declared date satisfies the product's registered basis. Dependency causes describe upstream operational state. Neither establishes source correctness or a changed decision outcome.
No upstream product dependency is registered. This product is treated as a source or standalone evidence surface.
Recent certificate cohorts can be incomplete while installations move through validation.
Coverage: 335 postcodes allocated to 246 WA SA2s. Refresh contract: Monthly CER release.
All mandatory publication-contract fields are present.
This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.