Lowest operational demand
The registered-generation floor, before rooftop solar is added back.
- 013 Oct 2026890 MW
- 024 Oct 2026974 MW
- 032 Oct 2026982 MW
- 041 Oct 20261025 MW
- 0516 Aug 20261026 MW
Loading Solar Analytica
The operating days where rooftop solar, minimum demand and the evening ramp expose what an isolated grid must still hold together.
The registered-generation floor, before rooftop solar is added back.
A low registered-demand day can still carry high underlying demand once rooftop PV is restored. A steep ramp is not automatically a failure. The point is to see which resources stayed online and what operating capability the system was using.
Behind-the-meter solar as a share of the underlying-demand proxy at its daily peak.
The rise from the daily operational-demand minimum to the evening operating peak.