Monthly approved battery-list transition evidence around the 31 December 2027 cliff, with the inverter list retained as a separately labelled comparator.
Select any two retained editions. Status labels come from the publisher or the Solar Analytica release boundary; rows are never silently rewritten into the latest state.
| Field | ts5398-2026-08-18 | ts5398-2026-08-18 | Read |
|---|---|---|---|
| Release status | snapshot | snapshot | Unchanged |
| Published | 2026-08-23 | 2026-08-23 | Unchanged |
| Rows | 8,214 | 8,214 | Unchanged |
| Recorded changes | 0 | 0 | Unchanged |
| Battery | {"on":2947,"after":0,"total":3526,"before":579,"transition_share_pct":0} | {"on":2947,"after":0,"total":3526,"before":579,"transition_share_pct":0} | Unchanged |
| Inverter | {"on":2182,"after":767,"total":4688,"before":1739,"transition_share_pct":16.3609} | {"on":2182,"after":767,"total":4688,"before":1739,"transition_share_pct":16.3609} | Unchanged |
| Edition Date | 2026-08-18 | 2026-08-18 | Unchanged |
| Method Version | ts5398-transition-v1 | ts5398-transition-v1 | Unchanged |
| Material Change | No | No | Unchanged |
| Transition Cliff | 2027-12-31 | 2027-12-31 | Unchanged |
Baseline retained: batteries 0 of 3,526 and inverter comparator 767 of 4,688 after the transition cliff.
Suitable for the named scope when used with the published vintage, confidence and known limit. It is not a substitute for project-specific diligence.
Receipt resolution and dependency health are separate. A complete lineage path cannot make a recovering source decision-ready.
Resolution: direct exact version.
ts5398-transition-index / ts5398-2026-08-18
Source check: sourceCheckedAt satisfies the source_check date basis.
Freshness records which declared date satisfies the product's registered basis. Dependency causes describe upstream operational state. Neither establishes source correctness or a changed decision outcome.
derived; required. Current upstream version: certifications-2026-08-17.
none
dependency_current
The source files do not name the approval specification. A battery expiry after 31 December 2027 is an observable transition signature under the published rule, not direct proof of its specification. Inverter expiries are a same-date comparator only and do not imply SA TS 5398 compliance.
Coverage: Australian approved battery and inverter source-list rows. Refresh contract: Monthly from accepted weekly certification snapshots.
All mandatory publication-contract fields are present.
This receipt proves metadata completeness only. Independent source validation requires a separate recorded receipt.