Lowest operational demand
The registered-generation floor, before rooftop solar is added back.
- 0110 May 20261073 MW
- 0211 May 20261349 MW
- 0312 May 20261380 MW
- 042 Aug 20261402 MW
- 054 Aug 20261454 MW
The operating days where rooftop solar, minimum demand and the evening ramp expose what an isolated grid must still hold together.
The registered-generation floor, before rooftop solar is added back.
A low registered-demand day can still carry high underlying demand once rooftop PV is restored. A steep ramp is not automatically a failure. The point is to see which resources stayed online and what operating capability the system was using.
Behind-the-meter solar as a share of the underlying-demand proxy at its daily peak.
The rise from the daily operational-demand minimum to the evening operating peak.